Introduction
Introduction Statistics Contact Development Disclaimer Help
DTIC ADA200476: Feasibility of Sand Bypassing Systems for Reducing ...
by Defense Technical Information Center
Thumbnail
Download
Web page
This report provides a sand bypassing feasibility
analysis for the St. Mary's River entrance channel. The
study was conducted in connection with the development of
the US Navy's Trident submarine base in King's Bay, GA.
The analysis found that sand bypassing would not provide
a significant reduction in the total amount of
maintenance dredging required in the entrance channel,
but could provide for the a cost-effective means of
dredging disposal and beach nourishment.
Date Published: 2018-02-21 05:01:11
Identifier: DTIC_ADA200476
Item Size: 12932296
Language: english
Media Type: texts
# Topics
DTIC Archive; Richards, David R ; ARM...
# Collections
dticarchive
additional_collections
# Uploaded by
@chris85
# Similar Items
View similar items
PHAROS
You are viewing proxied material from tilde.pink. The copyright of proxied material belongs to its original authors. Any comments or complaints in relation to proxied material should be directed to the original authors of the content concerned. Please see the disclaimer for more details.