-----------------------------------------------------------------------------
Walkthrough: C R I T I C A L PATH
-----------------------------------------------------------------------------
Copyright 3/1994 Tobias Magnus, Berlin, Germany
If you got questions I would be happy if you contact me at CompuServe.
-----------------------------------------------------------------------------
Step by Step, here are the solutions for the CD-ROM Game: Critical Path
-----------------------------------------------------------------------------
1. TUNNEL DOORS: ->Press 1,2,3 and Red Button
2. MCL ESTABLISHED: ->Press 1,5,2 and Red Button
3. ORE CARTS: ->Press E (to stop)
4. CONVEYOR BELT: ->Again Press E (to start)
5. FURNACE: ->Press J (to open chute)
6. CRANE: ->Press G (to start)
7. Catwalks: ->First left,second left,first left,second right,
first right,first left,first right.
8. HALLWAY: ->Go to the right
9. PACKING ROOM: ->To the right (often+ff)
10. WATER TOWER: ->Press 666 and Red Button
11. TORTURE CHAMBER: ->Press 451 and Red Button
12. ELECTRIC CHAIR: ->Press 911 and Red Button
13. ELEVATOR SHAFT: ->Press N (sirens on)
-----------------------------------------------------------------------------