Good stuff. I can't wait to check it out!
The Dequindre Cut Greenway extension officially opens April 29.
The extension has been in the works since 2013, with the opening
pushed back multiple times.
According to a release from Link Detroit, the $21-million project
"connects 20 miles of continuous walking and biking paths linking
Downtown, Midtown, Detroit Riverfront, Eastern Market and
Hamtramck."
Source: [1]$21M Dequindre Cut connecting miles of land in Detroit opens
Friday | MLive.com
__________________________________________________________________
My original entry is here: [2]$21M Dequindre Cut connecting miles of
land in Detroit opens Friday | MLive.com. It posted Mon, 25 Apr 2016
16:21:42 +0000.
Filed under: Dequindre Cut, Downtown, Eastern Market, Events,
Hamtramck, Midtown, Riverfront,
References
Visible links
1.
http://www.mlive.com/news/detroit/index.ssf/2016/04/21m_dequindre_cut_connecting_m.html
2.
https://www.prjorgensen.com/2016/04/25/21m-dequindre-cut-connecting-miles-of-land-in-detroit-opens-friday-mlive-com/
Hidden links:
4.
http://www.mlive.com/news/detroit/index.ssf/2016/04/21m_dequindre_cut_connecting_m.html