(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .
NASA’s Dragonfly Rotorcraft Mission to Saturn’s Moon Titan Confirmed [1]
[]
Date: 2024-04
With the release of the president’s fiscal year 2025 budget request, Dragonfly is confirmed with a total lifecycle cost of $3.35 billion and a launch date of July 2028. This reflects a cost increase of about two times the proposed cost and a delay of more than two years from when the mission was originally selected in 2019. Following that selection, NASA had to direct the project to replan multiple times due to funding constraints in fiscal years 2020 through 2022. The project incurred additional costs due to the COVID-19 pandemic, supply chain increases, and the results of an in-depth design iteration. To compensate for the delayed arrival at Titan, NASA also provided additional funding for a heavy-lift launch vehicle to shorten the mission’s cruise phase.
[END]
---
[1] Url:
https://science.nasa.gov/missions/dragonfly/nasas-dragonfly-rotorcraft-mission-to-saturns-moon-titan-confirmed/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/