(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .



ISS Daily Summary Report – 11/01/2023 – ISS On-Orbit Status Report [1]

[]

Date: 2023-11-01

USOS ExtraVehicular Activity (EVA) #89 RFG Retrieval Part 2: Today, astronauts Jasmin Moghbeli (EV1) and Loral O’Hara (EV2) conducted USOS EVA #89. The main goal of this EVA was to retrieve the S-Band Radio Frequency Group (RFG) and perform a Trundle Bearing Assembly (TBA) Remove and Replace (R&R) on the Port Solar Alpha Rotary Joint (SARJ). The Airlock hatch opened at 7:04 AM CDT, and the crew completed the following tasks:

Planned Tasks:

TBA R&R and Port SARJ Lubrication [Completed]

Remove S-Band RFG and Stanchion and Bring IVA [Deferred]

Remove 2A H-Fixture [Completed]

2A BGA Imagery Survey [Deferred]

Photograph the SASA Stanchion Jacking Bolt [Deferred]

Remove Slack & Twist from CP8 Ethernet Cable [Completed]

Get Ahead Tasks:

Reconfigure Starboard CETA Cart Brake Handle [Completed]

Due to insufficient time, three planned tasks were deferred. However, the crew was able to complete one get ahead task. The final Phase Elapsed Time (PET) from today’s EVA was 6 hours and 43 minutes.

Completed Task List Activities:

None

Today’s Ground Activities:

All activities are complete unless otherwise noted.

EVA ISLE Preparation

EVA Prebreathe Support

EVA HECA Camera Operations

BGA & SARJ Commanding

Crew Dragon Quiescent Checkout [Planned]

Look Ahead Plan

Thursday, November 2 (GMT 306)

Payloads:

Circadian Light Data Measurement

Systems:

SpX-29 Dragon Vehicle Operations OBT

EVA Debrief

EMU Water Recharge

EVA Airlock Deconfiguration

SSRMS LEE HD Survey

Friday, November 3 (GMT 307)

Payloads:

Actiwatch HRF Setup

Frost FOAM Attach

Circadian Light Data

CLINGERS SW Upload

Immunity Assay Kit Gather

ISS Ham Pass

Systems:

SpX-29 Dragon Vehicle Operations OBT

PEPS Inspection

SSRMS IDA2 Survey

SPDM Unstow

MSS PMA2 Survey

HMS OCT2 Exam

Saturday, November 4 (GMT 308)

Payloads:

Thor-Davis Sessions

Systems:

Crew Off Duty

Today’s Planned Activities:

All activities are complete unless otherwise noted.

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2023/11/01/iss-daily-summary-report-11-01-2023/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/