(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .



January 2018 – ISS On-Orbit Status Report [1]

[]

Date: 2023-04

Synchronized Position Hold, Engage, Reorient, Experimental Satellites (SPHERES) SmoothNav: The crew set up the SPHERES work area to activate and check out the hardware and EXPRESS laptop computer (ELC) before conducting the SmoothNav experiment run. SmoothNav develops an estimation algorithm aggregating relative state measurements between multiple, small, and potentially differently instrumented spacecraft. The algorithm obtains the most probable estimate of the relative positions and velocities between all spacecraft using all available sensor information, including past measurements. The algorithm remains portable between different satellite platforms with different onboard sensors, adaptable in the case that one or more satellites become inoperable, and tolerant to delayed measurements or measurements received at different frequencies.

Cell Biology Experiment Facility (CBEF) Configuration Change: The crew changed the configuration of the CBEF and cleaned the inside of the incubator unit to prepare the facility for the Mouse Stress Defense investigation arriving on SpaceX-14. The CBEF is a Japan Aerospace Exploration Agency (JAXA) sub-rack facility located in the Saibo (living cell) Experiment Rack. The CBEF is used in various life science experiments, such as cultivating cells and plants in the Japanese Experiment Module (JEM) and consists of an incubator and control equipment for control and communications.

Tropical Cyclone: The crew configured the camera settings in the Cupola to take untended images of the Category 4 Typhoon Cebile in the Southern Indian Ocean. The Tropical Cyclone investigation captures images of tropical cyclones and hurricanes that are rated at Category 3 or greater on the Saffir-Simpson scale. A pseudo-stereoscopic method is used to determine the altitudes of the cloud tops near the center (eye) of a cyclone by precisely tracking the apparent positions of cloud features with respect to the Earth and how those positions change over time as an observer (the ISS in this case) passes over the storm. The photographic images will be used to demonstrate that pseudo-spectroscopy can be used to measure the cloud altitudes to sufficient precision so that, when combined with other remote-sensing data, an accurate determination of the intensity of hurricane or cyclone can be made.

Internal Thermal Control System (ITCS) Water Sampling: Today the crew sampled fluid from the ITCS for return and analysis on the ground. This is regularly scheduled preventive maintenance to verify health of the ITCS.

Eye exams: The crew completed routine OCT and Fundoscope eye exams today. Eye exams are performed regularly onboard in order to monitor crewmembers eye health. Eyesight is one of the many aspects of the human body that is affected by long-duration stays in a microgravity environment.

Today’s Planned Activities

All activities are complete unless otherwise noted.



Tropical Cyclone Untended Operations

Tropical Cyclone Hardware Closeout

ISS CREW/SSIPC CONFERENCE

OCT Laptop Ethernet Cable Swap

Columbus ITCS water sample using Columbus Coolant Fluid Servicer for Return to Ground

Preparing comm assets for EVA Training

Air Duct Disassembly in DC1 before Training (without removal of В3 fan)

Retrieve ECOM Adapter for RS EVA 44 use.

Orlan MKS No.4 Systems Checkout during pre-EVA Training

Environmental Health System (EHS) Potable Water Dispenser (PWD) Sample Collect

JEM System Laptop Terminal Reboot

COL1D1 FWD cargo restore.

Orlan Interface Unit (БСС) Check in DC1.

SPHERES Crew Conference

Donning Gear

SPHERES Test Session Setup

Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Potable Water Dispenser (PWD) Sample Analysis

Cell Biology Experiment Facility (CBEF) Configuration Change

Comm check and medical parameter check

Orlan Systems и БСС Checkout during pre-EVA training

Entry into Orlan No.4, No.6, and sealing off backpacks

Suited Pre-EVA training – Assistance

Environmental Health System (EHS) Coliform Water Processing

Orlan Suit and Orlan Interface Unit (БСС) Controls Check

Orlan and БСС preliminary leak check

Orlan Fit Check at Suit Pressure = 0.4

JEM Internal Thermal Control System (ITCS) Sample Collection

Cell Biology Experiment Facility (CBEF) Wipe Previous to Mouse breed

Suited Exercise Dry Run in Orlan-MKS No.4 and Orlan-MK No.6.

COL1O3 Hardware Relocate

Exit Orlan

COL1O4 HRF Hardware Relocate

Electrostatic Levitation Furnace(ELF) Fixation Fastener Repair

Reconfig comm assets after EVA Training

Health Maintenance System (HMS) OCT Setup

SPHERES VERTIGO Test Session Run

Post-exercise cleanup, air duct assembly

Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Sample Data Record

Environmental Health System (EHS) Total Organic Carbon Analyzer (TOCA) Waste Water Bag (WWB) Changeout

Health Maintenance System (HMS) OCT Exam

Installation of Orlan-MKS No.4 ORUs for before EVA

Installation of Orlan-MK No.6 ORUs before EVA

БК-3М oxygen tank replacement

Health Maintenance System (HMS) OCT Stow

Installation of GoPro 360 camera No.1 on the H/R inside DC1

ISS HAM Service Module Pass

Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain

Node 3 Moderate Temperature Loop (MTL) Internal Thermal Control System (ITCS) Sample Collection

Regenerative Environmental Control and Life Support System (ECLSS) Recycle Tank Drain Part 2

Health Maintenance System (HMS) Eye Exam – Fundoscope

SPHERES USB Download

Post-Exercise Hygiene Procedure

Health Maintenance System (HMS) Fundoscope Tear Down and Stow

Completed Task List Activities

Station Support Computer (SSC) 5 and 23 Swap

Ground Activities

All activities are complete unless otherwise noted.



Standard commanding.

Three-Day Look Ahead:

Thursday, 02/01: EMU loop scrubs, CIR bottle R&R, eye exams

Friday, 02/02: JPM rack swap, Russian EVA

Saturday, 02/03: Housekeeping, crew off duty

QUICK ISS Status – Environmental Control Group:

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2018/01/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/