March 2017 – ISS On-Orbit Status Report [1]

[]

Date: 2023-03

U.S. Crew Half Duty Day: Following yesterday’s successful EVA, today was a half duty day for the US crew. They executed standard post EVA activities including a Extravehicular Mobility Unit (EMU) water recharge, returning equipment to the Airlock, Metal Oxide (METOX) regeneration, battery maintenance, and a debrief with ground teams.

Habitability Observations: The crew documented and submitted observations per tasks from the last few weeks related to human factors and habitability. The crew selects from various topics including housekeeping activities, trash management, accumulation of dust, items not stowed, frequency of housekeeping, and effectiveness of housekeeping tools. The investigation collects observations about the relationship between crewmembers and their environment on the ISS. Observations can help spacecraft designers understand how much habitable volume is required, and whether a mission’s duration impacts how much space crew members need.

Space Headaches Questionnaire: The crew performed their weekly questionnaire, answering questions utilizing the Data Collection Tool. The European Space Agency (ESA) investigation collects information that may help in the development of methods to alleviate associated symptoms and improvement in the well-being and performance of crewmembers in space. Headaches during space flight can negatively affect mental and physical capacities of crewmembers that can influence performance during a space mission.

Today’s Planned Activities

All activities were completed unless otherwise noted.

KORREKTSIYA. Logging Liquid and Food (Medicine) Intake

Soyuz 732 Descent Drill and Return Equipment List & Stowage Consultation

HMS Periodic Health Status (PHS) Post EVA Examination

Cygnus PROX Switch OFF

Water Recovery System Waste Water Tank Drain Termination

Strata Status Check

ISS Crew departure preparation

LBNP Training (PRELIMINARY)

JEM System Laptop Terminal Reboot

Inspect CWC-I attached to UPA SPA.

Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill

Combustion Integrated Rack Alignment Guide Removal

Sokol Space Suit leak check

Replacement СПП-2 in [АСУ]

Multi-purpose Small Payload Rack (MSPR) /Group Combustion Module (GCM) Component Deactivation

Sokol Suit Dryout, Setup Suits 1 and 2 for Drying

Robotic Workstation (RWS) Teardown

LBNP Training

Extravehicular Activity (EVA) Debrief

On MCC GO MPEG2 Multicast and Unicast Video Streaming Test

PROBIOVIT. Setup of Probiovit Kits No.3, No.4 in ТБУ-В at +4 °С

KORREKTSIYA. Logging Liquid and Food (Medicine) Intake

Hardware prepack for return and disposal on Soyuz 732

Terminate Suits 1, 2 Dryout

Extravehicular Mobility Unit (EMU) Water Recharge

ISS HAM Radio and Video Power Up

Meteor Shutter Open

Start drying the 3rd space suit and setup the 1st pair of gloves for drying

Photo/TV Extravehicular Activity (EVA) Camera Disassembly

Removal of [АСН-К] Navigation Module from Progress 435.Tagup with specialists as necessary

PROBIOVIT. Cryogem-03 Removal

EVA Airlock Restow

Regenerative Environmental Control and Life Support System (RGN) Wastewater Storage Tank Assembly (WSTA) Fill

Finish drying the 1st pair of gloves and start drying the 2nd pair

Metal Oxide (METOX) Regeneration Termination

Habitability Human Factors Directed Observations

Long Duration Sorbent Testbed Status Check.

Actiwatch Spectrum HRF1 Configuration Alternate 1

Terminate drying the second pair of gloves

Pille Dosimeter Readout after US EVA

Pre-pack cargo items for return or disposal on Soyuz 732

Space Headaches – Weekly Questionnaire

Nikon still camera sync with station time

Finish drying the 3rd suit, start drying the 3rd pair of gloves

Completed Task List Items

None

Ground Activities

All activities were completed unless otherwise noted.

Post EVA support

Incorporate EXT R9 patch on all connected PCSs

Three-Day Look Ahead:

Saturday, 04/01: Crew off duty, housekeeping

Sunday, 04/02: Crew off duty

Monday, 04/03: PEPS inspection, Story Time From Space, ER7 locker install

QUICK ISS Status – Environmental Control Group:

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2017/03/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/