June 2019 – ISS On-Orbit Status Report [1]
[]
Date: 2023-03
NRCSD (NanoRacks External Cygnus CubeSat Deployer): The crew reviewed procedures for the upcoming NRCSD-16 installation currently planned for next week. The NanoRacks CubeSat Deployer is a stackable, modular, ground loaded launch case. Each NanoRacks CubeSat Deployer accommodates up to eight launch cases. The NanoRacks CubeSat Deployer meets the growing demand to deploy CubeSat format satellites from the ISS for a variety of customers.
RED-EYE Satellite: The RED-EYE program develops and demonstrates technologies which increase the utility of low-cost microsatellites. RED-EYE is a satellite designed for ISS deployment via the Kaber Micro Satellite Deployer using Special Purpose Dexterous Manipulator (SPDM). Following yesterday’s successful deployment of the RED-EYE satellite, today’s activities included JEM Airlock Slide Table extension and return of the Kaber Deployer into the JEM. Once inside ISS, the Kaber Deployer was removed from the Slide Table and stowed by the crew.
Space Station Remote Manipulator System (SSRMS) Jumper Installation: The crew completed Node 1 SSRMS jumper routing and installation activity. This jumper can be used in a contingency power loss scenario to regain power to the SSRMS and other external loads.
Completed Task List Activities:
Spare tool reconfiguration
ISS Experience SSD checkout
JLP PMM consolidate
Ground Activities:
All activities are complete unless otherwise noted.
Payload ops support
JEMAL slide table ops
SSRMS jumper install support
Look Ahead:
Saturday, 6/29 (GMT 180)
Payloads:
ActiWatch Spectrum swaps (NASA)
VEG-04 chk and Mass Measurements (NASA)
Systems:
Crew off duty; housekeeping
Sunday, 6/30 (GMT 181)
Payloads:
VEG-04 chk and Mass Measurements (NASA)
Food Acceptability (NASA)
Systems:
Crew off duty
Monday, 7/1 (GMT 182)
Payloads:
VEG-04 chk and Mass Measurements and OBT (NASA)
NanoRacks Cubesat Deployer Mission 16 Install (EntrySat, IOD-1 GEMS, KRAKsat, Swiatowid, VVC) (NASA)
GLACIER rack relocate (NASA)
Systems:
WRS hardware gather
WPA MF bed reconfiguration
T2, WRS rack prep
Today’s Planned Activities:
All activities are complete unless otherwise noted.
[END]
---
[1] Url:
https://blogs.nasa.gov/stationreport/2019/06/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/