(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .



ISS Daily Summary Report – 2/02/2023 – ISS On-Orbit Status Report [1]

[]

Date: 2023-02-02

Payloads:

None

Systems:

USOS EVA 85: ISS Roll Out Solar Array (IROSA) Prep 1A Troubleshooting EVA: Today, ISS crewmembers Nicole Mann and Koichi Wakata completed the 85h USOS Extravehicular Activity (EVA). The main goal of this EVA was to troubleshoot interface issues encountered during a previous EVA installation activity that was initiated but not completed. The crew successfully completed the installation of the 1A IROSA Modification Kit on the S4 truss. Nicole and Koichi then performed tasks to prepare for the 1A/1B IROSA installation EVAs this summer.

During the 6-hour and 41-minute EVA, the EV crew completed the following objectives:

Complete Installation of the 1A Mod Kit [Complete] Troubleshoot M21 bolt on Left Lower Strut [Complete] Troubleshoot Left Mid Strut [Complete] Drive Collar bolts, Install MLI, and route 1A IROSA Cables [Complete]

Retrieve APFR from P6 [Complete]

Route 1B IROSA cables [Partially Complete]

APFR Shuffle [Partially Complete]

Environmental Health System (EHS) Coliform Water Sample Analysis: The crew completed post-processing analysis of the coliform detection bags. The water samples were acquired on Tuesday and allowed to incubate to check for the presence of Coliform bacteria. Following the incubation period, the crew visually analyzed the coliform detection bags and recorded the results. Visual confirmation must be performed within 40-48 hours of the initial sample collection.

Completed Task List Activities:

None

Today’s Ground Activities:

All activities are complete unless otherwise noted.

JAL 10.2 PSIA Operations

Configure N3 Shell Heaters to nominal configuration post necessary EVA Powerdown

MSS Camera Support

VDS WETA Scan

SDMS Activation

BGA Unlatch Commands Configure to 2-Step / 1-Step

MSS Maneuver

Dragon Propulsion Valve EVA Open

TRC 2 BIT Test

Look Ahead Plan

Friday, February 3 (GMT 034)

Payloads:

ADSEP Cassette Removal

BioFabrication Cassette Removal and Glovebag Install

Astrobee Stowage Clear and Prep

Food Physiology Diet Brief

HRF Veg POMS Questionnaire

MSG Facility Audit

Particle Vibration Setup

Standard Measures Cognition Test

Veg-05 Check and Root Mat fill

Z-T2 Ops

Systems:

EVA Airlock Deconfig

EVA GoPro Downlink

EMU Water Recharge

EVA Camera Disassembly

EVA Debrief Conference

Saturday, February 4 (GMT 035)

Payloads:

Astrobee Stowage Replace and Off

Systems:

Regenerative ECLSS Recycle Tank Drain

Sunday, February 5 (GMT 036)

Payloads:

Veg-05 Check

Systems:

Crew Off-Duty

Today’s Planned Activities:

All activities are complete unless otherwise noted.

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2023/02/02/iss-daily-summary-report-2-02-2023/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/