(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .
ISS Daily Summary Report – 2/01/2023 – ISS On-Orbit Status Report [1]
[]
Date: 2023-02-01
Payloads:
Fluid Dynamics in Space (FLUIDICS): The crew disconnected and stowed the Fluidics HDD and its cable from the CMAU Z-book laptop. The measurement of liquid displacement within a sphere in microgravity relates to a given kinematic representation of a spacecraft’s fuel tank. The FLUIDICS investigation evaluates the Center of Mass (CoM) position regarding a temperature gradient on a representation of a fuel tank. The observation of capillary wave turbulence on the surface of a fluid layer in a low-gravity environment can provide insights into measuring the existing volume in a sphere.
Sphere Camera-1 (SphereCam-1) : Sphere Cam1 hardware was set up to record video LAB Translation Filming Shot #7. SphereCam-1 uses a commercial off-the-shelf ultra-high resolution digital movie camera with a wide angle lens to collect footage in microgravity and evaluate technical performance of the camera. Investigators plan to use results to design and develop subsequent cameras for testing and, ultimately, provide a product that could support groundbreaking imaging of space with greater resolution, detail, and sharpness than anything currently available commercially.
TangoLab: TangoLab-3 and TangoLab-4 facilities were relocated to ExPRESS Rack 9B (COL1F2). Both facilities were powered up and photos were taken. Space Tango’s TangoLab lockers are reconfigurable general research facilities designed for microgravity research and development (R&D) and pilot manufacturing aboard the ISS.
Veg-05: The plants growing in the two Veggie facilities were inspected, watered if necessary, and photographed. The Pick-and-Eat Salad-Crop Productivity, Nutritional Value, and Acceptability to Supplement the ISS Food System (Veg-05) investigation is the next step in efforts to address the need for a continuous fresh-food production system in space.
Systems:
Extravehicular Activity (EVA) Preparation Activities: The crew continued preparation for the ISS Roll Out Solar Array (IROSA) Prep 1A Troubleshooting EVA later this week. The EVA Mobility Units (EMUs) and Equipment Lock were configured, the EVA Tools were configured and audited inside the Airlock, and the Pistol Grip Tool (PGT) batteries were installed. The EVA D5 and GoPro cameras and the EVA iPad were configured, and the crew reviewed the detailed EVA procedures and participated in a procedure review conference.
Completed Task List Activities:
None
Today’s Ground Activities:
All activities are complete unless otherwise noted.
[Deferred] MCC-M Transition to Reboost Mode
MCC-M Transition to Reboost Mode [Aborted] ACS MCS Configuration for Reboost
ACS MCS Configuration for Reboost Crew Dragon System Checkout
Dragon Propulsion Valve EVA Close
Look Ahead Plan
Thursday, February 2 (GMT 033)
Payloads:
BFF Cassette Swap
None
Systems:
IROSA Prep 1A Troubleshooting EVA
Friday, February 3 (GMT 034)
Payloads:
ADSEP Cassette Removal
BioFabrication Cassette Removal and Glovebag Install
Astrobee Stowage Clear and Prep
ELF Holder Hardware Gather
Food Physiology Diet Brief
HRF Veg POMS Questionnaire
MSG Facility Audit
Particle Vibration Setup
Standard Measures Cognition Test
Veg-05 Check and Root Mat fill
Z-T2 Ops
Systems:
EVA Airlock Deconfig
EVA GoPro Downlink
EMU Water Recharge
EVA Camera Disassembly
EVA Debrief Conference
Saturday, February 4 (GMT 035)
Payloads:
Astrobee Stowage Replace and Off
Systems:
Regenerative ECLSS Recycle Tank Drain
Today’s Planned Activities:
All activities are complete unless otherwise noted.
[END]
---
[1] Url:
https://blogs.nasa.gov/stationreport/2023/02/01/iss-daily-summary-report-2-01-2023/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/