ISS Daily Summary Report – 1/24/2023 – ISS On-Orbit Status Report [1]

[]

Date: 2023-01-24

Payloads:

PK-4: A crewmember caught clouds of particles inside the PK-4 chamber using the PK-4 software on the Columbus Module Laptop 1 as part of campaign 15 experiment operations. PK-4 is a scientific collaboration between ESA and the Russian Federal Space Agency (Roscosmos), performing research in the field of Complex Plasmas: low temperature gaseous mixtures composed of ionized gas, neutral gas, and micron-sized particles. The micro-particles become highly charged in the plasma and interact strongly with each other, which can lead to a self-organized structure of the micro-particles: so-called plasma crystals. Experiments in the facility aim to study transport properties, thermodynamics, kinetics and statistical physics, and non-linear waves and instabilities in the plasmas.

Veg-05: The plants growing in the two Veggie facilities were inspected, watered, and photographed. The Pick-and-Eat Salad-Crop Productivity, Nutritional Value, and Acceptability to Supplement the ISS Food System (Veg-05) investigation is the next step in efforts to address the need for a continuous fresh-food production system in space.

Systems:

Waste and Hygiene Compartment (WHC) Manual Fill Initiation and Termination: Today, the crew initiated a manual fill of the WHC EДВ-СВ (Water Container) using a Post-Flight Analysis Bag to capture any pressure relief to protect the dose pump. The ЕДВ-CB is intended for short-term storage and manual water transportation between facilities. After successfully filling the EДВ-СВ, the crew returned the WHC to nominal use.

Completed Task List Activities:

N/A

Today’s Ground Activities:

All activities are complete unless otherwise noted.

STGT Circuit Breaker Replacement [Active]

PRO FIR Activation Commanding

Laptop Preparation for OCT2 Exam

MSS Hover Maneuver [Active]

PRO LSG Facility Activation/Deactivation Commanding

Look Ahead Plan

Wednesday, January 25 (GMT 025)

Payloads:

Plant Hab-03A Review

Plasma Kristall-4

Systems:

Acoustic Monitor Data Transfer

Thursday, January 26 (GMT 026)

Payloads:

BioNutrient-1 Hydration and Agitate

HRF GDS Tank Gauge Photo

JWRS Pump Check and Bag Connect

PFMI Hardware Stow

PK-4 HD Swap and Experiment Run

Plant Hab-03A Harvest

Veg-05 Plant Pillow Replacement and Water Check

Systems:

IFM WHC Pre-Treat Tank R&R

Columbus Bay 4 Restore

HMS OOHA with Kuduwave Software Setup and Test

IFM UTS Card R&R

HMS WinSCAT Test

Friday, January 27 (GMT 027)

Payloads:

MSPR Cable Cover

Myotones Measurements

SODI/Particle Vibration Setup

Veg-05 Check

Systems:

ECLSS UPA Brine Filter Changeout

EVA Procedure Review

EVA Tool Config

EVA Procedure Conference

EVA SAFER GN2 Check

ECLSS Recycle Tank Drain

Today’s Planned Activities:

All activities are complete unless otherwise noted.

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2023/01/24/iss-daily-summary-report-1-24-2023/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/