(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .
ISS Daily Summary Report – 1/24/2023 – ISS On-Orbit Status Report [1]
[]
Date: 2023-01-24
Payloads:
PK-4: A crewmember caught clouds of particles inside the PK-4 chamber using the PK-4 software on the Columbus Module Laptop 1 as part of campaign 15 experiment operations. PK-4 is a scientific collaboration between ESA and the Russian Federal Space Agency (Roscosmos), performing research in the field of Complex Plasmas: low temperature gaseous mixtures composed of ionized gas, neutral gas, and micron-sized particles. The micro-particles become highly charged in the plasma and interact strongly with each other, which can lead to a self-organized structure of the micro-particles: so-called plasma crystals. Experiments in the facility aim to study transport properties, thermodynamics, kinetics and statistical physics, and non-linear waves and instabilities in the plasmas.
Veg-05: The plants growing in the two Veggie facilities were inspected, watered, and photographed. The Pick-and-Eat Salad-Crop Productivity, Nutritional Value, and Acceptability to Supplement the ISS Food System (Veg-05) investigation is the next step in efforts to address the need for a continuous fresh-food production system in space.
Systems:
Waste and Hygiene Compartment (WHC) Manual Fill Initiation and Termination: Today, the crew initiated a manual fill of the WHC EДВ-СВ (Water Container) using a Post-Flight Analysis Bag to capture any pressure relief to protect the dose pump. The ЕДВ-CB is intended for short-term storage and manual water transportation between facilities. After successfully filling the EДВ-СВ, the crew returned the WHC to nominal use.
Completed Task List Activities:
N/A
Today’s Ground Activities:
All activities are complete unless otherwise noted.
STGT Circuit Breaker Replacement [Active]
PRO FIR Activation Commanding
Laptop Preparation for OCT2 Exam
MSS Hover Maneuver [Active]
PRO LSG Facility Activation/Deactivation Commanding
Look Ahead Plan
Wednesday, January 25 (GMT 025)
Payloads:
Plant Hab-03A Review
Plasma Kristall-4
Systems:
Acoustic Monitor Data Transfer
Thursday, January 26 (GMT 026)
Payloads:
BioNutrient-1 Hydration and Agitate
HRF GDS Tank Gauge Photo
JWRS Pump Check and Bag Connect
PFMI Hardware Stow
PK-4 HD Swap and Experiment Run
Plant Hab-03A Harvest
Veg-05 Plant Pillow Replacement and Water Check
Systems:
IFM WHC Pre-Treat Tank R&R
Columbus Bay 4 Restore
HMS OOHA with Kuduwave Software Setup and Test
IFM UTS Card R&R
HMS WinSCAT Test
Friday, January 27 (GMT 027)
Payloads:
MSPR Cable Cover
Myotones Measurements
SODI/Particle Vibration Setup
Veg-05 Check
Systems:
ECLSS UPA Brine Filter Changeout
EVA Procedure Review
EVA Tool Config
EVA Procedure Conference
EVA SAFER GN2 Check
ECLSS Recycle Tank Drain
Today’s Planned Activities:
All activities are complete unless otherwise noted.
[END]
---
[1] Url:
https://blogs.nasa.gov/stationreport/2023/01/24/iss-daily-summary-report-1-24-2023/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/