(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .
ISS Daily Summary Report – 12/05/2022 – ISS On-Orbit Status Report [1]
[]
Date: 2022-12-05
USOS 3A ISS Roll Out Solar Array (IROSA) Install Extravehicular Activity (EVA): This past weekend on Saturday EV1 (Josh Cassada) and EV2 (Frank Rubio) conducted USOS EVA #82. The main goal of this EVA was to install and deploy the 3A IROSA and perform a 1B cable demate. Hatch opening occurred at 6:16 AM CT. The final Phase Elapsed Time (PET) from today’s EVA was 7 hours and 5 minutes and the crew completed the following objectives:
Release IROSA from FSE
Install IROSA on S4 3A Mast Canister
Connect IROSA Electrical Connectors
Deploy S4 3A IROSA
1B Cable Demate
Release FSE Restraint Bolts on 4A IROSA (Get-Ahead)
Payloads:
Kubik 5 and 6 Deinstall: Following the completion of the Osteogenic Cells experiment, the crew deinstalled Kubik 5 from COL1D1 and Kubik 6 from COL1D2, and stowed them. Exposure of the human body to microgravity conditions during long-duration spaceflight results in the loss of bone mass, especially in weight-bearing bones, with conditions resembling that of disuse osteoporosis. The general understanding of the underlying processes state that bone formation is decreased, whereas bone resorption remains unaltered, or is slightly increased. The main goal of the Osteogenic Cells investigation is to study whether the gravity response is restricted to a particular osteogenic cell type, and whether the composition of Extra-Cellular Matrix (ECM) affects, or even rescues, the gravity-response in the formation of bone cells (osteoblasts).
Systems:
Post EVA Activities: Today, the crew terminated charging on Li-Ion Batteries using EVA battery operations terminal. This is done in preparation for the upcoming 4A IROSA EVA. The crew also terminated the first cycle of Extravehicular Mobility Unit (EMU) Metal Oxide (METOX) regeneration. Following this, a second METOX regeneration cycle was initiated by baking out CO2 in the METOX regenerator oven.
Completed Task List Activities:
JAXA Space Food Video Taking
Today’s Ground Activities:
All activities are complete unless otherwise noted.
OCA Uplink Bandwidth Reduced
ASIM Daily File Uplink and Transfer
SMLA-R System Message Router Reboot
PRO NICER Heater Commanding
SPDM RMCT Checkout
SAGE Data Downlink
Look Ahead Plan
Tuesday, December 6 (GMT 340)
Payloads:
BRIC-26 Cannister Actuation and Transfer
CIR Hardware Gather
COSMIC Cover Setup
FIR/FBCE/FBM n-PFH Fill
HRF Rack Handle Replace
Lumina Reboot And Data Transfer
PAUL Cube Replacement TL Mission-30
Plant Habitat Hardware Retrieve
PLT4 and PLT5 Relocate
RFID Tag Install
RR-25 Hab Restock and Access Unit Clean
STaARS BioScience-15 Sample Transfer
Systems:
EMU Cooling Loop Maintenance
Food Transfer
EDV Drain to RST using UTS
HMS IMAK Unpack
Wednesday, December 7 (GMT 341)
Payloads:
BCM Robot Test
BRIC-26 Cannister Retrieval And Insertion into CS
CIR/SoFIE Solenoid Valve Replacement
HRF Urine and Blood Setup
NanoRacks Mainframe A Module Install
Particle Vibration Mix
SIS Biolab EC Deinstall and Biolab Reference EC install
Systems:
ECLSS PEPS Inspection
EVA EMU FPS R&R Tool Gather and Study
SpX Crew Dragon Emergency Departure Review
VTE Scan
Thursday, December 8 (GMT 342)
Payloads:
CIR Hardware Return
FSL SMD SCU Exchange
HRF Blood and Urine Collect
HRF/CIPHER/Falcon Goggle Checkout
ISS HAM Pass
JWRS Component Installation
MSG Activation
NanoRacks Deployer Disassembly
Systems:
EVA EMU Radio and FPS R&R
Transfer Crew Dragon Cargo Operations
Today’s Planned Activities:
All activities are complete unless otherwise noted.
[END]
---
[1] Url:
https://blogs.nasa.gov/stationreport/2022/12/05/iss-daily-summary-report-12-05-2022/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/