ISS Daily Summary Report – 12/05/2022 – ISS On-Orbit Status Report [1]

[]

Date: 2022-12-05

USOS 3A ISS Roll Out Solar Array (IROSA) Install Extravehicular Activity (EVA): This past weekend on Saturday EV1 (Josh Cassada) and EV2 (Frank Rubio) conducted USOS EVA #82. The main goal of this EVA was to install and deploy the 3A IROSA and perform a 1B cable demate. Hatch opening occurred at 6:16 AM CT. The final Phase Elapsed Time (PET) from today’s EVA was 7 hours and 5 minutes and the crew completed the following objectives:

Release IROSA from FSE

Install IROSA on S4 3A Mast Canister

Connect IROSA Electrical Connectors

Deploy S4 3A IROSA

1B Cable Demate

Release FSE Restraint Bolts on 4A IROSA (Get-Ahead)

Payloads:

Kubik 5 and 6 Deinstall: Following the completion of the Osteogenic Cells experiment, the crew deinstalled Kubik 5 from COL1D1 and Kubik 6 from COL1D2, and stowed them. Exposure of the human body to microgravity conditions during long-duration spaceflight results in the loss of bone mass, especially in weight-bearing bones, with conditions resembling that of disuse osteoporosis. The general understanding of the underlying processes state that bone formation is decreased, whereas bone resorption remains unaltered, or is slightly increased. The main goal of the Osteogenic Cells investigation is to study whether the gravity response is restricted to a particular osteogenic cell type, and whether the composition of Extra-Cellular Matrix (ECM) affects, or even rescues, the gravity-response in the formation of bone cells (osteoblasts).

Systems:

Post EVA Activities: Today, the crew terminated charging on Li-Ion Batteries using EVA battery operations terminal. This is done in preparation for the upcoming 4A IROSA EVA. The crew also terminated the first cycle of Extravehicular Mobility Unit (EMU) Metal Oxide (METOX) regeneration. Following this, a second METOX regeneration cycle was initiated by baking out CO2 in the METOX regenerator oven.

Completed Task List Activities:

JAXA Space Food Video Taking

Today’s Ground Activities:

All activities are complete unless otherwise noted.

OCA Uplink Bandwidth Reduced

ASIM Daily File Uplink and Transfer

SMLA-R System Message Router Reboot

PRO NICER Heater Commanding

SPDM RMCT Checkout

SAGE Data Downlink

Look Ahead Plan

Tuesday, December 6 (GMT 340)

Payloads:

BRIC-26 Cannister Actuation and Transfer

CIR Hardware Gather

COSMIC Cover Setup

FIR/FBCE/FBM n-PFH Fill

HRF Rack Handle Replace

Lumina Reboot And Data Transfer

PAUL Cube Replacement TL Mission-30

Plant Habitat Hardware Retrieve

PLT4 and PLT5 Relocate

RFID Tag Install

RR-25 Hab Restock and Access Unit Clean

STaARS BioScience-15 Sample Transfer

Systems:

EMU Cooling Loop Maintenance

Food Transfer

EDV Drain to RST using UTS

HMS IMAK Unpack

Wednesday, December 7 (GMT 341)

Payloads:

BCM Robot Test

BRIC-26 Cannister Retrieval And Insertion into CS

CIR/SoFIE Solenoid Valve Replacement

HRF Urine and Blood Setup

NanoRacks Mainframe A Module Install

Particle Vibration Mix

SIS Biolab EC Deinstall and Biolab Reference EC install

Systems:

ECLSS PEPS Inspection

EVA EMU FPS R&R Tool Gather and Study

SpX Crew Dragon Emergency Departure Review

VTE Scan

Thursday, December 8 (GMT 342)

Payloads:

CIR Hardware Return

FSL SMD SCU Exchange

HRF Blood and Urine Collect

HRF/CIPHER/Falcon Goggle Checkout

ISS HAM Pass

JWRS Component Installation

MSG Activation

NanoRacks Deployer Disassembly

Systems:

EVA EMU Radio and FPS R&R

Transfer Crew Dragon Cargo Operations

Today’s Planned Activities:

All activities are complete unless otherwise noted.

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2022/12/05/iss-daily-summary-report-12-05-2022/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/