April 2015 – ISS On-Orbit Status Report [1]

[]

Date: 2022-11

Robotic Refueling Mission-2 (RRM-2): Virts worked with ground teams to configure the Japanese Experiment Module Airlock (JEMAL) and extend the JEMAL slide table to position the RRM for transfer. The Space Station Remote Manipulator System (SSRMS) operators on the ground are currently using the Special Purpose Dexterous Manipulator (SPDM) to remove task board (TB)3 from the RRM On-Orbit Transfer Cage (ROTC) followed by a Mobile Transporter (MT) translation from Work Site (WS)7 to WS2 for TB3 installation. This is day 1 of at least 6 days of ground operations to transfer RRM-2.

Rodent Research-2 Center for the Advancement of Science in Space (RR-2 CASIS): Kelly set up equipment and the Microgravity Science Glovebox (MSG) for fixative swap operations. He retrieved the test subject samples prepared 24 hours ago, removed the preserving fixative and replaced with fresh fixative. The primary objective of this research is to monitor the effects of the space environment on the musculoskeletal and neurological systems of mice as model organisms of human health and disease. Living in microgravity results in significant and rapid effects on the physiology of mice that mimic the process of aging and some diseases in humans on Earth, including muscle atrophy and the loss of bone mineral density. This project will help scientists to discover new molecular targets that can facilitate the development of novel therapeutics for the treatment of muscle and bone-related diseases. Long-duration exposure to microgravity will also induce changes in gene expression, protein synthesis, metabolism, and eye structure/morphology that will be identifiable as a series of assessable biomarkers for tracking the onset and progression of disease.

Defining the Relation Between Biomarkers of Oxidative and Inflammatory Stress and Atherosclerosis Risk in Astronauts During and After Long-duration Spaceflight (Cardio Ox): Cristoforetti, with Virts as the Crew Medical Officer (CMO) and remote guidance from the ground, performed the return minus 14 day (R-14) ultrasound scans for Cardio Ox followed by blood pressure measurements and logging results. The objective of Cardio Ox is to determine whether biological markers of oxidative and inflammatory stress are elevated during and after space flight and whether this results in an increased, long-term risk of atherosclerosis in astronauts. Crew members provide blood and urine samples to assess biomarkers before launch, three sessions while in space, and again post-flight. Ultrasound scans of the carotid and brachial arteries will be obtained at the same time points, as well as through 5 years after landing as an indicator of cardiovascular health

Solution Crystallization Observation Facility (SCOF): Cristoforetti performed the third and final on board cable reconfiguration on the SCOF to support ground checkouts. This is in preparation for the Soret Facet cell2 experiment planned for May 12. The Soret effect in fluids is a thermodynamic phenomenon in which different particles respond in different ways to varying temperatures. The effect, studied by the Swiss chemist Charles Soret, has been difficult to examine in detail on Earth because of gravity. The Study on Soret effect (thermal diffusion process) for the mixed solution by the in-situ observation technique facilitated at SCOF (Soret-Facet) is the first investigation to verify Soret conditions in steady and changing conditions, and to compare the Soret effect in microgravity with results on the ground, an important measurement for calibrating future investigations.

European Physiological Module (EPM): Cristoforetti performed a software update of EPM laptop by reloading software using a ghost image and EPM Universal Serial Bus (USB) stick.

Space Aging: Cristoforetti retrieved the Space Aging sample #1 from the Cell Biology Experiment Facility (CBEF), placed it in a sample return bag and stowed in the Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI). Space Aging is an investigation to study of the effects of space flight on the aging of the C. elegans roundworm, a model organism for a range of biological studies. Microgravity causes a number of physiological changes, like heart and bone deconditioning, involving mechanisms that are poorly understood and may affect the rate at which organisms and astronauts age. Space Aging will grow millimeter-long C. elegans roundworms in microgravity and compare their health and longevity with control specimens kept on Earth.

Nanoracks Module 24: Kelly answered questions regarding the NanoRacks module install that was performed on April 18. The ground is currently unable to “see” Module-24 or the USB drive that was installed. These answers will help troubleshooting efforts and assist in the development of future ops products.

Body Measures: Kelly, acting as an operator, assisted Virts in setting up equipment to collect his third and final calibration and body pose photographs and the circumference measurements in support of the Body Measures experiment. Currently, NASA does not have sufficient in-flight anthropometric data (body measurements) gathered to assess the impact of physical body shape and size changes on suit sizing. This study will involve collecting anthropometric data (body measurements) using digital still and video imagery and a tape measure to measure segmental length, height, depth, and circumference data for all body segments (i.e., chest, waist, hip, arms, legs, etc.) from astronauts for pre-, post-, and in-flight conditions.

S-Band String 1: Yesterday evening following a Loss of Signal (LOS), Ku-Band and S-Band did not lock up on Tracking and Data Relay Satellite (TDRS) 171. Ku-Band was reacquired on the following pass on TDRS 41 but the S-Band outage persisted. Ground controllers were able to regain ISS telemetry. Ku-Band Contingency Command and Telemetry (CCT) mode was enabled over a Russian Ground Pass to allow ground controllers to use Ku-Band commanding to swap S-Band from String 1 to String 2. Once configured on String 2, good command link and telemetry link were established. Initial review of data from troubleshooting shows the Baseband Signal Processor (BSP)-1 is performing nominally and S-Band String 1 has been configured as a hot backup. The team is continuing to investigate.

Waste and Hygiene Compartment (WHC) Flush Water Pressure Relief T-Hose Installation: Virts installed a pressure relief hose on Dose Pump PY-3 and routed it through panel WHC-03 with the Urine Receptacle Hose. This configuration eliminates the need to remove WHC panels during Flush Tank Fills and replaces the pressure relief EDV with a smaller Post-Flight Analysis Bag as the depressurization “burp bag”. This activity coincides with a needed Flush Tank Fill that also serves as a leak check. Future fills take advantage of this simpler configuration which saves crew time.

False Fire Indication in Treadmill 2 (T2) Rack: Yesterday a smoke alarm annunciated in the T2 rack. At the time of the alarm, the crew was exercising on T2 and reported that the tread belt stopped moving immediately prior to the alarm. T2 was powered down and the crew was no-go for exercise. This morning Kelly performed troubleshooting and downloaded data for review. Engineering teams completed the review and observed no issues. Dust is the likely cause of the smoke alarm. T2 was powered on and the crew is go for exercise.

SpaceX (SpX)-6 Cargo Transfer Operations: The crew continued transferring cargo from the Dragon vehicle. As of last night’s crew report we are approximately 60% complete with SpX-6 cargo operations. No Dragon cargo operations were performed today.

Today’s Planned Activities

All activities were completed unless otherwise noted.



HRF Urine Sample Collection

HRF – Sample MELFI Insertion

USND2 – Hardware Activation

ISS crew and ГОГУ weekly conference

CARDOX – Preparation Steps and Hardware Setup

SCOF – Cable Reconfiguration

System Laptop Terminal (SLT) Reboot

TOCA – Buffer Container (BC) Changeout

Verification of ИП-1 Flow Sensor Position

CARDOX – Experiment Ops

CARDOX – Scanning (operator)

Equipment search for condensate and water sampling

CARDOX – Blood Pressure Operations

CARDOX – Blood Pressure Operations

BODYM – Equipment Setup

UDOD. Experiment ops using DYKNANIYE-1 and SPRUT-2 sets.

BODYM – Experiment Measurements Ops

HRF Urine Sample Collection

UDOD. Photography of the Experiment Ops

HRF – Sample MELFI Insertion

Water Transfer and Bladder Compression of Progress 425 (AO) Rodnik БВ1 tank

USND2 – Hardware Deactivation

BODYM – Experiment Measurements Ops

ESA Weekly Crew Conference

EPM Laptop Software Update – Part 1

Hardware prepack for return and disposal on ТК 715

Life On The Station Photo and Video

EPM Laptop Software Update – Part 2

IMS and Stowage Conference

WRS Maintenance

Rodent Research (RR) – Fixative Swap

HMS Defibrillator Inspection

S P AGING – Sample Retrieval

Crew Onboard Support Kit (КСПЭ) Equipment Audit

SM Ventilation System Preventive Maintenance. Group А

Hardware prepack for return and disposal on ТК 715

SP AGING – Sample Insertion into MELFI

WRS Maintenance

EML – Gas Valves Closing

WRS – Recycle Tank Fill

HRF Urine Sample Collection

JEM Airlock – Outer Hatch Opening

СОЖ Maintenance

Slide Table Extension to JEF Side

RR-MELFI. Sample Relocation between Different MELFI Sections

HRF – Sample MELFI Insertion

HRF – Hardware Setup

MSG – Powerdown

Crew prep for departure

In Flight Maintenance (IFM) – Waste and Hygiene Compartment (WHC) – Full Fill

Crew Departure Prep

Crew Onboard Support Kit (КСПЭ) Equipment Audit

IMS Delta File Prep

Fundoscope – Preparation

Progress 425 Rodnik БВ1 Water Tank 1 Bladder Compression – Closeout Ops

HRF Urine Sample Collection

PRODUTSENT. Removal of ТБУ-В No.02 Thermostat

Fundoscope Prep

HRF – Sample MELFI Insertion

Fundoscope – Examination

Flight Director / ISS Crew Tagup

Fundoscope – Stowage

Crew conference with Astronaut Office

Completed Task List Items

None

Ground Activities

All activities were completed unless otherwise noted.



CardioOx/Ultrasound ops

Body Measures ops

Rapidscat commanding

RRM-2 Transfer [In Work]

Three-Day Look Ahead:

Friday, 05/01: USOS crew half day off, DRAGON Cargo Transfer, SSRMS RRM transfer

Saturday, 05/02: Crew off duty, housekeeping, TripleLux A closeout, Space Aging, SSRMS RRM transfer

Sunday, 05/03: Crew off duty, SSRMS RRM transfer

QUICK ISS Status – Environmental Control Group:

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2015/04/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/