Synchronized Position Hold, Engage, Reorient, Experimental Satellites – Universal Docking Port (SPHERES-UDP): Kelly reviewed the SPHERES-UDP procedure and test plan and then participated in a conference with the Payload Developer to discuss science operations. He then performed a SPHERES-UDP test run and downloaded data to a Station Support Computer (SSC). The addition of docking ports to SPHERES provides a testbed for the investigation of solutions to the challenges of combining autonomous spacecraft. Mated spacecraft can be used to assemble complex systems in orbit or combine sensors and actuators for satellite servicing and repurposing missions. SPHERES-UDP enables testing of complex tasks through optimal and adaptive control, autonomous decision-making processes, and real-time image processing.

Node 1 Nadir Berthing Port Preparation: As part of USOS Reconfiguration, Lindgren and Yui routed two power cables from the forward end cone to bay 3 in the Lab Overhead Starboard Standoff. These cables connected to the set of cables installed yesterday. Today’s cable routing required every other overhead rack (LAB1O1, LAB1O3, and LAB1O5) to be rotated in the Lab. One crew member retrieved the cable ends behind the un-rotated racks as the other crew member fed the cables through. Additional cabling routing activities within Node 1 and Node 2 are scheduled for next week. These cables will eventually provide power from Node 2 to the Node 1 Nadir Berthing Port and the Node 1 Galley Rack.

Ultrasonic Background Noise Test (UBNT) Battery Change: While the 3 US Lab racks were rotated for the cable routing, Yui and Lindgren replaced the battery packs in the UBNT units which are located behind the racks. These battery change outs will allow the UBNT units to provide acoustic measurements for the area where they are located.

Mobile Servicing System (MSS) Operations: Yesterday afternoon, Robotics Ground Controllers successfully translated the Mobile Transporter from Worksite 5 to Worksite 2. This evening, they will maneuver the Space Station Remote Manipulator System (SSRMS) to retrieve the Special Purpose Dexterous Manipulator (SPDM) then perform an Alpha Magnetic Spectrometer (AMS) imagery survey. Following the survey, they will position the MSS to support upcoming Robotics Refueling Mission (RRM) Operations starting Friday, October 2nd.



Today’s Planned Activities

All activities are on schedule unless otherwise noted.

MORZE. Measuring Bioimpedance Using SPRUT-2

Ultrasound 2 – Hardware Activation

MORZE. NEIROIMMUNITET. CORRECTSIA. Blood Sample 1

CORRECTSIA. MORZE. Processing venous blood sample using Plasma-03 centrifuge

NEIROIMMUNITET. Venous blood sample processing

NEIROIMMUNITET. Processing venous blood sample using Plasma-03 centrifuge

MORZE. NEIROIMMUNITET. CORRECTSIA. Handover to USOS for MELFI Insertion

Reminder – ARED Photo/TV

Ultrasound2 – Scan Prep

RUEXP – Blood Sample Insertion into MELFI

CORRECTSIA. Closeout Ops

Ultrasound 2 – Scan

JEM Terminal Computer Reboot

SPHERES – Data Export

CARDIOVECTOR. Experiment Ops

LAB1O31 Cable Routing

SPHERES – Review

Ultrasound 2 Data Export

LAB1O1 Cable Routing

Ultrasound 2 – Scan

MORZE. Psycho-physiological Evaluation: Tsentrovka, SENSOR Tests

SM PCE antenna feeder test using FSH3 spectrum analyzer

Ultrasound 2 – Hardware deactivation

MORZE. Psycho-physiological Evaluation: SUPOS Test

ARIS Removal – Assistance

MORZE. Psycho-physiological Evaluation: Strelau Test

LAB Power Cable Routing

PILOT-T. Preparation for the experiment

LAB1O5 Cable Routing

MAGVEC – USB Transfer

Checking Photo/TV Camcorder Setup

SPHERES Crew Conference

PILOT-T. Experiment Ops

Stop LAB1O3 Rack Rotation

Post-Exercise Hygiene Procedure

LAB Power Cable Routing

SPHERES – Cameras Setup

Stop LAB Rack Rotation

RELAKSATSIYA. Initiate camcorder battery charge

Stop LAB Rack Rotation

LAB Cables Closeout Ops

UBNT – Battery Replacement

WRS – Recycle Tank Fill

JRNL – Journal Entry (not statused)

СОЖ maintenance

LAB1O3 Cable Routing

SPHERES – Running Tests

Verification of ИП-1 Flow Sensor Position

NEIROIMMUNITET. Hair Sample

RELAKSATSIYA. Mounting hardware on CQ window No.1

LAB Racks Replacement

PILOT-T. Experiment Ops

Preparation of Reports for Roscosmos TV Studio

Checking Photo/TV Camcorder Setup

SPHERES – Data Export

PILOT-T. Closeout Ops. Tagup with specialists

IMS Delta File Prep

FMK Deployment Ops (Deferred)

RELAKSATSIYA. Parameter Settings. Tagup with specialists

Grab Sample Container (GSC) Sampling Operations (Deferred)

CONTENT. Experiment Ops

RELAKSATSIYA

NEIROIMMUNITET. Stress Test

NEIROIMMUNITET. Saliva Test

Completed Task List Items

PMM Rackfront Cleaning

Safety Video Followup (In Work)

Ground Activities

All activities are on schedule unless otherwise noted.

MSS Operations

o SPDM Unstow

o AMS Survey

o Config for RRM Ops

Three-Day Look Ahead:

Thursday, 10/01: 61P Launch and Dock, Cubesat Deployer install on MPEP, SPRINT VO2, NPV O-Ring Install, Col PWS R&R

Friday, 10/02: JEMAL Depress, MELFI 2 Troubleshooting, MF Bed, IX Bed, EFA & MCA R&Rs, Cap. Beverage, WRS Waste Water Filter replace, RRM Phase 2

Saturday, 10/03: Weekly Cleaning, Crew Off Duty

QUICK ISS Status – Environmental Control Group:

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2015/09/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/