(C) NASA
This story was originally published by NASA and is unaltered.
. . . . . . . . . .



ISS Daily Summary Report – 8/23/2022 – ISS On-Orbit Status Report [1]

[]

Date: 2022-08-23

Payloads:

AstroPi: The crew reviewed the big picture words for the AstroPi photography checkout activity. In this checkout, the ground teams will assess the night-time photography capabilities of the AstroPi system. Two augmented Raspberry Pi computers (called AstroPis) were flown to the ISS and are both equipped with the mighty Sense Hardware Attached on Top (HAT) that measures the environment inside the ISS, detects how the station moves through space, and picks up the Earth’s magnetic field. Each AstroPi is also equipped with different types of cameras: one has an infrared (IR) camera, and the other has a standard visible spectrum camera.

Standard Measures: Pre-sleep questionnaires were filled out in support of the Standard Measures investigation. Spaceflight Standard Measures (Standard Measures) collects a set of core measurements related to many human spaceflight risks from astronauts before, during, and after long-duration missions. The aim is to ensure consistent capture of an optimized, minimal set of measures from crewmembers until the end of the ISS Program in order to characterize the adaptive responses to and risks of living in space. These measures populate a data repository to enable high-level monitoring of countermeasure effectiveness and meaningful interpretation of health and performance outcomes and support future research on planetary missions.

Systems:

RS Water Transfers: Per documented agreements between the US and IP Russia, the crew began transferring water from the USOS to the RS. Surplus water in the USOS was transferred from the Contingency Water Container – Iodine (CWC-I) to an ЕДВ. An ЕДВ is intended for short-term storage and manual water transportation between facilities.

Mobile Servicing System (MSS) Operations: Yesterday, the MSS was powered up, and the Space Station Remote Manipulator System (SSRMS) was maneuvered to survey the International Docking Adapter 2 (IDA2) Striker Plate with the camera on the Latching End Effector (LEE). After the survey was complete, the Mobile Transporter (MT) was translated from Worksite #6 to Worksite #3 in preparation for today’s MSS operations.

Completed Task List Activities:

None

Today’s Ground Activities:

All activities are complete unless otherwise noted.

SSRMS Walkoff and SPDM Unstow

MSS SAGE III Payload Survey [In Work]

MSS Maneuver to EP Flight Releasable Attachment Mechanism (FRAM) Transfer Setup [In Work]

Node 3 Major Constituent Analyzer (MCA) Zero Calibration

Look Ahead Plan

Wednesday, August 24 (GMT 236)

Payloads:

BCM Robot Test

CSA Outreach Video

ESA Powerbank Management

GLACIER Desiccant Swap

IceCube Cube Demo

ISS Ham Pass

ManD Print Remove

LSG Ops

SCEM/FLARE Fastener Loosen

Standard Measures

WiCo-2 Measurements

XROOTS Plant Photo

Systems:

Brine Processor Bladder Remove and Install

WHC Manual Fill Initiation and Termination

UTS Offload EDV Swap

EHS TOCA WRS Analysis

WRS CWC-I Fill Initiation and Termination

Thursday, August 25 (GMT 237)

Payloads:

AWP

ESA Powerbank Stow

LSG Ops

Systems:

FD/ISS Crew Conference

Friday, August 26 (GMT 238)

Payloads:

AstroPi Lens Exchange

ManD Print Removal

LSG Ops

Systems:

EVA Battery Operations Terminal Charge Initiation

Dragon/LAB SSC Swap

ACS Oxygen Manual Valve Open

Today’s Planned Activities:

All activities are complete unless otherwise noted.

[END]
---
[1] Url: https://blogs.nasa.gov/stationreport/2022/08/23/iss-daily-summary-report-8-23-2022/

Published and (C) by NASA
Content appears here under this condition or license: Public Domain.

via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/