March 2019 – ISS On-Orbit Status Report [1]
[]
Date: 2022-08
Extravehicular Activity (EVA) #53: Today, Nick Hague, as EVA Crewmember (EV)-1, and Christina Koch, as EV-2, performed US EVA #53 (Lithium Ion Battery R&R EVA #2) with a Phased Elapsed Time (PET) of 6 hours 45 minutes. The second of two planned battery replacement EVAs, today’s EVA completed the installation of the new batteries brought to ISS during the H-II Transfer Vehicle (HTV)-7 mission. In summary, the crew completed the following tasks:
Install AGB on ESP-2 FHRC
Retrieve Adapter Plate E and F from EP
Install Adapter Plate F in Slot 6
Install Adapter Plate E in Slot 4
Relocate Battery 2 to Adapter Plate E
Retrieve Adapter Plate D from EP and Install in Slot 2
4A3 BCDU and Battery Reconfiguration
P6 Battery Preparation
Completed Task List Activities:
WHC Urine Receptacle Operations Evaluation Part 5 [Completed GMT 87]
EVA Prep Tasks [Completed GMT 87] Enhanced Caution & Warning System OBT SAFER rescue practice Procedures review
Ground Activities:
All activities are complete unless otherwise noted.
EVA support
Saturday, 03/30:
Payloads
METEOR H/W Remove (NASA)
Behaviour Counter Measures (NASA)
ISS Experience review (NASA)
ISS HAM Powerup (NASA)
Systems
EVA Procedures Review and Debrief
DOUG Review
EMU Water Recharge
Sunday, 03/31:
Payloads
HRF Urine Collection setup (NASA)
Optical Nav (Moon Imagery) Ops (NASA)
Systems
Crew off-duty
Monday, 04/01:
Payloads
HRF Blood and Urine Collection (NASA)
Systems
Crew off duty
Today’s Planned Activities:
All activities are complete unless otherwise noted.
[END]
---
[1] Url:
https://blogs.nasa.gov/stationreport/2019/03/
Published and (C) by NASA
Content appears here under this condition or license: Public Domain.
via Magical.Fish Gopher News Feeds:
gopher://magical.fish/1/feeds/news/nasa/