IC4GAT

Model:         IC-4GAT

Division:      Amateur

Note:          This service bulletin is meant for technical per-
               sonnel with experience working on solid state com-
               munications equipment.  Damage caused by im-
               properly installing this modification may cause
               ICOM to charge for subsequent repairs to the
               product.  ICOM does not warrant this modification.

Bulletin #:    00389-001

Date:          January 3, 1989

Subject:       When servicing the radio, the technician may cause
               failure of the +5 V source by improperly replacing
               crystal X-3.  We have seen cases of this occur-
               ring.

Information:   When replacing reference crystal X-3, the physical
               location of the crystal is critical due to close
               spacing of coil L-17.

Procedure

 1.  Make sure the leads of X-3 are insulated with tubing to
     prevent shorting.  If a short does happen the VCO buffer
     signal will be shorted to ground and cause PLL unlock.

 2.  It is suggested that the body of the crystal as well as the
     leads be insulated to prevent contact with L-17 in the VCO
     circuit.

 3.  Do not trim the leads of the replacement crystal as all of
     the supplied length is required.

Downloaded From P-80 International Information Systems 304-744-2253