Internet Engineering Task Force (IETF)                  J. Martocci, Ed.
Request for Comments: 5867                         Johnson Controls Inc.
Category: Informational                                        P. De Mil
ISSN: 2070-1721                                  Ghent University - IBCN
                                                                N. Riou
                                                     Schneider Electric
                                                           W. Vermeylen
                                                    Arts Centre Vooruit
                                                              June 2010


               Building Automation Routing Requirements
                   in Low-Power and Lossy Networks

Abstract

  The Routing Over Low-Power and Lossy (ROLL) networks Working Group
  has been chartered to work on routing solutions for Low-Power and
  Lossy Networks (LLNs) in various markets: industrial, commercial
  (building), home, and urban networks.  Pursuant to this effort, this
  document defines the IPv6 routing requirements for building
  automation.

Status of This Memo

  This document is not an Internet Standards Track specification; it is
  published for informational purposes.

  This document is a product of the Internet Engineering Task Force
  (IETF).  It represents the consensus of the IETF community.  It has
  received public review and has been approved for publication by the
  Internet Engineering Steering Group (IESG).  Not all documents
  approved by the IESG are a candidate for any level of Internet
  Standard; see Section 2 of RFC 5741.

  Information about the current status of this document, any errata,
  and how to provide feedback on it may be obtained at
  http://www.rfc-editor.org/info/rfc5867.













Martocci, et al.              Informational                     [Page 1]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


Copyright Notice

  Copyright (c) 2010 IETF Trust and the persons identified as the
  document authors.  All rights reserved.

  This document is subject to BCP 78 and the IETF Trust's Legal
  Provisions Relating to IETF Documents
  (http://trustee.ietf.org/license-info) in effect on the date of
  publication of this document.  Please review these documents
  carefully, as they describe your rights and restrictions with respect
  to this document.  Code Components extracted from this document must
  include Simplified BSD License text as described in Section 4.e of
  the Trust Legal Provisions and are provided without warranty as
  described in the Simplified BSD License.

  This document may contain material from IETF Documents or IETF
  Contributions published or made publicly available before November
  10, 2008.  The person(s) controlling the copyright in some of this
  material may not have granted the IETF Trust the right to allow
  modifications of such material outside the IETF Standards Process.
  Without obtaining an adequate license from the person(s) controlling
  the copyright in such materials, this document may not be modified
  outside the IETF Standards Process, and derivative works of it may
  not be created outside the IETF Standards Process, except to format
  it for publication as an RFC or to translate it into languages other
  than English.

























Martocci, et al.              Informational                     [Page 2]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


Table of Contents

  1. Introduction ....................................................4
  2. Terminology .....................................................6
     2.1. Requirements Language ......................................6
  3. Overview of Building Automation Networks ........................6
     3.1. Introduction ...............................................6
     3.2. Building Systems Equipment .................................7
          3.2.1. Sensors/Actuators ...................................7
          3.2.2. Area Controllers ....................................7
          3.2.3. Zone Controllers ....................................8
     3.3. Equipment Installation Methods .............................8
     3.4. Device Density .............................................9
          3.4.1. HVAC Device Density .................................9
          3.4.2. Fire Device Density .................................9
          3.4.3. Lighting Device Density ............................10
          3.4.4. Physical Security Device Density ...................10
  4. Traffic Pattern ................................................10
  5. Building Automation Routing Requirements .......................12
     5.1. Device and Network Commissioning ..........................12
          5.1.1. Zero-Configuration Installation ....................12
          5.1.2. Local Testing ......................................12
          5.1.3. Device Replacement .................................13
     5.2. Scalability ...............................................13
          5.2.1. Network Domain .....................................13
          5.2.2. Peer-to-Peer Communication .........................13
     5.3. Mobility ..................................................13
          5.3.1. Mobile Device Requirements .........................14
     5.4. Resource Constrained Devices ..............................15
          5.4.1. Limited Memory Footprint on Host Devices ...........15
          5.4.2. Limited Processing Power for Routers ...............15
          5.4.3. Sleeping Devices ...................................15
     5.5. Addressing ................................................16
     5.6. Manageability .............................................16
          5.6.1. Diagnostics ........................................17
          5.6.2. Route Tracking .....................................17
     5.7. Route Selection ...........................................17
          5.7.1. Route Cost .........................................17
          5.7.2. Route Adaptation ...................................18
          5.7.3. Route Redundancy ...................................18
          5.7.4. Route Discovery Time ...............................18
          5.7.5. Route Preference ...................................18
          5.7.6. Real-Time Performance Measures .....................18
          5.7.7. Prioritized Routing ................................18







Martocci, et al.              Informational                     [Page 3]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


     5.8. Security Requirements .....................................19
          5.8.1. Building Security Use Case .........................19
          5.8.2. Authentication .....................................20
          5.8.3. Encryption .........................................20
          5.8.4. Disparate Security Policies ........................21
          5.8.5. Routing Security Policies to Sleeping Devices ......21
  6. Security Considerations ........................................21
  7. Acknowledgments ................................................22
  8. References .....................................................22
     8.1. Normative References ......................................22
     8.2. Informative References ....................................22
  Appendix A. Additional Building Requirements ......................23
     A.1. Additional Commercial Product Requirements ................23
          A.1.1. Wired and Wireless Implementations .................23
          A.1.2. World-Wide Applicability ...........................23
     A.2. Additional Installation and Commissioning Requirements ....23
          A.2.1. Unavailability of an IP Network ....................23
     A.3. Additional Network Requirements ...........................23
          A.3.1. TCP/UDP ............................................23
          A.3.2. Interference Mitigation ............................23
          A.3.3. Packet Reliability .................................24
          A.3.4. Merging Commissioned Islands .......................24
          A.3.5. Adjustable Routing Table Sizes .....................24
          A.3.6. Automatic Gain Control .............................24
          A.3.7. Device and Network Integrity .......................24
     A.4. Additional Performance Requirements .......................24
          A.4.1. Data Rate Performance ..............................24
          A.4.2. Firmware Upgrades ..................................25
          A.4.3. Route Persistence ..................................25

1.  Introduction

  The Routing Over Low-Power and Lossy (ROLL) networks Working Group
  has been chartered to work on routing solutions for Low-Power and
  Lossy Networks (LLNs) in various markets: industrial, commercial
  (building), home, and urban networks.  Pursuant to this effort, this
  document defines the IPv6 routing requirements for building
  automation.

  Commercial buildings have been fitted with pneumatic, and
  subsequently electronic, communication routes connecting sensors to
  their controllers for over one hundred years.  Recent economic and
  technical advances in wireless communication allow facilities to
  increasingly utilize a wireless solution in lieu of a wired solution,
  thereby reducing installation costs while maintaining highly reliant
  communication.





Martocci, et al.              Informational                     [Page 4]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  The cost benefits and ease of installation of wireless sensors allow
  customers to further instrument their facilities with additional
  sensors, providing tighter control while yielding increased energy
  savings.

  Wireless solutions will be adapted from their existing wired
  counterparts in many of the building applications including, but not
  limited to, heating, ventilation, and air conditioning (HVAC);
  lighting; physical security; fire; and elevator/lift systems.  These
  devices will be developed to reduce installation costs while
  increasing installation and retrofit flexibility, as well as
  increasing the sensing fidelity to improve efficiency and building
  service quality.

  Sensing devices may be battery-less, battery-powered, or mains-
  powered.  Actuators and area controllers will be mains-powered.  Due
  to building code and/or device density (e.g., equipment room), it is
  envisioned that a mix of wired and wireless sensors and actuators
  will be deployed within a building.

  Building management systems (BMSs) are deployed in a large set of
  vertical markets including universities, hospitals, government
  facilities, kindergarten through high school (K-12), pharmaceutical
  manufacturing facilities, and single-tenant or multi-tenant office
  buildings.  These buildings range in size from 100K-sq.-ft.
  structures (5-story office buildings), to 1M-sq.-ft. skyscrapers
  (100-story skyscrapers), to complex government facilities such as the
  Pentagon.  The described topology is meant to be the model to be used
  in all of these types of environments but clearly must be tailored to
  the building class, building tenant, and vertical market being
  served.

  Section 3 describes the necessary background to understand the
  context of building automation including the sensor, actuator, area
  controller, and zone controller layers of the topology; typical
  device density; and installation practices.

  Section 4 defines the traffic flow of the aforementioned sensors,
  actuators, and controllers in commercial buildings.

  Section 5 defines the full set of IPv6 routing requirements for
  commercial buildings.









Martocci, et al.              Informational                     [Page 5]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  Appendix A documents important commercial building requirements that
  are out of scope for routing yet will be essential to the final
  acceptance of the protocols used within the building.

  Section 3 and Appendix A are mainly included for educational
  purposes.

  The expressed aim of this document is to provide the set of IPv6
  routing requirements for LLNs in buildings, as described in
  Section 5.

2.  Terminology

  For a description of the terminology used in this specification,
  please see [ROLL-TERM].

2.1.  Requirements Language

  The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT",
  "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY", and "OPTIONAL" in this
  document are to be interpreted as described in [RFC2119].

3.  Overview of Building Automation Networks

3.1.  Introduction

  To understand the network systems requirements of a building
  management system in a commercial building, this document uses a
  framework to describe the basic functions and composition of the
  system.  A BMS is a hierarchical system of sensors, actuators,
  controllers, and user interface devices that interoperate to provide
  a safe and comfortable environment while constraining energy costs.

  A BMS is divided functionally across different but interrelated
  building subsystems such as heating, ventilation, and air
  conditioning (HVAC); fire; security; lighting; shutters; and
  elevator/lift control systems, as denoted in Figure 1.

  Much of the makeup of a BMS is optional and installed at the behest
  of the customer.  Sensors and actuators have no standalone
  functionality.  All other devices support partial or complete
  standalone functionality.  These devices can optionally be tethered
  to form a more cohesive system.  The customer requirements dictate
  the level of integration within the facility.  This architecture
  provides excellent fault tolerance since each node is designed to
  operate in an independent mode if the higher layers are unavailable.





Martocci, et al.              Informational                     [Page 6]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


                +------+ +-----+ +------+ +------+ +------+ +------+

  Bldg App'ns   |      | |     | |      | |      | |      | |      |

                |      | |     | |      | |      | |      | |      |

  Building Cntl |      | |     | |   S  | |   L  | |   S  | |  E   |

                |      | |     | |   E  | |   I  | |   H  | |  L   |

  Area Control  |  H   | |  F  | |   C  | |   G  | |   U  | |  E   |

                |  V   | |  I  | |   U  | |   H  | |   T  | |  V   |

  Zone Control  |  A   | |  R  | |   R  | |   T  | |   T  | |  A   |

                |  C   | |  E  | |   I  | |   I  | |   E  | |  T   |

  Actuators     |      | |     | |   T  | |   N  | |   R  | |  O   |

                |      | |     | |   Y  | |   G  | |   S  | |  R   |

  Sensors       |      | |     | |      | |      | |      | |      |

                +------+ +-----+ +------+ +------+ +------+ +------+

                 Figure 1: Building Systems and Devices

3.2.  Building Systems Equipment

3.2.1.  Sensors/Actuators

  As Figure 1 indicates, a BMS may be composed of many functional
  stacks or silos that are interoperably woven together via building
  applications.  Each silo has an array of sensors that monitor the
  environment and actuators that modify the environment, as determined
  by the upper layers of the BMS topology.  The sensors typically are
  at the edge of the network structure, providing environmental data
  for the system.  The actuators are the sensors' counterparts,
  modifying the characteristics of the system, based on the sensor data
  and the applications deployed.

3.2.2.  Area Controllers

  An area describes a small physical locale within a building,
  typically a room.  HVAC (temperature and humidity) and lighting (room
  lighting, shades, solar loads) vendors oftentimes deploy area
  controllers.  Area controllers are fed by sensor inputs that monitor



Martocci, et al.              Informational                     [Page 7]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  the environmental conditions within the room.  Common sensors found
  in many rooms that feed the area controllers include temperature,
  occupancy, lighting load, solar load, and relative humidity.  Sensors
  found in specialized rooms (such as chemistry labs) might include air
  flow, pressure, and CO2 and CO particle sensors.  Room actuation
  includes temperature setpoint, lights, and blinds/curtains.

3.2.3.  Zone Controllers

  Zone controllers support a similar set of characteristics to area
  controllers, albeit for an extended space.  A zone is normally a
  logical grouping or functional division of a commercial building.  A
  zone may also coincidentally map to a physical locale such as a
  floor.

  Zone controllers may have direct sensor inputs (smoke detectors for
  fire), controller inputs (room controllers for air handlers in HVAC),
  or both (door controllers and tamper sensors for security).  Like
  area/room controllers, zone controllers are standalone devices that
  operate independently or may be attached to the larger network for
  more synergistic control.

3.3.  Equipment Installation Methods

  A BMS is installed very differently from most other IT networks.  IT
  networks are typically installed as an overlay onto the existing
  environment and are installed from the inside out.  That is, the
  network wiring infrastructure is installed; the switches, routers,
  and servers are connected and made operational; and finally, the
  endpoints (e.g., PCs, VoIP phones) are added.

  BMSs, on the other hand, are installed from the outside in.  That is,
  the endpoints (thermostats, lights, smoke detectors) are installed in
  the spaces first; local control is established in each room and
  tested for proper operation.  The individual rooms are later lashed
  together into a subsystem (e.g., lighting).  The individual
  subsystems (e.g., lighting, HVAC) then coalesce.  Later, the entire
  system may be merged onto the enterprise network.

  The rationale for this is partly due to the different construction
  trades having access to a building under construction at different
  times.  The sheer size of a building often dictates that even a
  single trade may have multiple independent teams working
  simultaneously.  Furthermore, the HVAC, lighting, and fire systems
  must be fully operational before the building can obtain its
  occupancy permit.  Hence, the BMS must be in place and configured
  well before any of the IT servers (DHCP; Authentication,
  Authorization, and Accounting (AAA); DNS; etc.) are operational.



Martocci, et al.              Informational                     [Page 8]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  This implies that the BMS cannot rely on the availability of the IT
  network infrastructure or application servers.  Rather, the BMS
  installation should be planned to dovetail into the IT system once
  the IT system is available for easy migration onto the IT network.
  Front-end planning of available switch ports, cable runs, access
  point (AP) placement, firewalls, and security policies will
  facilitate this adoption.

3.4.  Device Density

  Device density differs, depending on the application and as dictated
  by the local building code requirements.  The following subsections
  detail typical installation densities for different applications.

3.4.1.  HVAC Device Density

  HVAC room applications typically have sensors/actuators and
  controllers spaced about 50 ft. apart.  In most cases, there is a 3:1
  ratio of sensors/actuators to controllers.  That is, for each room
  there is an installed temperature sensor, flow sensor, and damper
  actuator for the associated room controller.

  HVAC equipment room applications are quite different.  An air handler
  system may have a single controller with up to 25 sensors and
  actuators within 50 ft. of the air handler.  A chiller or boiler is
  also controlled with a single equipment controller instrumented with
  25 sensors and actuators.  Each of these devices would be
  individually addressed since the devices are mandated or optional as
  defined by the specified HVAC application.  Air handlers typically
  serve one or two floors of the building.  Chillers and boilers may be
  installed per floor, but many times they service a wing, building, or
  the entire complex via a central plant.

  These numbers are typical.  In special cases, such as clean rooms,
  operating rooms, pharmaceutical facilities, and labs, the ratio of
  sensors to controllers can increase by a factor of three.  Tenant
  installations such as malls would opt for packaged units where much
  of the sensing and actuation is integrated into the unit; here, a
  single device address would serve the entire unit.

3.4.2.  Fire Device Density

  Fire systems are much more uniformly installed, with smoke detectors
  installed about every 50 ft.  This is dictated by local building
  codes.  Fire pull boxes are installed uniformly about every 150 ft.
  A fire controller will service a floor or wing.  The fireman's fire
  panel will service the entire building and typically is installed in
  the atrium.



Martocci, et al.              Informational                     [Page 9]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


3.4.3.  Lighting Device Density

  Lighting is also very uniformly installed, with ballasts installed
  approximately every 10 ft.  A lighting panel typically serves 48 to
  64 zones.  Wired systems tether many lights together into a single
  zone.  Wireless systems configure each fixture independently to
  increase flexibility and reduce installation costs.

3.4.4.  Physical Security Device Density

  Security systems are non-uniformly oriented, with heavy density near
  doors and windows and lighter density in the building's interior
  space.

  The recent influx of interior and perimeter camera systems is
  increasing the security footprint.  These cameras are atypical
  endpoints requiring up to 1 megabit/second (Mbit/s) data rates per
  camera, as contrasted by the few kbit/s needed by most other BMS
  sensing equipment.  Previously, camera systems had been deployed on
  proprietary wired high-speed networks.  More recent implementations
  utilize wired or wireless IP cameras integrated into the enterprise
  LAN.

4.  Traffic Pattern

  The independent nature of the automation subsystems within a building
  can significantly affect network traffic patterns.  Much of the real-
  time sensor environmental data and actuator control stays within the
  local LLN environment, while alarms and other event data will
  percolate to higher layers.

  Each sensor in the LLN unicasts point to point (P2P) about 200 bytes
  of sensor data to its associated controller each minute and expects
  an application acknowledgment unicast returned from the destination.
  Each controller unicasts messages at a nominal rate of 6 kbit/minute
  to peer or supervisory controllers.  Thirty percent of each node's
  packets are destined for other nodes within the LLN.  Seventy percent
  of each node's packets are destined for an aggregation device
  (multipoint to point (MP2P)) and routed off the LLN.  These messages
  also require a unicast acknowledgment from the destination.  The
  above values assume direct node-to-node communication; meshing and
  error retransmissions are not considered.

  Multicasts (point to multipoint (P2MP)) to all nodes in the LLN occur
  for node and object discovery when the network is first commissioned.
  This data is typically a one-time bind that is henceforth persisted.
  Lighting systems will also readily use multicasting during normal
  operations to turn banks of lights "on" and "off" simultaneously.



Martocci, et al.              Informational                    [Page 10]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  BMSs may be either polled or event-based.  Polled data systems will
  generate a uniform and constant packet load on the network.  Polled
  architectures, however, have proven not to be scalable.  Today, most
  vendors have developed event-based systems that pass data on event.
  These systems are highly scalable and generate low data on the
  network at quiescence.  Unfortunately, the systems will generate a
  heavy load on startup since all initial sensor data must migrate to
  the controller level.  They also will generate a temporary but heavy
  load during firmware upgrades.  This latter load can normally be
  mitigated by performing these downloads during off-peak hours.

  Devices will also need to reference peers periodically for sensor
  data or to coordinate operation across systems.  Normally, though,
  data will migrate from the sensor level upwards through the local and
  area levels, and then to the supervisory level.  Traffic bottlenecks
  will typically form at the funnel point from the area controllers to
  the supervisory controllers.

  Initial system startup after a controlled outage or unexpected power
  failure puts tremendous stress on the network and on the routing
  algorithms.  A BMS is comprised of a myriad of control algorithms at
  the room, area, zone, and enterprise layers.  When these control
  algorithms are at quiescence, the real-time data rate is small, and
  the network will not saturate.  An overall network traffic load of 6
  kbit/s is typical at quiescence.  However, upon any power loss, the
  control loops and real-time data quickly atrophy.  A short power
  disruption of only 10 minutes may have a long-term deleterious impact
  on the building control systems, taking many hours to regain proper
  control.  Control applications that cannot handle this level of
  disruption (e.g., hospital operating rooms) must be fitted with a
  secondary power source.

  Power disruptions are unexpected and in most cases will immediately
  impact lines-powered devices.  Power disruptions, however, are
  transparent to battery-powered devices.  These devices will continue
  to attempt to access the LLN during the outage.  Battery-powered
  devices designed to buffer data that has not been delivered will
  further stress network operations when power returns.

  Upon restart, lines-powered devices will naturally dither due to
  primary equipment delays or variance in the device self-tests.
  However, most lines-powered devices will be ready to access the LLN
  network within 10 seconds of power-up.  Empirical testing indicates
  that routes acquired during startup will tend to be very oblique
  since the available neighbor lists are incomplete.  This demands an
  adaptive routing protocol to allow for route optimization as the
  network stabilizes.




Martocci, et al.              Informational                    [Page 11]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.  Building Automation Routing Requirements

  Following are the building automation routing requirements for
  networks used to integrate building sensor, actuator, and control
  products.  These requirements are written not presuming any
  preordained network topology, physical media (wired), or radio
  technology (wireless).

5.1.  Device and Network Commissioning

  Building control systems typically are installed and tested by
  electricians having little computer knowledge and no network
  communication knowledge whatsoever.  These systems are often
  installed during the building construction phase, before the drywall
  and ceilings are in place.  For new construction projects, the
  building enterprise IP network is not in place during installation of
  the building control system.  For retrofit applications, the
  installer will still operate independently from the IP network so as
  not to affect network operations during the installation phase.

  In traditional wired systems, correct operation of a light
  switch/ballast pair was as simple as flipping on the light switch.
  In wireless applications, the tradesperson has to assure the same
  operation, yet be sure the operation of the light switch is
  associated with the proper ballast.

  System-level commissioning will later be deployed using a more
  computer savvy person with access to a commissioning device (e.g., a
  laptop computer).  The completely installed and commissioned
  enterprise IP network may or may not be in place at this time.
  Following are the installation routing requirements.

5.1.1.  Zero-Configuration Installation

  It MUST be possible to fully commission network devices without
  requiring any additional commissioning device (e.g., a laptop).  From
  the ROLL perspective, "zero configuration" means that a node can
  obtain an address and join the network on its own, without human
  intervention.

5.1.2.  Local Testing

  During installation, the room sensors, actuators, and controllers
  SHOULD be able to route packets amongst themselves and to any other
  device within the LLN, without requiring any additional routing
  infrastructure or routing configuration.





Martocci, et al.              Informational                    [Page 12]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.1.3.  Device Replacement

  To eliminate the need to reconfigure the application upon replacing a
  failed device in the LLN, the replaced device must be able to
  advertise the old IP address of the failed device in addition to its
  new IP address.  The routing protocols MUST support hosts and routers
  that advertise multiple IPv6 addresses.

5.2.  Scalability

  Building control systems are designed for facilities from 50,000 sq.
  ft. to 1M+ sq. ft.  The networks that support these systems must
  cost-effectively scale accordingly.  In larger facilities,
  installation may occur simultaneously on various wings or floors, yet
  the end system must seamlessly merge.  Following are the scalability
  requirements.

5.2.1.  Network Domain

  The routing protocol MUST be able to support networks with at least
  2,000 nodes, where 1,000 nodes would act as routers and the other
  1,000 nodes would be hosts.  Subnetworks (e.g., rooms, primary
  equipment) within the network must support up to 255 sensors and/or
  actuators.

5.2.2.  Peer-to-Peer Communication

  The data domain for commercial BMSs may sprawl across a vast portion
  of the physical domain.  For example, a chiller may reside in the
  facility's basement due to its size, yet the associated cooling
  towers will reside on the roof.  The cold-water supply and return
  pipes snake through all of the intervening floors.  The feedback
  control loops for these systems require data from across the
  facility.

  A network device MUST be able to communicate in an end-to-end manner
  with any other device on the network.  Thus, the routing protocol
  MUST provide routes between arbitrary hosts within the appropriate
  administrative domain.

5.3.  Mobility

  Most devices are affixed to walls or installed on ceilings within
  buildings.  Hence, the mobility requirements for commercial buildings
  are few.  However, in wireless environments, location tracking of
  occupants and assets is gaining favor.  Asset-tracking applications,
  such as tracking capital equipment (e.g., wheelchairs) in medical




Martocci, et al.              Informational                    [Page 13]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  facilities, require monitoring movement with granularity of a minute;
  however, tracking babies in a pediatric ward would require latencies
  less than a few seconds.

  The following subsections document the mobility requirements in the
  routing layer for mobile devices.  Note, however, that mobility can
  be implemented at various layers of the system, and the specific
  requirements depend on the chosen layer.  For instance, some devices
  may not depend on a static IP address and are capable of re-
  establishing application-level communications when given a new IP
  address.  Alternatively, mobile IP may be used, or the set of routers
  in a building may give an impression of a building-wide network and
  allow devices to retain their addresses regardless of where they are,
  handling routing between the devices in the background.

5.3.1.  Mobile Device Requirements

  To minimize network dynamics, mobile devices while in motion should
  not be allowed to act as forwarding devices (routers) for other
  devices in the LLN.  Network configuration should allow devices to be
  configured as routers or hosts.

5.3.1.1.  Device Mobility within the LLN

  An LLN typically spans a single floor in a commercial building.
  Mobile devices may move within this LLN.  For example, a wheelchair
  may be moved from one room on the floor to another room on the same
  floor.

  A mobile LLN device that moves within the confines of the same LLN
  SHOULD re-establish end-to-end communication with a fixed device also
  in the LLN within 5 seconds after it ceases movement.  The LLN
  network convergence time should be less than 10 seconds once the
  mobile device stops moving.

5.3.1.2.  Device Mobility across LLNs

  A mobile device may move across LLNs, such as a wheelchair being
  moved to a different floor.

  A mobile device that moves outside of its original LLN SHOULD re-
  establish end-to-end communication with a fixed device also in the
  new LLN within 10 seconds after the mobile device ceases movement.
  The network convergence time should be less than 20 seconds once the
  mobile device stops moving.






Martocci, et al.              Informational                    [Page 14]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.4.  Resource Constrained Devices

  Sensing and actuator device processing power and memory may be 4
  orders of magnitude less (i.e., 10,000x) than many more traditional
  client devices on an IP network.  The routing mechanisms must
  therefore be tailored to fit these resource constrained devices.

5.4.1.  Limited Memory Footprint on Host Devices

  The software size requirement for non-routing devices (e.g., sleeping
  sensors and actuators) SHOULD be implementable in 8-bit devices with
  no more than 128 KB of memory.

5.4.2.  Limited Processing Power for Routers

  The software size requirements for routing devices (e.g., room
  controllers) SHOULD be implementable in 8-bit devices with no more
  than 256 KB of flash memory.

5.4.3.  Sleeping Devices

  Sensing devices will, in some cases, utilize battery power or energy
  harvesting techniques for power and will operate mostly in a sleep
  mode to maintain power consumption within a modest budget.  The
  routing protocol MUST take into account device characteristics such
  as power budget.

  Typically, sensor battery life (2,000 mAh) needs to extend for at
  least 5 years when the device is transmitting its data (200 octets)
  once per minute over a low-power transceiver (25 mA) and expecting an
  application acknowledgment.  In this case, the transmitting device
  must leave its receiver in a high-powered state, awaiting the return
  of the application ACK.  To minimize this latency, a highly efficient
  routing protocol that minimizes hops, and hence end-to-end
  communication, is required.  The routing protocol MUST take into
  account node properties, such as "low-powered node", that produce
  efficient low-latency routes that minimize radio "on" time for these
  devices.

  Sleeping devices MUST be able to receive inbound data.  Messages sent
  to battery-powered nodes MUST be buffered by the last-hop router for
  a period of at least 20 seconds when the destination node is
  currently in its sleep cycle.








Martocci, et al.              Informational                    [Page 15]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.5.  Addressing

  Building management systems require different communication schemes
  to solicit or post network information.  Multicasts or anycasts need
  to be used to decipher unresolved references within a device when the
  device first joins the network.

  As with any network communication, multicasting should be minimized.
  This is especially a problem for small embedded devices with limited
  network bandwidth.  Multicasts are typically used for network joins
  and application binding in embedded systems.  Routing MUST support
  anycast, unicast, and multicast.

5.6.  Manageability

  As previously noted in Section 3.3, installation of LLN devices
  within a BMS follows an "outside-in" work flow.  Edge devices are
  installed first and tested for communication and application
  integrity.  These devices are then aggregated into islands, then
  LLNs, and later affixed onto the enterprise network.

  The need for diagnostics most often occurs during the installation
  and commissioning phase, although at times diagnostic information may
  be requested during normal operation.  Battery-powered wireless
  devices typically will have a self-diagnostic mode that can be
  initiated via a button press on the device.  The device will display
  its link status and/or end-to-end connectivity when the button is
  pressed.  Lines-powered devices will continuously display
  communication status via a bank of LEDs, possibly denoting signal
  strength and end-to-end application connectivity.

  The local diagnostics noted above oftentimes are suitable for
  defining room-level networks.  However, as these devices aggregate,
  system-level diagnostics may need to be executed to ameliorate route
  vacillation, excessive hops, communication retries, and/or network
  bottlenecks.

  In operational networks, due to the mission-critical nature of the
  application, the LLN devices will be temporally monitored by the
  higher layers to assure that communication integrity is maintained.
  Failure to maintain this communication will result in an alarm being
  forwarded to the enterprise network from the monitoring node for
  analysis and remediation.








Martocci, et al.              Informational                    [Page 16]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  In addition to the initial installation and commissioning of the
  system, it is equally important for the ongoing maintenance of the
  system to be simple and inexpensive.  This implies a straightforward
  device swap when a failed device is replaced, as noted in Section
  5.1.3.

5.6.1.  Diagnostics

  To improve diagnostics, the routing protocol SHOULD be able to be
  placed in and out of "verbose" mode.  Verbose mode is a temporary
  debugging mode that provides additional communication information
  including, at least, the total number of routed packets sent and
  received, the number of routing failures (no route available),
  neighbor table members, and routing table entries.  The data provided
  in verbose mode should be sufficient that a network connection graph
  could be constructed and maintained by the monitoring node.

  Diagnostic data should be kept by the routers continuously and be
  available for solicitation at any time by any other node on the
  internetwork.  Verbose mode will be activated/deactivated via
  unicast, multicast, or other means.  Devices having available
  resources may elect to support verbose mode continuously.

5.6.2.  Route Tracking

  Route diagnostics SHOULD be supported, providing information such as
  route quality, number of hops, and available alternate active routes
  with associated costs.  Route quality is the relative measure of
  "goodness" of the selected source to destination route as compared to
  alternate routes.  This composite value may be measured as a function
  of hop count, signal strength, available power, existing active
  routes, or any other criteria deemed by ROLL as the route cost
  differentiator.

5.7.  Route Selection

  Route selection determines reliability and quality of the
  communication among the devices by optimizing routes over time and
  resolving any nuances developed at system startup when nodes are
  asynchronously adding themselves to the network.

5.7.1.  Route Cost

  The routing protocol MUST support a metric of route quality and
  optimize selection according to such metrics within constraints
  established for links along the routes.  These metrics SHOULD reflect
  metrics such as signal strength, available bandwidth, hop count,
  energy availability, and communication error rates.



Martocci, et al.              Informational                    [Page 17]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.7.2.  Route Adaptation

  Communication routes MUST be adaptive and converge toward optimality
  of the chosen metric (e.g., signal quality, hop count) in time.

5.7.3.  Route Redundancy

  The routing layer SHOULD be configurable to allow secondary and
  tertiary routes to be established and used upon failure of the
  primary route.

5.7.4.  Route Discovery Time

  Mission-critical commercial applications (e.g., fire, security)
  require reliable communication and guaranteed end-to-end delivery of
  all messages in a timely fashion.  Application-layer time-outs must
  be selected judiciously to cover anomalous conditions such as lost
  packets and/or route discoveries, yet not be set too large to over-
  damp the network response.  If route discovery occurs during packet
  transmission time (reactive routing), it SHOULD NOT add more than 120
  ms of latency to the packet delivery time.

5.7.5.  Route Preference

  The routing protocol SHOULD allow for the support of manually
  configured static preferred routes.

5.7.6.  Real-Time Performance Measures

  A node transmitting a "request with expected reply" to another node
  must send the message to the destination and receive the response in
  not more than 120 ms.  This response time should be achievable with 5
  or less hops in each direction.  This requirement assumes network
  quiescence and a negligible turnaround time at the destination node.

5.7.7.  Prioritized Routing

  Network and application packet routing prioritization must be
  supported to assure that mission-critical applications (e.g., fire
  detection) cannot be deferred while less critical applications access
  the network.  The routing protocol MUST be able to provide routes
  with different characteristics, also referred to as Quality of
  Service (QoS) routing.








Martocci, et al.              Informational                    [Page 18]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.8.  Security Requirements

  This section sets forth specific requirements that are placed on any
  protocols developed or used in the ROLL building environment, in
  order to ensure adequate security and retain suitable flexibility of
  use and function of the protocol.

  Due to the variety of buildings and tenants, the BMSs must be
  completely configurable on-site.

  Due to the quantity of the BMS devices (thousands) and their
  inaccessibility (oftentimes above ceilings), security configuration
  over the network is preferred over local configuration.

  Wireless encryption and device authentication security policies need
  to be considered in commercial buildings, while keeping in mind the
  impact on the limited processing capabilities and additional latency
  incurred on the sensors, actuators, and controllers.

  BMSs are typically highly configurable in the field, and hence the
  security policy is most often dictated by the type of building to
  which the BMS is being installed.  Single-tenant owner-occupied
  office buildings installing lighting or HVAC control are candidates
  for implementing a low level of security on the LLN, especially when
  the LLN is not connected to an external network.  Antithetically,
  military or pharmaceutical facilities require strong security
  policies.  As noted in the installation procedures described in
  Sections 3.3 and 5.2, security policies MUST support dynamic
  configuration to allow for a low level of security during the
  installation phase (prior to building occupancy, when it may be
  appropriate to use only diagnostic levels of security), yet to make
  it possible to easily raise the security level network-wide during
  the commissioning phase of the system.

5.8.1.  Building Security Use Case

  LLNs for commercial building applications should always implement and
  use encrypted packets.  However, depending on the state of the LLN,
  the security keys may either be:

  1) a key obtained from a trust center already operable on the LLN;

  2) a pre-shared static key as defined by the general contractor or
     its designee; or

  3) a well-known default static key.





Martocci, et al.              Informational                    [Page 19]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  Unless a node entering the network had previously received its
  credentials from the trust center, the entering node will try to
  solicit the trust center for the network key.  If the trust center is
  accessible, the trust center will MAC-authenticate the entering node
  and return the security keys.  If the trust center is not available,
  the entering node will check to determine if it has been given a
  network key by an off-band means and use it to access the network.
  If no network key has been configured in the device, it will revert
  to the default network key and enter the network.  If neither of
  these keys were valid, the device would signal via a fault LED.

  This approach would allow for independent simplified commissioning,
  yet centralized authentication.  The building owner or building type
  would then dictate when the trust center would be deployed.  In many
  cases, the trust center need not be deployed until all of the local
  room commissioning is complete.  Yet, at the province of the owner,
  the trust center may be deployed from the onset, thereby trading
  installation and commissioning flexibility for tighter security.

5.8.2.  Authentication

  Authentication SHOULD be optional on the LLN.  Authentication SHOULD
  be fully configurable on-site.  Authentication policy and updates
  MUST be routable over-the-air.  Authentication SHOULD occur upon
  joining or rejoining a network.  However, once authenticated, devices
  SHOULD NOT need to reauthenticate with any other devices in the LLN.
  Packets may need authentication at the source and destination nodes;
  however, packets routed through intermediate hops should not need
  reauthentication at each hop.

  These requirements mean that at least one LLN routing protocol
  solution specification MUST include support for authentication.

5.8.3.  Encryption

5.8.3.1.  Encryption Types

  Data encryption of packets MUST be supported by all protocol solution
  specifications.  Support can be provided by use of a network-wide key
  and/or an application key.  The network key would apply to all
  devices in the LLN.  The application key would apply to a subset of
  devices in the LLN.

  The network key and application key would be mutually exclusive.  The
  routing protocol MUST allow routing a packet encrypted with an
  application key through forwarding devices without requiring each
  node in the route to have the application key.




Martocci, et al.              Informational                    [Page 20]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


5.8.3.2.  Packet Encryption

  The encryption policy MUST support either encryption of the payload
  only or of the entire packet.  Payload-only encryption would
  eliminate the decryption/re-encryption overhead at every hop,
  providing more real-time performance.

5.8.4.  Disparate Security Policies

  Due to the limited resources of an LLN, the security policy defined
  within the LLN MUST be able to differ from that of the rest of the IP
  network within the facility, yet packets MUST still be able to route
  to or through the LLN from/to these networks.

5.8.5.  Routing Security Policies to Sleeping Devices

  The routing protocol MUST gracefully handle routing temporal security
  updates (e.g., dynamic keys) to sleeping devices on their "awake"
  cycle to assure that sleeping devices can readily and efficiently
  access the network.

6.  Security Considerations

  The requirements placed on the LLN routing protocol in order to
  provide the correct level of security support are presented in
  Section 5.8.

  LLNs deployed in a building environment may be entirely isolated from
  other networks, attached to normal IP networks within the building
  yet physically disjoint from the wider Internet, or connected either
  directly or through other IP networks to the Internet.  Additionally,
  even where no wired connectivity exists outside of the building, the
  use of wireless infrastructure within the building means that
  physical connectivity to the LLN is possible for an attacker.

  Therefore, it is important that any routing protocol solution
  designed to meet the requirements included in this document addresses
  the security features requirements described in Section 5.8.
  Implementations of these protocols will be required in the protocol
  specifications to provide the level of support indicated in Section
  5.8, and will be encouraged to make the support flexibly configurable
  to enable an operator to make a judgment of the level of security
  that they want to deploy at any time.

  As noted in Section 5.8, use/deployment of the different security
  features is intended to be optional.  This means that, although the
  protocols developed must conform to the requirements specified, the
  operator is free to determine the level of risk and the trade-offs



Martocci, et al.              Informational                    [Page 21]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


  against performance.  An implementation must not make those choices
  on behalf of the operator by avoiding implementing any mandatory-to-
  implement security features.

  This informational requirements specification introduces no new
  security concerns.

7.  Acknowledgments

  In addition to the authors, JP. Vasseur, David Culler, Ted Humpal,
  and Zach Shelby are gratefully acknowledged for their contributions
  to this document.

8.  References

8.1.  Normative References

  [RFC2119]   Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119, March 1997.

8.2.  Informative References

  [ROLL-TERM] Vasseur, JP., "Terminology in Low power And Lossy
              Networks", Work in Progress, March 2010.



























Martocci, et al.              Informational                    [Page 22]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


Appendix A.  Additional Building Requirements

  Appendix A contains additional building requirements that were deemed
  out of scope for ROLL, yet provided ancillary substance for the
  reader.

A.1.  Additional Commercial Product Requirements

A.1.1.  Wired and Wireless Implementations

  Vendors will likely not develop a separate product line for both
  wired and wireless networks.  Hence, the solutions set forth must
  support both wired and wireless implementations.

A.1.2.  World-Wide Applicability

  Wireless devices must be supportable unlicensed bands.

A.2.  Additional Installation and Commissioning Requirements

A.2.1.  Unavailability of an IP Network

  Product commissioning must be performed by an application engineer
  prior to the installation of the IP network (e.g., switches, routers,
  DHCP, DNS).

A.3.  Additional Network Requirements

A.3.1.  TCP/UDP

  Connection-based and connectionless services must be supported.

A.3.2.  Interference Mitigation

  The network must automatically detect interference and seamlessly
  switch the channel to improve communication.  Channel changes, and
  the nodes' responses to a given channel change, must occur within 60
  seconds.













Martocci, et al.              Informational                    [Page 23]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


A.3.3.  Packet Reliability

  In building automation, it is required that the network meet the
  following minimum criteria:

  <1% MAC-layer errors on all messages, after no more than three
  retries;

  <0.1% network-layer errors on all messages, after no more than three
  additional retries;

  <0.01% application-layer errors on all messages.

  Therefore, application-layer messages will fail no more than once
  every 100,000 messages.

A.3.4.  Merging Commissioned Islands

  Subsystems are commissioned by various vendors at various times
  during building construction.  These subnetworks must seamlessly
  merge into networks and networks must seamlessly merge into
  internetworks since the end user wants a holistic view of the system.

A.3.5.  Adjustable Routing Table Sizes

  The routing protocol must allow constrained nodes to hold an
  abbreviated set of routes.  That is, the protocol should not mandate
  that the node routing tables be exhaustive.

A.3.6.  Automatic Gain Control

  For wireless implementations, the device radios should incorporate
  automatic transmit power regulation to maximize packet transfer and
  minimize network interference, regardless of network size or density.

A.3.7.  Device and Network Integrity

  Commercial-building devices must all be periodically scanned to
  assure that each device is viable and can communicate data and alarm
  information as needed.  Routers should maintain previous packet flow
  information temporally to minimize overall network overhead.

A.4.  Additional Performance Requirements

A.4.1.  Data Rate Performance

  An effective data rate of 20 kbit/s is the lowest acceptable
  operational data rate on the network.



Martocci, et al.              Informational                    [Page 24]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


A.4.2.  Firmware Upgrades

  To support high-speed code downloads, routing should support
  transports that provide parallel downloads to targeted devices, yet
  guarantee packet delivery.  In cases where the spatial position of
  the devices requires multiple hops, the algorithm should recurse
  through the network until all targeted devices have been serviced.
  Devices receiving a download may cease normal operation, but upon
  completion of the download must automatically resume normal
  operation.

A.4.3.  Route Persistence

  To eliminate high network traffic in power-fail or brown-out
  conditions, previously established routes should be remembered and
  invoked prior to establishing new routes for those devices re-
  entering the network.


































Martocci, et al.              Informational                    [Page 25]

RFC 5867    Building Automation Routing Requirements in LLNs   June 2010


Authors' Addresses

  Jerry Martocci
  Johnson Controls Inc.
  507 E. Michigan Street
  Milwaukee, WI  53202
  USA
  Phone: +1 414 524 4010
  EMail: [email protected]


  Pieter De Mil
  Ghent University - IBCN
  G. Crommenlaan 8 bus 201
  Ghent  9050
  Belgium
  Phone: +32 9331 4981
  Fax:   +32 9331 4899
  EMail: [email protected]


  Nicolas Riou
  Schneider Electric
  Technopole 38TEC T3
  37 quai Paul Louis Merlin
  38050 Grenoble Cedex 9
  France
  Phone: +33 4 76 57 66 15
  EMail: [email protected]


  Wouter Vermeylen
  Arts Centre Vooruit
  Ghent  9000
  Belgium
  EMail: [email protected]