R o l l e r c o a s t e r   T y c o o n   2
               -~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-~-
                                 by CGorman
______________________________________________________________________________
                                  NOTICES
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
*1* - This is quite a long guide, so to find the section your looking for, you
should use Internet Explorers "Find" Facility. Press Ctrl + F and type in the
word you are looking for (e.g. Inverted Shuttle Coaster)

*2* - I have used € in this guide! However in the game €1 = $1 = £1! For other
countries see the currency section.

*3* - Prices may not be exactly right as costs fluctuate according to terrian.

*4* - For more information regarding the Roller Coasters in RCT2, check out my
coaster construction FAQ on Gamefaqs.


/-------------------------------IMPORTANT-----------------------------------\
|*5* - The golden rule in this game is to charge the excitement rating as   |
|the addmission to each ride (e.g. exitement rating: 5.73, you charge €5.70)|
\-------------------------------IMPORTANT-----------------------------------/

______________________________________________________________________________
                                 I. General
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Game...........Rollercoaster Tycoon 2
Platform.......PC/Windows
Type...........FAQ/Strategy Guide
Completion.....100%
Version........Final
Author.........CGorman
First Updated..4th Jan 2003
Last Update....4th July 2004
[email protected] (see Contact Notice)
CRP............http://www.gamefaqs.com/features/recognition/15853.html

(C) Ciaran Gorman 2002 & 2003 & 2004 (See Copyright)
______________________________________________________________________________
                            II. Table of Contents
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
1.0 - Introduction
2.0 - Strategy Guides (Beginner Parks)
3.0 - Strategy Guides (Challenging Parks)
4.0 - Strategy Guides (Expert Parks)
5.0 - Strategy Guides (Real Parks)
6.0 - Strategy Guides (Other Parks)
7.0 - Rollercoasters
8.0 - Other Rides
9.0 - Shops/Stalls
10.0 - General Tips/Hints
11.0 - Finance
12.0 - The Last Words
___________________
1.0 - Introduction:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     I   - General
     II  - Table of Contents
_______________________________________
2.0 - Strategy Guides (Beginner Parks):
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Crazy Castle
     (B) - Electric Fields
     (C) - Factory Capers
__________________________________________
3.0 - Strategy Guides (Challenging Parks):
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Amity Airfield
     (B) - Botany Breakers
     (C) - Bumbly Bazaar
     (D) - Dusty Greens
     (E) - Fungus Woods
     (F) - Gravity Gardens
     (G) - Infernal Views
_____________________________________
4.0...Strategy Guides (Expert Parks):
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Alpine Adventures
     (B) - Extreme Heights
     (C) - Ghost Town
     (D) - Lucky Lake
     (F) - Rainbow Summit
___________________________________
5.0...Strategy Guides (Real Parks):
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Six Flags Belgium
     (B) - Six Flags Great Adventure
     (C) - Six Flags Holland
     (D) - Six Flags Magic Mountain
     (E) - Six Flags over Texas
____________________________________
6.0...Strategy Guides (Other Parks):
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Build your own Six Flags Belgium
     (B) - Build your own Six Flags Great Adventure
     (C) - Build your own Six Flags Holland
     (D) - Build your own Six Flags Magic Mountain
     (E) - Build your own Six Flags over Texas
_____________________
7.0...Rollercoasters:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A1) - Air Powered Vertical Coaster
     (A2) - Bobsleigh Coaster
     (A3) - Compact Inverted Coaster
     (B1) - Corkscrew Roller Coaster
     (B2) - Floorless Roller Coaster
     (B3) - Flying Roller Coaster
     (C1) - Flying Turns
     (C2) - Giga Coaster
     (C3) - Heartline Twister Roller Coaster
     (D1) - Hypercoaster
     (D2) - Inverted Harpin Coaster
     (D3) - Inverted Impluse Coaster
     (E1) - Inverted Roller Coaster
     (E2) - Inverted Shuttle Coaster
     (E3) - Inverted Vertical Coaster
     (F1) - Junior Roller Coaster
     (F2) - LIM Launched Roller Coaster
     (F3) - Lay-down Roller Coaster
     (G1) - Looping Roller Coaster
     (G2) - Mine Ride
     (G3) - Mine Train Coaster
     (H1) - Mini Roller Coaster
     (H2) - Mini Suspended Coaster
     (H3) - Mini Suspended Flying Coaster
     (I1) - Motorbike Races
     (I2) - Multi-Dimension Roller Coaster
     (I3) - Reverse Freefall Coaster
     (J1) - Reverser Roller Coaster
     (J2) - Side-Friction Roller Coaster
     (J3) - Soap Box Derby
     (K1) - Spinning Wild Mouse
     (K2) - Sprial Roller Coaster
     (K3) - Stand-up Roller Coaster
     (L1) - Stand-up Twister Coaster
     (L2) - Steeplechase
     (L3) - Suspended Swinging Coaster
     (M1) - Twister Roller Coaster
     (M2) - Vertical Drop Roller Coaster
     (M3) - Virgina Reel
     (N1) - Water Coaster
     (N2) - Wild Mouse Coaster
     (N3) - Wooden Roller Coaster
     (O1) - Wooden Wild Mine Ride
     (O2) - Wooden Wild Mouse
__________________
8.0...Other Rides:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A1) - 3D Cinema
     (A2) - Boat Hire
     (A3) - Bumper Cars
     (B1) - Chairlift
     (B2) - Chesire Cats
     (B3) - Circus Show
     (C1) - Crooked House
     (C2) - Cycle Railway
     (C3) - Double-Deck Observation Tower
     (D1) - Elevator
     (D2) - Enterprise
     (D3) - Ferris Wheel
     (E1) - Flying Saucers
     (E2) - Ghost Train
     (E3) - Go Karts
     (F1) - Haunted House
     (F2) - Haunted Mansion
     (F3) - Hedge Maze
     (G1) - Jet Skis
     (G2) - Log Flume
     (G3) - Merry-Go-Round
     (H1) - Mini Cars
     (H2) - Mini Golf
     (H3) - Mini Helicopters
     (I1) - Minituare Railway
     (I2) - Monorail
     (I3) - Monster Trucks
     (J1) - Motion Simulator
     (J2) - Observation Tower
     (J3) - Raft Ride
     (K1) - River Rapids
     (K2) - River Ride
     (K3) - Roto Drop
     (L1) - Snow Cups
     (L2) - Space Rings
     (L3) - Spiral Slide
     (M1) - Suspended Monorail
     (M2) - Swinging Inverted Ship
     (M3) - Swinging Ship
     (N1) - Tram Ride
     (N2) - Water Coaster
     (N3) - Water Slide
___________________
9.0 - Shops/Stalls:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A1) - Balloon Stall
     (A2) - Beef Noodle Stall
     (A3) - Burger Bar
     (B1) - Candy Apple Stall
     (B2) - Cash Machine
     (B3) - Chicken Nuggets Stall
     (C1) - Coffee Shop
     (C2) - Cookie Shop
     (C3) - Cotton Candy Stall
     (D1) - Donut Shop
     (D2) - Drink Stall
     (D3) - First Aid Station
     (E1) - Fried Chicken Stall
     (E2) - Fried Rice Noodles Stall
     (F1) - Fries Stall
     (F2) - Fruity Ices Stall
     (F3) - Funnel Cake Shop
     (G1) - Hat Stall
     (G2) - Hot Chocolate Stall
     (G3) - Hot Dog Stall
     (H1) - Ice Cream Cone Stall
     (H2) - Iced Tea Stall
     (H3) - Information Kiosk
     (I1) - Lemonade Stall
     (I2) - Meatball Soup Stall
     (I3) - Pizza Stall
     (J1) - Popcorn Stall
     (J2) - Pretzel Stall
     (J3) - Restroom
     (K1) - Restroom 2
     (K2) - Roast Sausage Stall
     (K3) - Seafood Stall
     (L1) - Souvenir Stall
     (L2) - Soybean Milk Stall
     (L3) - Star Fruit Drink Stall
     (M1) - Sub Sandwich Stall
     (M2) - Sujongkwa Stall
     (M3) - Sunglasses Stall
     (N1) - T-Shirt Stall
     (N2) - Wonton Soup Stall
__________________________
10.0 - General Tips/Hints:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Staff Organisation
     (B) - Queues
     (C) - Adding Excitment to Rides
     (D) - Q&A (technical questions & general)
     (E) - Reader Contributions
     (F) - Websites/Links
     (G) - Rest in Series
     (H) - Cheats/Easter Eggs
     (I) - Park Awards
     (J) - Term Dictionary/Information
_______________
11.0 - Finance:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Balancing your Budget
     (B) - Currencys
______________________
12.0 - The Last Words:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
     (A) - Version History
     (B) - Full Copyright
     (C) - Contact Notice
     (D) - Credits
     (E) - Outro
______________________________________________________________________________
                               2-A Crazy Castle
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................You have inherited a large castle - your job
                               is to convert it into a small theme park.
Objectives......................To have at least 1,500 guests in your park at
                               the end of October, Year 4, with a park rating
                               of at least 600.
Initial Guests in Park..........2
Initial Rating..................500
Park Size.......................690,800 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 5% per year
Initial Company Value...........€14
Initial Park Value..............€14
Buy Land........................Yes - at €75 per square
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o Crazy Castle is a fairly easy park. The main thing to remember is to keep
 the theme of a castle - don't go off building space themed rocket coasters
 - that is a waste of time.

o To start, build a few (2 or 3) gentle rides. Make sure to spread them evenly
 around the park. There is no need to theme them with castle themeing until
 year two or three because a) you can't afford it, b) your guest numbers are
 low, and c) your time is not worth it.

o Next thing, build a medium sized roller coaster inside the walls of the
 castle (medium intensity). Make sure the excitement rating is fairly high
 because you will always charge it as the entrance fee (e.g. excite. rate.
 5.78, you charge €5.80).

o Next build another rollercoaster outside the walls of the castle to again
 create a good source of income.

o Don't be afraid to borrow - your aim is guest figures, not low debt figures.
 Use some of your extra cash from debt to finance big rides such as log
 flumes. Spread these big rides throughtout the park and build lots of little
 rides around them. These major rides attract guests and create profit, the
 little rides create money and distract guests from the big rides (so queues
 stay shorter).

o Make sure to build the big rides FIRST and base the small rides around them
 - not the other way round, because it is easier to move small rides than big
 ones.

o Hire plenty of staff, again guest attraction and satisfaction are more
 important than long term cashflow stability.

o Make sure to build a few shops and stalls - again spread them out, food
 courts lock nice, but only work (make money) with over a thousned guests or
 so.

o When you have several rides you can do a bit of themeing around those
 smaller rides. Also do up your queues and paths because guest satisfaction
 comes first.

o Your advertising and marketing spending should be kept high from early Year
 3. You must be aiming to have 1,000 guests or more by the end of Year 3 if
 you want to succeed in this level.

o Continue rapid expansion of big rides and advertising till the end. If you
 are struggling to get the 1,500 guests by the end of Year 4, cut ride
 entrance fees and boost your park rating (that attracts guests) by hiring
 lots of staff.
______________________________________________________________________________
                             2-B Electric Fields
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................You have inherited a small farm and your
                               challenge is to build it into a small theme
                               park amongst the fields and farm buildings.
Objectives......................To have at least 700 guests in your park by
                               the end of October Year 2 with a park rating
                               of 600.
Initial Guests in Park..........40
Initial Rating..................434
Park Size.......................485,650 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 5% per year
Initial Company Value...........€7,930
Initial Park Value..............€7,930
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Rowing Boats 1

o Ok this park is rather underdeveloped - theres only one ride - so in the
 first few months concentrate on rapidly building rides to bring up guest
 numbers - don't be too concerned about profit and cash levels.

o First thing to do is to raise the ticket price of Rowing Boats 1 to €2.20
 (its excitement rating) then build a few (at least 2) small/medium
 rollercoasters and one large one - spend at least €12,000 on these coasters.

o Make sure to place a Information Kiosk at the entrance to generate revenue
 from map sales.

o Build some thrill rides around the rollercoasters - this prevents
 rollercoaster queues from getting too long and also generates lots of money.

o Stick to pre-designed rides and rollercoasters - you don't have time to
 waste designing fancy track layouts - and you don't have the money either!

o Build a few food and drink stalls scattered throughout the park. They are
 unlikely to make money until Year 2, but they will keep the guests happy
 which is your main objective on this particular level. Similerly build
 plenty of toilets and other aminities such as cash-machines and first aid
 rooms.

o Keep building right throught the game - the bigger the park - the more
 guests you will attract. Even small rides will boost your park - however
 save up every now and then for a new 'Mega' attraction - one that will
 attract guests just for it.

o Spend most of your income on new rides and keep borrowing, but don't neglect
 hiring staff such as entertainers - guest satisfaction is worth more than a
 second merry-go-round and also spend a large amount on advertising and park
 promotion - use the marketing option to offer 'free rides' all the time on
 your best rollercoasters and keep your advertising campaigns running year
 round.

o Remember your primary objective - guests numbers and satisfaction - bad
 paths, little staff, no food etc., deters and angers guests - new rides,
 straight paths, interesting foods please and attract guests.
______________________________________________________________________________
                              2-C Factory Capers
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................An abandoned factory complex is an opportunity
                               to build a mechanical-themed amusement park.
Objectives......................To have at least 1,100 guests in your park by
                               October Year 3 and achieve a park rating of
                               600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................527,890 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 5% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free rides
Rides Already Built.............None

o Start off by building a few major rollercoasters (borrow €5,000-€6,000 if
 you need to) - like the previous two parks, your aim is guests not money

o You have more time this time so you can afford to design rides and your
 path routes (keep paths simple). You can afford to build an extensive
 transport system which will generate lots of cash for park expanision.

o There is no need to spend heavily on marketing for the first two years -
 concentrate on attracting guests by good rides not good adverts.

o Since you have more time, you can afford to develop the factory theme in
 the park, however don't spend too much over a couple of thousend to develop
 your themeing because your money is better spent on rides.

o Fill the park with thrill rides and rollercoasters - gentle rides will
 generally look out of place in this park.

o In the finally year you can start to market the park a bit more if your
 guest numbers are falling short.
______________________________________________________________________________
                              3-A Amity Airfield
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build a flying-themed amusement park in this
                               abandoned airfield.
Objectives......................To have at least 3,000 guests in your park by
                               the end of October Year 4 and your park rating
                               must be at least 600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,235,630 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o This is a large park, so you can spread your rides out and think big. Build
 a few large rollercoasters to start - borrow a few thousned.

o A good transport system is needed in this park - to both help guests and rob
 them of there free cash! Build a few stations if possible.

o Since this level is fairly long (4 years), it is worth looking and minding
 the finances early on. In the first few parks I told you to expand at all
 costs to attract guests - the money was'nt going to be a problem - well now
 it will be because you have to finance the park for a much longer period.

o Repay your loan (or keep it low) because an interest rate of 10% is costly
 (€15,000 loan = interest of €6,000 over 4 years) - maybe aim to knock a
 thousned off every three months. However if you really need the money, don't
 hesitate in borrowing.

o No need to start marketing the park till the end of year 2 because new rides
 alone will attract plenty of guests early on.

o Don't forget to build shops and stalls, because like I said money can be
 difficult in this level and shops and stalls generate cash flow.

o Build a few information Kiosks because like I said this is a big park and
 guests will get lost.
______________________________________________________________________________
                             3-B Botany Breakers
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Your challenge is to build a high-profit park
                               on this paradise island.
Objectives......................To achieve a ticket income of €10,000 per
                               month.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................548,240 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o Unlike the earlier levels your STATED aim is not guest numbers or happiness,
 but profit - however don't work towards profit - it will only come if you
 can build guest numbers.

o The terrain in this park is tough to build on and expensive. Build two very
 good rollercoasters in the center of the island to start and link them to
 the path. For the next year just build thrill rides and gentle rides because
 as you will see rollercoaster construction is very very expensive - so those
 first two better be good!

o Concentrate on rides with high excitement ratings and short ride times
 because you can charge most for these and get through lots of people. When
 your building a custom-desiged rollercoaster or other such ride make sure
 to select the highest number of cars, trains, boats etc possible for that
 ride because the more capacity - the more paying guests you can have per
 hour on that ride.

o Althought the aim is ticket sales, shop sales won't make you any poorer!
 Make sure to build enough to keep guests happy (but not to many, they cost
 money to build)

o Invest every single euro in new rides - not fancy themeing, fancy path
 layouts or redisigning old rides - the simple fact is you cannot clear this
 park with just 10 or 11 rides (well not very easily) you need 20, 30 or
 more!

o Don't advertise - need rides will do that for you. Also keep staff numbers
 low (except mecanics... so no entertainers, only a few security gaurds and
 handymen and plenty of mecanics.)
______________________________________________________________________________
                               3-C Bumbly Bazaar
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Starting with a small market bazaar, your
                               challenge is to increase the profit from shops
                               and stalls by building rides and
                               rollercoasters to attract coustomers.
Objectives......................To achieve a stall income of €1,000 per month.
Initial Guests in Park..........41
Initial Rating..................467
Park Size.......................1,013,100 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None only shops

o Again unlike the last few parks you have a new objective - stall income.
 Like I said about Botany Breakers, don't worry about the objective -
 concentrate on guest numbers - 500 guests spending €0.75 each on average is
 not as good as 1,500 guests spending €0.50 each on average - so build rides
 and market the park early on instead of new shops.

o Spread out your stalls through-out the park to maximise sales. Also don't
 keep building the same stall and have 'Sunglasses Stall 1'...2...and 3,
 build different stalls throughout the park - the same person will buy a hat,
 glasses, a map and a souvenior - not 4 pairs of glasses.

o Foodcourts only work after guest numbers have reached about 2,000
______________________________________________________________________________
                               3-D Dusty Greens
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Situated near a highway junction in the
                               desert, Dusty Greens is an opportunity to
                               develop a small golf course into a thriving
                               theme park.
Objectives......................To achieve a ticket income of €5,000 per
                               month.
Initial Guests in Park..........79
Initial Rating..................605
Park Size.......................219,120 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€7,933
Initial Park Value..............€7,933
Buy Land........................Yes
Buy Construction Rights.........Yes
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Mini Golf 1
                               Mini Golf 2

o Firstly demolish both Mini Golfs and build rollercoasters in their place -
 how many mini golfs have you met so far that match a rollercoasters
 profitability?

o After those 2 rollercoasters only build small thrill rides and gentle rides
 or (very small rollercoasters such as wild mouses) because space is at a
 premium.

o The ideal ride has a high excitement rating ( = high addmission price) and a
 short duration (more guests per hour) - such as wild mouses and thrill rides
 such as launched freefall.

o After a year or two check to see what your most profitably ride is (other
 than the two rollercoasters) - then build one the exact same as it at the
 other side of the park.
______________________________________________________________________________
                               3-E Fungus Woods
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Restricted to only older-style wooden rides,
                               your challenge is to build a thriving theme
                               park in Fungus woods.
Objectives......................To have at least 2,500 guest in your park by
                               the end of October Year 4 with a park rating
                               of at least 600.
Initial Guests in Park..........24
Initial Rating..................309
Park Size.......................523,380 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€6,638
Initial Park Value..............€6,638
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Merry-Go-Round 1

o Firstly build a few (at least 2) good wooden rollercoasters - these will
 attract guests to the park and keep several hundred happy at any given time
 (in a park without ride addmissions income and a guest no. objective - the
 fewer expensive running-cost rides the better). Think of it this way your
 objective is to entertain (or atleast occupy) your 2,500 guests all at the
 same time - which way is best - 30 small rides costing €46.90 each to run
 or 7 large ones costing €150 each to run. My calculator says the 7 large
 ones.

o Market your big rides heavily - your aim is guest numbers. Also hire plenty
 of staff, guest happiness is important.

o Cut your research budget, you won't need and can't build many of the new
 rollercoasters - so theres no point spending money to discover them.
______________________________________________________________________________
                             3-F Gravity Gardens
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Your challenge is to build a roller coaster
                               park in the beautiful Gravity Gardens - No
                               other rides, just Roller Coasters.
Objectives......................To achieve a park value of at least €500,000
                               and repay your loan.
Initial Guests in Park..........117
Initial Rating..................776
Park Size.......................1,676,400 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 8% per year
Initial Company Value...........€45,082
Initial Park Value..............€45,082
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built............."Treetop Flyer" (Wooden Roller Coaster)

o  This is a really great park. You have no time limit, and a hugh amount of
  space. The landscape offers many opportunities to build interesting roller
  coasters. Unfortuatly you are ONLY allowed to build Roller Coasters.

o  Start by borrowing the maximum loan of €45,000 and building a substantial
  roller coaster that has been pre-designed - preferably a corkscrew or
  twister.

o  Immidiatly add another two slightly smaller roller coasters. Make sure to
  spread your roller coasters out through the park, this will eliminate
  Guests leaving the park quickly or refusing to pay a large entrance fee.

o  You now have 4 roller coasters in opperation, so perhaps increase the
  entrance fee to €15 or €20.

o  Depending on how intense your coasters are, guests will start to complain
  about the paths being disgusting. Add plenty of benchs and bins outside
  ride exits and hire a few Handymen. Also hire one/two security gaurds,
  an entertainer and two/three mechanics - a roller coaster park needs
  plenty of mechanics.

o  Income will slowly start to climb up - €2,000, €3,000, €4,000. However as
  visiter numbers cross 500 and eventually 1,000, you should add an
  information kisok near the entrance to supplement your income. Also start
  building tolits across the park - charge 20c entrance for each.

o  The next problem will be the complaints "I'm Thirsty" - note NOT "I'm
  hungry." So start building a few Wanton Soap Stalls, Drinks Stalls, Hot
  Chocolates Stalls, Iced Tea Stalls and Lemonade Stalls throughout the park.

o  To start pulling in the big money you will need to increase your entrance
  fee to over €50 - but people will only pay this if you can offer plenty of
  rides. But to build rides you need money. So firstly start advertising the
  park, raise the entrance fee to €25 and start building a few smallish
  roller coasters - Wooden Wild Mouse, Wild Mouse, Junior Roller Coaster,
  Mini Roller Coaster etc. As your number of Roller Coasters increases,
  slowly raise your entrance fee in line with coasters, as you hit about
  10-12 coasters you can rise to €50.

o  As your income tops out at €10,000 a month, start adding food stalls and
  gift stalls throughout the park. This will hopefully add another €750 to
  the bottom line.

o  Start to market yourself even more aggresively and continue building new
  roller coasters - 1 per month at a cost of perhaps €9-€15k each.

o  There is no need to pay off your debt for the moment before you ask. It
  does not decrease your park value.

o  Build an ATM beside your entrance and main food areas, this is because when
  your entrance fee hits €60, people start running out of money.

o  Continue the building until you hit a park value of €500,000 then start
  paying off your death.
______________________________________________________________________________
                             3-G Infernal Views
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................A park nestled percariously on lava rock with
                               streams of magma.
Objectives......................To have at least 10 different rollercoasters
                               with excitement ratings of at least 6.00
Initial Guests in Park..........67
Initial Rating..................459
Park Size.......................1,257,960 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€43,039
Initial Park Value..............€43,039
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Wooden Roller Coaster 1

o Aim to build at least 3 rollercoasters a year (if not more) over excitment
 rating 6.00.

o Don't waste time on rollercoasters under 6.00. You have'nt the money or time
 to spare.

o Just because your objective is rollercoasters, don't ignore thrill/gentle
 rides - they can produce the revenue to pay for expensive rollercoasters.

o Don't custom design the coasters if possible - a) you cannot predict if they
 will have a high enough excitement rating or not, b) it is more expensive to
 custom design rides, and c) it is time consuming.

o The simplist way to complete your task is to build the 10 cheapest pre-made
 rollercoasters over excitement rating 6.00.

o Don't forget you've a park to run! Devot at least 30% of your time to
 managing money, staff, attracting guests and solving problems.
______________________________________________________________________________
                             4-A Alpine Adventures
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Convert a small mountain ski resort into a
                               snow-themed amusemant park.
Objectives......................To achieve a ticket income of €7,000 per
                               month.
Initial Guests in Park..........13
Initial Rating..................250
Park Size.......................1,034,660 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 8% per year
Initial Company Value...........€84
Initial Park Value..............€84
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............Chairlift 1

o Firstly up the ticket price of Chairlifts 1 to reflect its excitement
 rating.

o Ignore the idea of a "snow themed" park, just build lots of high profit
 rides - don't waste time themeing your park.

o The terrain is tricky to build on snd you don't want expensive high supports
 - so when building rollercoasters, custom design them - the premade ones
 will be very expensive due to high supports.

o Build plenty of thrill rides with high excitement ratings - not low
 excitement gentle rides because the higher the rating - the higher the ride
 income.

o Borrow only to finance the major rollercoasters - not small rides, small
 rides should be paid for by cashflow.

o Hire plenty of mechanics - you want all your rides running at all times to
 keep making money.

o Advertise to boost guest numbers - the more guests the more money you can
 make.

o After you've built a good few rides, go to your older rides and check the
 ticket price equals the excitement ratings because as more rides are built
 around one another - their ratings increase - and if you can boost ticket
 prices by 10c each your overall ride income will dramatically increase.
______________________________________________________________________________
                             4-B Extreme Heights
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Free of financal restrictions, your challenge
                               is to expand this desert park to attract
                               people seeking the ultimate thrill.
Objectives......................To have at least 4,500 guests in your park and
                               to keep the park rating above 700.
Initial Guests in Park..........165
Initial Rating..................780
Park Size.......................2,328,810 sq.ft.
Buy Land........................No
Buy Construction Rights.........No
Notable point...................No Money/Unlimited Funds park
Profit System...................Free to enter, Free for Rides

o This park is very easy because you don't have to manage money - however you
 must keep ratings above 700 at ALL times - this is hard enough.

o Firstly hire plenty of staff - entertainers, handymen, mechanics and
 security gaurds. Also start laying straight forward paths and building
 plenty of toilets, stalls and first aid rooms. These will keep your task
 of keeping the park ratin above 700 easy.

o Build, build, build all sorts of rides - thrill rides, water rides, gentle
 rides and rollercoasters - you want to attract all sorts of people.

o Build plenty of exciting rollercoasters to attract guests. Build toilets,
 benchs, bins and first aid rooms at all intense ride exits to keep vomit
 levels low on the streets.

o Theme your park to increase your park rating.

o Aim to achieve a park rating of 999 - if you aim and fall short - you will
 still have a high enough rating to win - set your sights high always to win
 - be ambitious.
______________________________________________________________________________
                                4-C Ghost Town
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Hired by a large amusement park chain, your
                               task is build a giant rollercoaster park
                               around an abandoned mine.
Objectives......................To have 10 different types of rollercoasters
                               with minimum lengths of 3,937 feet and
                               excitement ratings of 7 and over.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................510,310 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Free to enter, Pay for Rides
Rides Already Built.............None

o It would be nice to build a nicely themed park with wooden rollercoasters
 and western theming - but that takes time. The quickest route to success is
 building plenty of pre-designed new rollercoasters.

o As I said earlier don't waste your time on any coaster under 7.00 excitement
 rating because thats a waste of money and time. Also don't build any coustom
 rollercoasters - because if you fail to get the 7 rating then it proves a
 massive waste of time and money.

o You need plenty of money to pay for your rollercoasters - so get guest
 numbers up - but ignore your ratings because guests will spend the same
 whether your rating is 500 or 900.

o The interest rate is fair enough - so take advantage of it to borrow plenty
 of money to build rollercoasters.

o A few high excitement thrill rides will generate important cash for new
 rollercoasters. However don't spend to long building these.
______________________________________________________________________________
                                4-D Lucky Lake
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................With unlimited funds but a challenging lake
                               location, to expand and manage
Objectives......................To have 2,100 guests and a park rating above
                               700 at all times.
Initial Guests in Park..........129
Initial Rating..................751
Park Size.......................662,310 sq.ft.
Buy Land........................No
Buy Construction Rights.........No
Notable point...................No Money/Unlimited Funds park
Profit System...................Free to enter, Free for Rides
Rides Already Built.............Mine-Train-Twister 1
                               Merry-Go-Round 1
                               Twist 1

o This park is again very easy because you don't have to manage money -
 however again you must keep ratings above 700 at ALL times.

o Hire plenty of staff - entertainers, handymen, mechanics and
 security gaurds. Lay straight forward paths across the lake that are easy
 for guests to navigate. Build plenty of toilets, stalls and first aid
 rooms to keep the park rating above 700.

o Build a few thrill rides and gentle early to keep guests occupied until
 you can build a few major rollercoasters.

o Build plenty of massive rollercoasters to attract guests. Build toilets,
 benchs, bins and first aid rooms at all intense ride exits to keep vomit
 levels low on the streets.

o Build a transport network to make park navigation easier for guests.
______________________________________________________________________________
                              4-E Rainbow Summit
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build on a hillside, this park is forbiddin
                               from building anything tall. Can you expand
                               the park and make it successful?
Objectives......................To have at least 2,500 guest in your park at
                               the end of October Year 4 and the park rating
                               must be at least 600.
Initial Guests in Park..........286
Initial Rating..................768
Park Size.......................1,234,420 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 5% per year
Initial Company Value...........€80,315
Initial Park Value..............€80,315
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Chairlift 1
                               Trams 1
                               Wooden Rollercoaster 1

o Borrow plenty to finance rollercoasters (all coustom made due to the height
 restriction) - the interest rate is very cheap at 5%.

o Build plenty of thrill rides and gentle rides because they are easy to build
 and meet the height restriction.

o Since the range of rides you can (easily) build is low - theme your park to
 attract guests.

o Build rollercoasters beside one another to boost their individual excitement
 rating.

o Gradually raise the entrance price - maybe by €15 every year - however don't
 go over €60ish because some guests don't bring anything over €60 and thus
 must turn around and go home.
______________________________________________________________________________
                              5-A Six Flags Belgium
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Try your hand at running and improving this
                               Six Flags Park
Objectives......................To have at least 3,500 guest in your park at
                               the end of October Year 4 and the park rating
                               must be at least 600.
Initial Guests in Park..........1592
Initial Rating..................999
Park Size.......................1,137,950 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€372,048
Initial Park Value..............€372,048
Buy Land........................Yes
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Calamity Mine
                               Cheshire Cats 1
                               Cobra
                               Enterprise 1
                               Flash Back
                               Ferry's Wheel
                               Loup-Garou
                               Magic Carpet 1
                               Merry-Go-Round 1
                               Pirate Ship 1
                               Radja River
                               Six Flags Express
                               The Screamer
                               Tornado
                               Turbine
                               Twist 1
                               Vampire
                               Vintage Cars 1

o This level is more about running and managing than expanding your park. So
 instead of building loads of new rides, spend your time and money marketing,
 hiring staff and managing money.

o Keep the entrance fee as low as possible to attract guests - your aim is
 guest numbers not money.

o You can build a few rides - not many - but make sure to theme them nicely so
 they merge well with the park.

o Listen to guest complaints such as those about hunger, thrist and lack of
 toilets - remember the park rating is important.

o Hire plenty of staff to keep things running smoothly.
______________________________________________________________________________
                        5-B Six Flags Great Adventure
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build the missing Six Flags rides, or create
                               your own to improve the park! But don't forget
                               your ultimate aim - to attract more guests to
                               the park.
Objectives......................To have at least 3,000 guest in your park and
                               the park rating must'nt drop below 700.
Initial Guests in Park..........1931
Initial Rating..................896
Park Size.......................2,020,590 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€426,027
Initial Park Value..............€426,027
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Big Wheel
                               Blackbeards Lost Treasure Train
                               Buccaneer
                               Carousel
                               Congo Rapids
                               Go Karts 1
                               Great American Scream Machine
                               Medusa
                               Nitro
                               Rolling Thunder [Track 1]
                               Rolling Thunder [Track 2]
                               Runaway Mine Train
                               Skull Mountain
                               Skyride 1
                               Skyride 2
                               Space Shuttle
                               The Twister

o Again this level is more about running and managing than expanding your
 park. So only build a few rides each year.

o Assign mechanics to specific rollercoasters - breakdowns will cause chaos
 in this level.

o Keep entrance costs low to keep guest numbers up. Also build plenty of
 toilets, stalls etc., to keep guests happy.
______________________________________________________________________________
                            5-C Six Flags Holland
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Try your hand at running and improving this
                               Six Flags Park
Objectives......................To have at least 3,500 guest in your park at
                               the end of October Year 4 and the park rating
                               must be at least 600.
Initial Guests in Park..........1325
Initial Rating..................943
Park Size.......................1,281,390 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 6% per year
Initial Company Value...........€398,068
Initial Park Value..............€398,068
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Capitian Kid
                               Cavalli Borocca
                               Crazy River
                               El Condor
                               El Rio Grande
                               Excalibur
                               Flying Dutchman Gold Mine
                               G-Force
                               Goliath
                               Il Gladiatore
                               La Grade Roue
                               La Via Volta
                               Le Tours Des Jardins
                               Les Petils Cheveux
                               Les Sombreros
                               Merlins Magic Castle
                               Robin Hood
                               Six Flags Express
                               Space Shoot

o The interest rate is low so you can borrow to help pay for marketing and
 staff expenses.

o Again build only a few new big rides, try to keep them to the back of the
 park - this causes guests to spend longer in the park.

o Hire plenty entertainers and assign them to the busy queues to keep guests
 happy.
______________________________________________________________________________
                          5-D Six Flags Magic Mountain
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build the missing Six Flags rides, or create
                               your own to improve the park! But don't forget
                               your ultimate aim - to repay your loan while </pre><pre id="faqspan-2">
                               keeping the park value up!
Objectives......................Achieve a park value of €700,000 and repay
                               your loan.
Initial Guests in Park..........2,781
Initial Rating..................697
Park Size.......................2,216,720 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€50,000
Debt Rate.......................5% per year
Initial Company Value...........€764,261
Initial Park Value..............€804,261
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Arrowhead Splashdown
                               Buccaneer
                               Circus 1
                               Colossus [Track 1]
                               Colossus [Track 2]
                               Crooked House 1
                               Cyclone 500
                               Dé ja Vu
                               Enterprise 1
                               Ferris Wheel 1
                               Flashback
                               Gold Rusher
                               Goliath
                               Grand Carousel
                               Granny Gran Prix
                               Haunted House 1
                               Log Jammer
                               Metro
                               Motion Simulator 1
                               Ninja
                               Orient Express 1
                               Orient Express 2
                               Psyclone
                               Revolution
                               Roaring Rapids
                               Sandblaster
                               Sky Tower
                               Swashbuckler
                               The Escape [Track 1]
                               The Escape [Track 2]
                               Tidal Wave
                               Twist 1
                               Twist 2
                               Viper

o Your park value must stay above €700,000 - so don't just sell off all your
 rides - however it is worth selling one or two (a park value of exactly
 €700,000 will do) - but make sure they are two of the least profitably
 rides.

o Raise your entrance fee if guests are coming to your park in droves -
 however don't let it get much higher than €60.

o Build shops and stalls to generate extra money. However close any that still
 lose money after 6 months.

o Spend pretty much all your income on reducing your debt. This park is
 relatively easy - its just a matter of patience.
______________________________________________________________________________
                            5-E Six Flags over Texas
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build the missing Six Flags rides, or create
                               your own to improve the park! But don't forget
                               your ultimate aim - to attract more guests to
                               the park.
Objectives......................To have at least 3,500 guest in your park and
                               the park rating must'nt drop below 700.
Initial Guests in Park..........1,684
Initial Rating..................900
Park Size.......................1,590,600
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 12% per year
Initial Company Value...........€449,582
Initial Park Value..............€449,582
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............Bumper Cars
                               Conquistador
                               Flashback
                               Go Kart Track
                               Judge Roy Scream
                               La Vilrora
                               Missile Chaser
                               Oil Derrick
                               Ozarka Splash
                               Railroad
                               Roaring Rapids
                               Shockwave
                               Silver Star Carousel
                               Splash Water Falls
                               Texas Giant
                               Titan

o Build a few rides but not many. The majority of your money should be spent
 on attracting guests and keeping them happy.

o Don't borrow much because the interest rate is very very high at 12% per
 year.

o Keep maintence of rides a priority because guest satisfaction is very
 important.
______________________________________________________________________________
                    6-A Build your own Six Flags Belgium
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build your own version of this European Six
                               Flags Park.
Objectives......................To have at least 3,500 guests by the end of
                               October, Year 5 with a park rating of at least
                               600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,137,920 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 7% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                6-B Build your own  Six Flags Great Adventure
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Use your design skills to recreate this Six
                               Flags Park.
Objectives......................To have at least 2,500 guests by the end of
                               October, Year 5 with a park rating of at least
                               600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................2,020,590 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 10% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                      6-C Build your own Six Flags Holland
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Build this European Six Flags Park the way you
                               want to.
Objectives......................To have at least 3,500 guests by the end of
                               October, Year 6 with a park rating of at least
                               600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,281,390 sq.ft
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 6% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                  6-D Build your own Six Flags Magic Mountain
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Create your own version of this massive Six
                               Flags Park.
Objectives......................To repay your loan and achieve a park value
                               of at least €700,000.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................2,216,720 sq.ft
Initial Cash....................€10,000
Initial Debt....................€50,000
Debt Rate.......................at 5% per year
Initial Company Value...........-€40,000
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                    6-E Build your own Six Flags over Texas
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Task......................Starting from scratch build the rides in this
                               Six Flags Park.
Objectives......................To have at least 3,000 guests by the end of
                               October, Year 5 with a park rating of at least
                               600.
Initial Guests in Park..........0
Initial Rating..................0
Park Size.......................1,590,600 sq.ft.
Initial Cash....................€10,000
Initial Debt....................€10,000
Debt Rate.......................at 12% per year
Initial Company Value...........€0
Initial Park Value..............€0
Buy Land........................No
Buy Construction Rights.........No
Profit System...................Pay to enter, Free for Rides
Rides Already Built.............None

o The build your own parks are open books - just expand, build and market.
______________________________________________________________________________
                       7-A1 Air Powered Vertical Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track consists of steel of steel girders. Trains run
                         on rubber tires to give a smooth ride, with up-stop
                         wheels below.
Special Track Elements....Banked Curve, Vertical Track
Maximum track slope.......90°
Vehicles..................Air Powered Coaster Train
Other Info................The train is launched out of the station by an air-
                         powered launch system. To achieve a comfortable
                         ride, the launch speed should be carefully chosen
                         so the train is travelling at a minimum speed over
                         the crest of the hill.
Approximate Cost..........€6,750 upwards
Comments..................This is quite a tricky rollercoaster to design,
                         practice in the designer.
Tips for Construction.....This rollercoaster really does'nt give you much
                         choice on how to build it, all you can really do is
                         build rides like Wings of Apollo, except with
                         different themeing.
______________________________________________________________________________
                            7-A2 Bobsleigh Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is a semi-circular channel, supported by
                         tubular steel posts. Cars run on small wheels, and
                         are free to take their own course along the track,
                         guided only by the curvature and gradient of the
                         channel.
Special Track Elements....Banked Curves, Banked Helix
Banked Curves.............50° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..90ft
Vehicles..................Bobsleigh Cars
Other Info................Track layout requires very careful planning, as cars
                         can crash off the track at the crests of hills if it
                         is going to fast.
Approximate Cost..........€2,700 upwards
Comments..................Again this rollercoaster does not offer a lot of
                         choice other than going around and around in
                         circles.
Tips for Construction.....1)In Bobsled coasters you must be careful not to
                         have too high of a speed going into a turn, crashs
                         easily occur.
                         2)Stick with Helixs, they are both easy to use, fun
                         and compact.
                         3)There is no need to go too high, 40ft is more than
                         enough.
______________________________________________________________________________
                       7-A3 Compact Inverted Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders sit in pairs of seats suspended beneath the
                         track as they loop and twist through tight
                         inversions
Special Track Elements....S-Bends, Vertical Loops, In-Line-Twists, Half Loops,
                         Half Corkscrews, Helixs, On-Ride-Photos, Block
                         Breaks
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..175ft
Vehicles..................Compact Inverted Coaster Cars
Approximate Cost..........€3,750 upwards
Comments..................Lots of choice
Tips for Construction.....1)Be careful, don't let average speed get too high
                         2)One of everything makes a great coaster
                         3)Check out the pre-made designs.
______________________________________________________________________________
                         7-B1 Corkscrew Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a tubular steel spine, connected to the
                         inside edges of tubular steel running rails.
                         Supporting are large tubular steel posts. Trains
                         are held on the track by wheels above, below and
                         outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                         Loop, Corkscrew, Banked Helix, On-Ride Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..239ft
Vehicles..................Roller Coaster Train
Other Info................Can give a slightly rough ride, but allows the
                         most complex track elements to be used, and can
                         be built up to a large height.
Approximate Cost..........€3,900 upwards
______________________________________________________________________________
                         7-B2 Floorless Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Wide coaster trains with no floor give the
                         passengers an open-air feeling as they glide through
                         twisted track and multiple inversions.
Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes,
                         On-Ride-Photo, Barrel Roll, Large Half Loop, Quarter
                         Loop, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..165ft
Vehicles..................Floorless Roller Coaster
Other Info................Complicated coaster, best to avoid designing until
                         you have mastered other coasters. Use predesigned
                         coasters as guide
Approximate Cost..........€4,500 upwards
______________________________________________________________________________
                          7-B3 Flying Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a tubular steel spine, connected to the
                         outside edges of tubular steel running rails.
                         Supports are large tubular steel posts. Trains are
                         held on the track by wheels below and inside the
                         running rails.
Special Track Elements....Banked curves, Vertical Loop, Steep Twist, Banked
                         Helix, On-Ride Photo, Inline Twists
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..145ft
Vehicles..................Flying Roller Coaster Train
Other Info................To give the feeling of flight, the passengers ride
                         in a lying-down position. The track can twist to
                         allow the riders to travel face-up with the track
                         below them, or suspended face-down with the track
                         above them.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                               7-C1 Flying Turns
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders career down a twisting track in large
                         bobsliege cars guided only by the curvateur and
                         banking of the semi-circular track.
Special Track Elements....Helixes, Block Brakes, Banking
Maximum track slope.......60°
Lift hill maximum slope...30°
Max. Height above ground..90ft
Vehicles..................Flying Turns Car
Other Info................Like the bobslighe coaster, accidents occur very
                         easily, so be careful with speed and bends.
Approximate Cost..........€2,500 upwards
______________________________________________________________________________
                               7-C2 Giga Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............A giant steel roller coaster capable of smooth drops
                         and hills of over 300ft.
Special Track Elements....Helixes, On-Ride-Photos, Cable lift, Block Brakes,
                         Banking
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..425ft
Vehicles..................Giga Coaster Train
Other Info................Only design your own ones after checking out
                         the pre-made ones.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                       7-C3 Heartline Twister Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track consists of tubular steel running rails
                         running through circular steel hoops. Cars run
                         centrally between the rails, allowing heartline
                         twists.
Special Track Elements....Heartline Roll
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..95ft
Vehicles..................Twister Cars, Twister Cars (Reversed)
Other Info................Due to the constraints of the track and car design,
                         corners are not possible, so build a complete
                         circuit special transfer tracks are used to transfer
                         between a lower and an upper track.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                              7-D1 Hypercoaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............A tall non-inverting roller coaster with large
                         drops, high speed, and comfortable trains with only
                         lap bar restraint.
Special Track Elements....Helixes, On-Ride-Photos, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..220ft
Vehicles..................Hypercoaster trains.
Other Info................Extermly expensive to build, and hard to design, try
                         only at advanced stages.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                         7-D2 Inverted Harpin Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Individual cars run beneath a zig-zagging track with
                         hairpin turns and sharp drops.
Special Track Elements....Block Brakes
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..75ft
Vehicles..................Inverted Hairpin Coaster Cars
Other Info................Easy to build, also quite cheap - good ride to build
                         early on in a park.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                        7-D3 Inverted Impluse Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Inverted roller coaster trains are accelerated out
                         of station to travel up a vertical spike of track,
                         then reverse back through the station to travel
                         backwards up another spike of track.
Special Track Elements....None
Maximum track slope.......90°
Max. Height above ground..215ft
Vehicles..................Inverted Impulse Coaster Trains
Other Info................Short ride that is quite exciting, great revenue
                         generator if your charging per ride.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-E1 Inverted Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a square-section steel spine, connected to
                         the inside edges of tubular steel rails. Supports
                         are large square-section steel posts. Trains hang
                         underneath the track, held in position by wheels
                         above, below and outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Inline
                         Twist, Half Loop, Corkscrew, Banked Helix, On-Ride
                         Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..180ft
Vehicles..................Inverted Roller Coaster
Other Info................An Inverted Roller Coaster feels more intense and
                         exciting than a sit-down roller coaster; due to
                         the exposed feeling the riders have with their feet
                         dangling below them and the lack of a car around
                         them.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                         7-E2 Inverted Shuttle Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders sit in pairs facing either fowards or
                         backwards as they loop and twist through tight
                         inversions.
Special Track Elements....Vertical loop, In-Line-Twist, Half Loop, Half
                         Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                         Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Inverted Shuttle Coaster Train.
Other Info................Lovely cheap and exciting ride, makes plenty of
                         money. Be careful with design to avoid crashs.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-E3 Inverted Vertical Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders sit in cars suspended beneath the track,
                         pulled backwards up a vertical track and then
                         dropped to loop and twist around tight inversions.
Special Track Elements....Vertical Loop, In-Line-Twist, Half Loop, Half
                         Corkscrew, Helixes, On-Ride-Photo, Block Brakes,
                         Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Inverted Vertical Coaster Shuttle
Other Info................Difficult to design, stick with pre-made coasters
                         like De Javu.
Approximate Cost..........€2,500 upwards
______________________________________________________________________________
                          7-F1 Junior Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............A gentle roller coaster for people who have'nt yet
                         got the courage to face the larger rides.
Special Track Elements....Helixes, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..55ft
Vehicles..................Log Trains,
                         Ladybird Trains,
Other Info................Easiest roller coaster in the entire game to design,
                         you can hom your designing skills by practicing with
                         this one. Its also very chesp.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                        7-F2 LIM Launched Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Roller Coaster trains are accelerated out of
                         station by linear induction motors to speed through
                         twisting inversions.
Special Track Elements....Vertical Loops, In-Line-Twists, Half Corkscrews,
                         Helixes, On-Ride-Photo, Quarter Loops, Block Brakes,
                         Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Max. Height above ground..170ft
Vehicles..................LIM Roller Coaster Trains.
Other Info................Interesting at a glance...but noting special.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                         7-F3 Lay-down Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders are held in special harnesses in a laying
                         down position, traveling through twisted track and
                         inversions either on their backs or laying on the
                         ground.
Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo,
                         In-Line-Twist, Half Loop, Half Corkscrew, Block
                         Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..125ft
Vehicles..................Lay-Down Roller Coaster Train
Other Info................Great coaster if you can builds it - and pay for it!
Approximate Cost..........€4,500 upwards
______________________________________________________________________________
                         7-G1 Looping Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Roller Coaster trains with lap bars capable of
                         traveling through vertical loops.
Special Track Elements....Vertical Loops, Helixes, On-Ride-Photo, Block
                         Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..170ft
Vehicles..................Looping Coaster Train
Other Info................Standard roller coaster.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                               7-G2 Mine Ride
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Powered mine trains career along a smooth and
                         twisted track layout.
Special Track Elements....Helixes, On-Ride-Photo, Banking.
Banked Curves.............50° banking
Maximum track slope.......25°
Max. Height above ground..60ft
Vehicles..................Mine Trains
Other Info................Great coaster when mixed with plenty of well placed
                         mine theming.
Approximate Cost..........€3,000 upwards
______________________________________________________________________________
                           7-G3 Mine Train Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track consists of tubular steel rails, fastened
                         to a wooden support structure. Trains are held
                         on the track by wheels above, below and outside
                         the running rails.
Special Track Elements....Banked Curves, Banked Helix, On-Ride Photo
Banked Curves.............50° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..100ft
Vehicles..................Mine Train Coaster
Other Info................The Mine Train is all about fast, smooth, twisted
                         track, and can be improved considerably by adding
                         tunnels.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                          7-H1 Mini Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has steel running rails with cross-bracing.
                         Supports are thin square-section posts. Trains are
                         held on the track by wheels above, below and
                         outside the running rails.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..75ft
Vehicles..................Automobile Cars,
                         Rocket Cars,
                         Toboggon,
Other Info................Cheaper than other types of roller coaster, but
                         can't be as tall and curves can't be banked.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                        7-H2 Mini Suspended Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Passengers ride in small cars hanging beneath the
                         single rail track, swinging freely from side to side
                         around corners.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..45ft
Vehicles..................Swinging Cars
Other Info................Easy coaster if your on a tight budget and not great
                         at designing coasters.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                     7-H3 Mini Suspended Flying Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Passengers ride face-down in a lying position,
                         suspended in a specially designed car from the
                         single rail-track, swinging freely from side to
                         side.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..45ft
Vehicles..................Swinging Cars
Other Info................Similer to Mini Suspended Coaster.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                           7-I1 Motorbike Races
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders ride motorbike-shaped roller coaster
                         vehiles along a single-rail track.
Special Track Elements....Block Breaks.
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Motorbikes
Other Info................Boring ride, but cheap and cheerfull.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                     7-I2 Multi-Dimension Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Siting in seats suspended either side of the track,
                         riders are pitched head-over-heels while they plunge
                         down steep drops and travel through various
                         inversions.
Special Track Elements....Helixes, On-Ride-Photo, In-Line-Twist, Block Breaks,
                         Quarter Loop, Seat Rotations.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Multi-Dimension Coaster Train
Other Info................Incrediably difficult coaster to design - only
                         attempt to design in designer.
Approximate Cost..........€10,000 upwards
______________________________________________________________________________
                         7-I3 Reverse Freefall Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............The car is accelerated out of the station along a
                         long level track using Linear Induction Motors, then
                         heads straight up a vertical spike of track,
                         freefalling back down to return to the station.
Special Track Elements....Slope up Vertical, Vertical Track.
Maximum track slope.......90°
Max. Height above ground..575ft
Vehicles..................Reverse Freefall Car
Other Info................Great ride to put at park edge. Highest roller
                         coaster in the game.
Approximate Cost..........€2,000 upwards
______________________________________________________________________________
                          7-J1 Reverser Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is laminated wood, topped with a flat steel
                         running rail, constructed on a wooden support
                         structure. Cars run on bogies guided along the
                         track by side-friction wheels running. Special
                         sections of track are used to turn the car around,
                         allowing it to run backwards.
Special Track Elements....Reversing Sections
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..85ft
Vehicles..................Reverser Cars
Other Info................Can leave guests quite nauseaus if you build too
                         many reverser sections.
Approximate Cost..........€1,750 upwards
______________________________________________________________________________
                        7-J2 Side-Friction Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is laminated wood, topped with a flat steel
                         running rail, constructed on a wooden support
                         structure. Trains are guided along the track by
                         side-friction wheels running inside wooden guide
                         rails.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..70ft
Vehicles..................Wooden Side Friction Cars
Other Info................Cheap and easy to build, the track layout needs to
                         be designed carefully, otherwise cars can fly
                         straight off the track on hills.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                            7-J3 Soap Box Derby
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders ride soap-box car shaped vehicles along a
                         single rail roller coaster track.
Special Track Elements....Block Brakes
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Soap-box derby cars
Other Info................Very simple ride for less intense riders.
Approximate Cost..........€1,000 upwards
______________________________________________________________________________
                         7-K1 Spinning Wild Mouse
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Mouse shaped cars speed through tight corners and
                         short drops, gently spinning round to disorintate
                         riders.
Special Track Elements....Spinning Control Toggle Track, Block Brakes.
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..75ft
Vehicles..................Spinning Wild Mouse Cars
Other Info................Nice ride, but results in many nauesus guests.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                         7-K2 Sprial Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............A compact steel-tracked roller coaster with spiral
                         lift hill and cars with in line seating.
Special Track Elements....Helixes, On-Ride-Photo, Curved Lift Hill, Block
                         Brakes, Banking.
Banked Curves.............30° banking
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..90ft
Vehicles..................Spiral Roller Coaster Train
Other Info................Really good ride to start off with, very cheap.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                        7-K3 - Stand-up Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a tubular steel spine, connected to the
                         inside edges of tubular steel running rails.
                         Supporting are large tubular steel posts. Trains
                         are held on the track by wheels above, below and
                         outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Half Loop,
                         Corkscrew, On-Ride Photo
Banked Curves.............30° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..120ft
Vehicles..................Stand-Up Roller Coaster Cars
Other Info................Gives a more intense ride than a sit-down roller
                         coaster, so the track requires careful design to
                         avoid high G forces, especially lateral G's.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                        7-L1 - Stand-up Twister Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders ride in a standing position in wide coaster
                         trains with specially designed restraints as they
                         race down smooth drops and through multiple
                         inversions.
Special Track Elements....Vertical Loop, Half Loop, Half Corkscrew, Helixes,
                         On-Ride-Photo, Barrel Roll, Large Half Loop,
                         Quarter Loop, Block Brakes, Banking.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Stand-Up-Twister Coaster Trains
Other Info................Excellent ride, but yet again very hard to build
                         and very costly.
Approximate Cost..........€7,500 upwards
______________________________________________________________________________
                             7-L2 - Steeplechase
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Riders ride horse shaped vehicles which run along a
                         single rail coaster track.
Special Track Elements....Block Brakes
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Horses
Other Info................Nice cheap space filler - but noting more than that.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                        7-L3 - Suspended Swinging Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a tubular steel spine, connected to the
                         inside edges of tubular steel running rails.
                         Supporting are large tubular steel posts. Trains
                         hang underneath the track, swinging freely on a
                         chassis held on by wheels above, below, and
                         outside the running rails.
Special Track Elements....Banked Helix, Block Brakes
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..110ft
Vehicles..................Suspended Swinging Aeroplane Cars,
                         Suspended Swinging Cars
                         Swinging Floorless Cars,
Other Info................A good Suspended Roller Coaster requires plenty of
                         curves and helixes to provide high lateral G's
                         to swing the cars.
Approximate Cost..........€3,750 upwards
______________________________________________________________________________
                        7-M1 - Twister Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a box-section steel spine, connected to
                         the inside edges of tubular steel running rails.
                         Supports are large tubular steel posts. Trains
                         are held on the track by wheels above, below, and
                         outside the running rails.
Special Track Elements....Banked Curves, Vertical Loop, Steep Twist, Half
                         Loop, Corkscrew, Banked Helix, On-Ride Photo,
                         Barrel Roll, Launched Lift Hill, Large Loop and
                         Half Loop.
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...25°
Max. Height above ground..195ft
Vehicles..................Twister Roller Coaster
Other Info................Articulated Trains allow this type of roller
                         coaster to use a wide variety of twisted track
                         and inversions.
Approximate Cost..........€5,000 upwards
______________________________________________________________________________
                      7-M2 - Vertical Drop Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track has a square section steel spine, connected to
                         the inside edges of tubular steel running rails.
                         Supports are large square section steel posts.
                         Trains are held on the track by wheels above, below,
                         and outside the running rails.
Special Track Elements....Banked Curves, Steep Twist, Banked Helix, On-Ride
                         Photo, Vertical drop, Holding Brake (for vertical
                         drop)
Banked Curves.............50° banking
Maximum track slope.......90°
Lift hill maximum slope...60°
Max. Height above ground..260ft
Vehicles..................Vertical Roller Coaster Cars
Other Info................Gives a smooth ride with limited scope for special
                         track, but allows vertical track to be built.
Approximate Cost..........€4,000 upwards
______________________________________________________________________________
                           7-M3 - Virgina Reel
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is flat-bottomed wooden trough. The cars are
                         guided along the track by the sides of the trough,
                         spinning as they touch the sides.
Special Track Elements....None
Maximum track slope.......25°
Lift hill maximum slope...25°
Max. Height above ground..65ft
Vehicles..................Reel Tubs
Other Info................Design the track layout with as many corners as
                         possible to keep the cars spinning.
Approximate Cost..........€1,000 upwards
______________________________________________________________________________
                            7-N1 - Water Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Boat shaped Cars run on roller coaster track to
                         allow twisting curves and steep drops, splashing
                         down into sections of water.
Special Track Elements....Helixes, Block Brakes, Water, Banking.
Bank Curves...............50°
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..85ft
Vehicles..................Coaster Boats
Other Info................Lovely coaster - keep relatively short and fast.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                          7-N2 - Wild Mouse Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track consists of tubular steel rails. Supports
                         are large tubular steel posts. Cars are held on
                         the track by wheels above, below and outside the
                         running rails.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..75ft
Vehicles..................Mouse Cars,
                         Mine Cars,
Other Info................A good Wild Mouse Roller Coaster is all about
                         tight turns and sudden drops - the more intense
                         the better.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                      7-N3 - Wooden Roller Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is laminated wood, topped with a flat steel
                         running rail, constructed on a wooden support
                         structure. Trains are held on the track by upstop
                         wheels, which run under the inside edge of the
                         rails.
Special Track Elements....Banked Curves, Vertical Loop, On-Ride Photo,
                         Water Splash, Helixes
Banked Curves.............60° banking
Maximum track slope.......60°
Lift hill maximum slope...25°
Max. Height above ground..200ft
Vehicles..................Wooden Roller Coaster Train,
                         Articulated Roller Coaster Trains,
                         Wooden Roller Coaster Train - 6 seater,
                         Wooden Roller Coaster Train - 6 seater (Reversed)
Other Info................A good Wooden Roller Coaster is fast, has plenty
                         of air-time, some lateral G's, steep drops, and
                         is designed to feel 'out-of-control'.
Approximate Cost..........€3,500 upwards
______________________________________________________________________________
                       7-O1 - Wooden Wild Mine Ride
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯</pre><pre id="faqspan-3">
Construction..............Tiny Mine Trucks run on zig-zagging wooden track,
                         tilting percariously around hairpin turns and
                         vicious drops.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..65ft
Vehicles..................Wooden Wild Mine Ride Cars
Other Info................A good Wild Mouse Mine Ride uses plenty of the
                         available mine themeing with sharp drops and sudden
                         bends, all at constantly changing speeds.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                          7-O2 - Wooden Wild Mouse
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Construction..............Track is laminated wood, topped with a flat steel
                         running rail, constructed on a wooden support
                         structure. Cars are held on the track by mushroom
                         shaped pegs, running between steel guide rails in
                         the centre of the track, allowing the cars to
                         tilt over the corners.
Special Track Elements....None
Maximum track slope.......60°
Lift hill maximum slope...60°
Max. Height above ground..65ft
Vehicles..................Wooden Wild Mouse
Other Info................A good Wild Mouse Roller Coaster is all about
                         tight turns and sudden drops - the more intense
                         the better.
Approximate Cost..........€1,500 upwards
______________________________________________________________________________
                           8-A1 - 3D Cinema
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€560
Running Cost per hour.....€49.60
Modes.....................3D Film - 'Mouse Tails'
                         3D Film - 'Storm Chasers'
                         3D Film - 'Space Raiders'

o The most important strategy for 3D Cinemas is to change the film running
 every few months so that the same guests visit 2 or 3 times.

o If you want to build more than one 3D Cinema in the one park - keep them
 well away from one another so that everyone in the park has a chance to use
 a 3D Cinema.
______________________________________________________________________________
                           8-A2 - Boat Hire
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€205+ (depends on platform lenght)
Running Cost per hour.....€73.60
Modes.....................Boat Hire Mode

o Don't build the boat hires in too large of a lake because boats will get
 lost and not return to the platform.

o Build your platform as long as possible, so you can offer as many boats as
 possible.
______________________________________________________________________________
                          8-A3 - Bumper Cars
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€440
Running Cost per hour.....€108.80
Modes.....................Bumper Car Mode

o Nice ride to build near the park entrance - it gets peoples happiness rating
 up quickly - and the happier the guest - the quicker they spend money.
______________________________________________________________________________
                           8-B1 - Chairlift
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on track lenght
Running Cost per hour.....€Mediocre - depends on track lenght
Modes.....................Continuous Circuit Mode
                         Shuttle Mode

o Use in mountainous levels to transport guest from point to point by
 individual chairs.

o Build more than two platforms to make the system more useful for guests and
 to get more chairs (thus more guests can ride at any one time.)

o You can increase the ride ride - do this in parks where people pay for each
 ride - this will mean more paying guests per hour.
______________________________________________________________________________
                          8-B2 - Chesire Cats
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Low - depends on track lenght and height
Running Cost per hour.....€Low - depends on no. of cars
Modes.....................Continuous Circuit

o Theme with trees and shrubs. Placing a fence or hedge around the perimater
 of the ride gives a nice final touch.

o Don't build too complex of a track - keep it short with a few twists because
 the maximum excitement rating your likely to get is not going to change much
 with ride lenght.
______________________________________________________________________________
                           8-B3 - Circus Show
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€500
Running Cost per hour.....€49.60
Modes.....................Circus Show Mode

o Circus shows are best built beside large rollercoasters - the guests who
 don't like intense ride will then choose the Circus.
______________________________________________________________________________
                          8-C1 - Crooked House
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€250
Running Cost per hour.....€28.80
Modes.....................Crooked House Mode

o Very cheap to build and complements the gentle ride sections of your park,
 however Crooked Houses are not very popular - so only build after you have
 built plenty of other rides.
______________________________________________________________________________
                           8-C2 - Cycle Railway
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on track lenght and height
Running Cost per hour.....€Mediocre - depends on no. of cycles
Modes.....................Continuous Circuit

o Themeing with fences, hedges, bushs, flowers, statues, water features ect.
 will boost the otherwise relativly low excitement rating.

o Again Cycle railways tend to attract the less-intense rider, so place near
 intense rides to give guests a good choice.
______________________________________________________________________________
                     8-C3 - Double-Deck Observation Tower
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride height
Running Cost per hour.....€60.80
Modes.....................Continuous Circuit Mode

o Build either in the centre of your park or at the entrance - the entrance
 option will allow guests to get an idea of where rides are - the centre will
 give guests the best view.

o You can build more than one tower - but keep them apart from each other -
 they are'nt the most popular rides.

o Over time as the park grows, the towers excitement rating increases - make
 sure to keep increaseing the price to equal the rating.
______________________________________________________________________________
                              8-D1 - Elevator
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride height
Running Cost per hour.....€Mediocre - depends on ride height
Modes.....................Shuttle Mode

o Best off to stick with the pre-designed elevator - it is well designed and
 will fit in to any park.
______________________________________________________________________________
                             8-D2 - Enterprise
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€800
Running Cost per hour.....€49.60
Modes.....................Rotation Mode

o This is a great ride to build if you have very little cash - it is
 relatively cheap to build and makes a lot of money.
______________________________________________________________________________
                            8-D3 - Ferris Wheel
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€450
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Althought the traditional theme park demands a Ferris Wheel - its a classic,
 they tend to be very unpopular in rollercoaster tycoon - so only build one
 when you have developed most rides already.

o Building big rides (such as rollercoasters) near a ferris wheel boosts its
 excitement rating.
______________________________________________________________________________
                           8-E1 - Flying Saucers
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€560
Running Cost per hour.....€148.80
Modes.....................Bumper Car Mode

o Althought relatively popular with a good excitement rating - flying saucers
 cost a lot to run.
______________________________________________________________________________
                             8-E2 - Ghost Train
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride lenght
Running Cost per hour.....€Mediocre - depends on ride lenght and no. of trains
Modes.....................Continuous Circuit Mode

o Castle and building themeing suits ghost trains the best. However this
 usually means construction is very expensive.

o Best to stick with pre-designed tracks early on in parks where your money
 levels are low.
______________________________________________________________________________
                               8-E3 - Go Karts
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on track lenght/height
Running Cost per hour.....€65.60
Modes.....................Race Mode
                         Continuous Circuit Mode

o Building more than one Go Karts track beside another one boosts both tracks
 excitement rating considerably.

o Race mode thens to be the most popular mode, however in busy parks
 continuous circuit mode is also popular.

o Themeing is very important - any cort will work; mine, castle, wonderland
 etc. Also track layout boosts excitement ratings if there is lots of twists,
 elevations, underground sections and bridges.
______________________________________________________________________________
                             8-F1 - Haunted House
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€340
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Nice cheap ride to build and run - however not that popular - only build if
 you've built most other rides.
______________________________________________________________________________
                            8-F2 - Haunted Mansion
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride lenght and themeing
Running Cost per hour.....€Mediocre - depends on ride lenght and no. of cars
Modes.....................Continuous Circuit Mode

o Stick with thr pre-designed track layout - it is much easier and simplier to
 build than any coustom one.

o In coustom tracks make your paltform long and have plenty of cars, so the
 maximum number of guests can ride at anyone time.
______________________________________________________________________________
                               8-F3 - Hedge Maze
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Low - depends on lenght
Running Cost per hour.....€49.60
Modes.....................Maze Mode

o Again not that popular of a ride - only build after you have built plenty
 of more popular rides.
______________________________________________________________________________
                               8-G1 - Jet Skis
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€205+ (depends on platform lenght)
Running Cost per hour.....€60.80
Modes.....................Boat Hire Mode

o Don't build on too buig of a lake - riders won't return skis and the ride
 will lose money.

o Build a long platform - the longer it is the more skis the ride will have -
 thus more guests per hour and more money per hour.
______________________________________________________________________________
                               8-G2 - Log Flume
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Very High - depends on height/lenght
Running Cost per hour.....€High - depends on no. of flumes
Modes.....................Continuous Circuit Mode

o Very popular with guests, design for track to go up, over, under around
 other sections of the track to boost the excitement rating.
______________________________________________________________________________
                             8-G3 - Merry-Go-Round
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€460
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Not that popular, best built near busy paths - such as those beside
 foodcourts.

o Building merry-go-rounds in the centre of squares where people congregate
 makes them look good and boosts popularity. There music also boosts the
 park rating.
______________________________________________________________________________
                               8-H1 - Mini Cars
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on ride lenght and height
Running Cost per hour.....€High - depends on ride lenght and no. of cars
Modes.....................Continuous Circuit Mode

o For the less-intense rider, mini cars are'n that popular or profitable. Good
 themeing will boost the excitement rating a bit - but not that much.
______________________________________________________________________________
                               8-H2 - Mini Golf
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on ride lenght and no. of holes
Running Cost per hour.....€Low - depends on ride lenght and no. of holes
Modes.....................Continuous Circuit Mode

o Very popular - however not that profitable, because only a few people can
 use it at any one time.

o The pre-designed courses will give you an idea how to theme your own mini
 golf courses.
______________________________________________________________________________
                             8-H3 - Mini Helicopters
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on ride lenght and height
Running Cost per hour.....€Low - depends on ride lenght and no. of helicopters
Modes.....................Continuous Circuit Mode

o Yet again only for the the faint hearted - not popular or very profitable -
 themeing will increase the excitement rating a bit.
______________________________________________________________________________
                             8-I1 - Minituare Railway
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode

o Excellent ride - both helps guests get around and makes lots of money. Make
 sure to revise fares every few months as the excitement rating will increase
 due to other new rides improving guests view.

o Trees and rollercoasters beside the track wil increase the excitement
 rating.

o Make sure to have your stops at the least popular sections of the park - to
 make them popular.
______________________________________________________________________________
                               8-I2 - Monorail
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                         Shuttle Mode

o Very convient - and looks well if you build over path or rides.
______________________________________________________________________________
                               8-I3 - Monster Trucks
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on track lenght
Running Cost per hour.....€Mediocre -depends on track lenght and no. of trucks
Modes.....................Continuous Circuit Mode

o Use the pre-designed monster truck track to help design your own track -
 plenty of themeing will improve the excitement rating.
______________________________________________________________________________
                             8-J1 - Motion Simulator
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€440
Running Cost per hour.....€49.60
Modes.....................Film - 'Avenging Aviators'
                         Film - 'Thrill Riders'

o Switch the film regularly to get guests to use the simulator more than once.
______________________________________________________________________________
                            8-J2 - Observation Tower
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride height
Running Cost per hour.....€60.80
Modes.....................Continuous Circuit Mode

o Build either in the centre of your park or at the entrance - the entrance
 option will allow guests to get an idea of where rides are - the centre will
 give guests the best view.

o You can build more than one tower - but keep them apart from each other -
 they are'nt the most popular rides.

o Over time as the park grows, the towers excitement rating increases - make
 sure to keep increaseing the price to equal the rating.
______________________________________________________________________________
                                8-J3 - Raft Ride
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on lenght/elevation
Running Cost per hour.....€High
Modes.....................Continuous Circuit Mode

o Expensive and time consumeing to build - only build if you can afford to -
 however this ride is quite profitable and popular.
______________________________________________________________________________
                              8-K1 - River Rapids
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on ride lenght and no. features
Running Cost per hour.....€High - depends on no. of boats.
Modes.....................Continuous Circuit Mode

o Works well in a hilly park - where it is blended in to look like a real
 river.

o Very profitable and easy to build - make sure to have plenty of boats so
 more guests can use it at the same time.

o Make the queue path into a bridge over part of the river (if possible) to
 increase guests anticipation.
______________________________________________________________________________
                              8-K2 - River Ride
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - at least a €1,500, depends on track
Running Cost per hour.....€Mediocre - depends on no. rafts
Modes.....................Continuous Circuit Mode

o Expensive enough to build - wait until you have already built plenty of
 other rides.

o Themeing (particularly trees) will boost the excitement rating and thus the
 amount you can charge for guests to use the ride.
______________________________________________________________________________
                               8-K3 - Roto Drop
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Mediocre - depends on height
Running Cost per hour.....€60.60
Modes.....................Freefall drop mode
Max Capacity..............16

o One of the best thrill rides - build more than one in big parks because
 quite frankly there is plenty of demand for good thrill rides

o Roto Drops allow guests to see the whole park - so placing them in the
 centre of the park means; not only do they make lots of money; but also
 help guests find there way around.
______________________________________________________________________________
                               8-L1 - Snow Cups
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Low
Running Cost per hour.....€Low
Modes.....................Continuous Circuit Mode

o I've never actually used this ride (until I wrote this guide) because I find
 it boring and most guests do also.
______________________________________________________________________________
                              8-L2 - Space Rings
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€288
Running Cost per hour.....€49.60
Modes.....................Continuous Circuit Mode

o Very popular - however space ring shave alow capacity - so maybe build 2
 space rings beside each other if demand gets too high.
______________________________________________________________________________
                             8-L3 - Spiral Slide
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€330
Running Cost per hour.....€49.60
Modes.....................One Ride Mode
                         Unlimited Rides Mode

o The one ride mode is by fare the most profitable - don't even consider the
 unlimited rides mode in a park where guests pay for rides not the entrance
 fee.
______________________________________________________________________________
                          8-M1 - Suspended Monorail
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€Very High - depends on track lenght and height
Running Cost per hour.....€High - depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                         Shuttle Mode

o Same as the normal monorail - very convient and popular.
______________________________________________________________________________
                        8-M2 - Swinging Inverted Ship
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€387
Running Cost per hour.....€49.60
Modes.....................Swinging Mode

o Very good ride to strat off a park with - its cheap, popular and makes lots
 of money.
______________________________________________________________________________
                             8-M3 - Swinging Ship
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€424
Running Cost per hour.....€49.60
Modes.....................Swinging Mode

o Very good ride to strat off a park with - its cheap, popular and makes lots
 of money.
______________________________________________________________________________
                              8-N1 - Tram Ride
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on track lenght
Running Cost per hour.....€Mediocre -depends on track lenght and no. of trains
Modes.....................Continuous Circuit Mode
                         Shuttle Mode

o Suits a highly themed park - best left to some of the Six-Flags parks. Trams
 are popular however and very useful.
______________________________________________________________________________
                            8-N2 - Water Coaster
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - depends on lenght
Running Cost per hour.....€High - depends on capacity
Modes.....................Continuous Circuit Mode
                         Continuous Circuit Blocked Section Mode

o Very popular and easy to build. Suits a water themed park the best alongside
 log flumes and water slides.
______________________________________________________________________________
                             8-N3 - Water Slide
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Basic Cost................€High - at least €2,000, depends on dimensions
Running Cost per hour.....€High
Modes.....................Continuous Circuit Mode

o Be careful that the bottom of downward sections have cover top track -
 otherwise guests will fly off.

o Build a few water slides side by side to boost individual excitement
 ratings.
______________________________________________________________________________
                             9-A1 - Balloon Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200
Stock cost: €0.90
Ideal Price: €1.50
Profit: €0.60

Balloon Stalls sell balloons in a wide variety of colours. It is advisable not
to open any balloon stalls until guest numbers hit about 1,000+. Stalls should
be placed in areas where large numbers of people cross, particularly at path
intersections. If you have more than one balloon stall, make sure to offer
different colours - and as time progresses, change the colour of balloons in
all shops. Most parks can only support about 3 stalls, but they are likely to
be highly profitable. If you want a bit of fun, you can pop any balloons that
float off by clicking on them.
______________________________________________________________________________
                           9-A2 - Beef Noodle Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

I would'nt build Beef Noodle Stall's given the choice, the base product cost
is quite high, so you cannot charge over more than €2, or you will deter
guests, so this leaves a low profit margin. However they do offer guests a
change from the burgers and chips. Beef Noodle Stall's also really suit
the oriental themed areas of your park.
______________________________________________________________________________
                               9-A3 - Burger Bar
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Burger bars are the standard food shop. They tend to be very profitable and
are ideally suited to busy unthemed areas such as entrance zones or food
courts. Unfortuatly they look rather unoriginal and dull. You can boast
profits by placing burger bars near the exits of long queue rides, because
guests tend to have built up an appetite after queuing for ages.
______________________________________________________________________________
                             9-B1 - Candy Apple Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.70
Ideal Price: €1.20
Profit: €0.50

Candy apple stalls will only make serious cash when placed in certain high
footfall areas such as path intersections. Ride exits work well also althought
not as good as squares or path crossings. However overall Candy Apples don't
make as much money as say Chicken Nugget's.
______________________________________________________________________________
                               9-B2 - Cash Machine
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200

Cash machines are essential in all parks - both pay at entrance and pay at
ride parks. In pay at entrance parks, cash machines should be placed near
entrance areas and particularly food courts. In pay at ride parks, machines
should be built everywhere - particularly near the back of the park.
______________________________________________________________________________
                           9-B3 - Chicken Nuggets Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Quite profitable, can turn profit in most loctions, even in small parks
because chicken nuggets are substantial and easily cover guests hunger.
Chicken Nugget Stalls can be the ancor for your food court and is likely to
be the first to brake even.
______________________________________________________________________________
                               9-C1 - Coffee Shop
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.90
Profit: €0.70

Great oppertunities here, great profit margin and a very popular product. This
is definatly one of the best drink stalls. Place throughout park - mainly
beside food stalls.
______________________________________________________________________________
                               9-C2 - Cookie Shop
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Cookies euh? Sounds good right? Well not really, profit margin is quite low
and product does not really fill guests. Only build in large parks and in
food courts.
______________________________________________________________________________
                           9-C3 - Cotton Candy Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.80
Ideal Price: €1.30
Profit: €0.50

Good profitable stall, althought don't go mad with them. Fits in nicely in
themed areas - particularly wonderland. Profits are highest at cross roads,
ride exits and high footfall food courts.
______________________________________________________________________________
                              9-D1 - Donut Shop
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Not spectacular, at €1 you will need to sell a lot of donuts, so set your
sights only on burgers in particularly busy parks and especially in busy
areas.
______________________________________________________________________________
                              9-D2 - Drink Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Drink stalls are the most important and most profitable shops in the game
apart from Burger Bars - and pairing them with Burger Bars will result in
great profits. Place at ride exits, path crossings, squares etc. and you
can't go wrong.
______________________________________________________________________________
                           9-D3 - First Aid Station
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250

Not as important as you may think. Only build a few clustered near roller
coasters and high nausea rides such as launched freefalls. Rembember every
extra one costs you in running costs.
______________________________________________________________________________
                          9-E1 - Fried Chicken Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Middle of the road shop, only build for variety and not really in the hope
of a massive profit like that seen in Burger Bars. Pairing with drink stalls
makes good fiscal sense.
______________________________________________________________________________
                        9-E2 - Fried Rice Noodles Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €2.00

Again only really for variety - althought the money helps! Suits the oriental
theming in particular and goes well with other simerally themed shops, stalls
and rides.
______________________________________________________________________________
                              9-F1 - Fries Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Fries are lovely profit makers, like burger bars, fries are staples and
everyone will eat them. At €0.50 margin you won't go hungery!
______________________________________________________________________________
                           9-F2 - Fruity Ices Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.70
Ideal Price: €1.00
Profit: €0.30

Another stall that is only mediocare. You can build it for varity, but stick
to sunny parks that have plenty of guests. Just remember €0.30 is pateatic
compared to €0.60 you can get from funnel cakes. Also they don't really fill
guests up.
______________________________________________________________________________
                           9-F3 - Funnel Cake Shop
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

Great snack food. €0.60 is a great profit margin for a snack stall. Will suit
most parks with reasonable level of guests.
______________________________________________________________________________
                               9-G1 - Hat Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Nice cheap souvenires. You will sell lots of these in any park with guests, so
build a good few throught your park. Ride exits are the best places because
guests tend to be happier and more willing to spend money when in a great
mood.
______________________________________________________________________________
                           9-G2 - Hot Chocolate Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Nice alternative drink to coffee or lemonade. Build near food stalls or ride
exits to sell more.
______________________________________________________________________________
                              9-G3 - Hot Dog Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.00
Ideal Price: €1.50
Profit: €0.50

Great value for guests with high profit margin. Whats more hot dogs really
fill guests up. As always have drink stalls nearby to maximise profit.
______________________________________________________________________________
                          9-H1 - Ice Cream Cone Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €0.90
Ideal Price: €1.50
Profit: €0.60

Ice cream is an ideal product for your parks, especially in hot, sunny parks.
Place Ice Cream stalls anywhere and everywhere, if you have enough guests they
will always make a profit.
______________________________________________________________________________
                             9-H2 - Iced Tea Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

Again use just for variety, althought Iced Tea Stalls will turn a profit.
Their really good feature is how cool they look!
______________________________________________________________________________
                           9-H3 - Information Kiosk
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €0.60 (Maps), €2.50 (Umbrellas)
Ideal Price: €1.20 (Maps, €3.00 (Umbrellas)
Profit: €0.60 (Maps), €0.50 (Umbrellas)

Single greatest shop in the game. You can make a fortune from maps and
umbrellas. When it rains raise umbrella prices, however in sunny parks keep
umbrella prices low. Make sure to build plenty of kiosks, particularly in
areas that guests get lost in.
______________________________________________________________________________
                            9-I1 - Lemonade Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

Ok, like any drink stall besides the original drinks stall, this is just for
variety. Sunny parks are as always the best for drink stalls such as the
Lemonade stall.
______________________________________________________________________________
                         9-I2 - Meatball Soup Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Meatball Soup? => Oriental style soup stall. Nice in themed areas, althought
noting special.
______________________________________________________________________________
                             9-I3 - Pizza Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.60
Ideal Price: €2.30
Profit: €0.70

Pizza stalls are lovely profit makers, OK I might charge over the odds... but
who does'nt like pizza! In reality these are just for varitey. Make sure you
have plenty of bins and benchs near stall.
______________________________________________________________________________
                            9-J1 - Popcorn Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.20
Ideal Price: €1.60
Profit: €0.40

Popcorn stalls are OK, they are yet again for variety. They look well near
cinemas obviosly! However they do not really fill up guests properally.
______________________________________________________________________________
                            9-J2 - Pretzel Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.10
Ideal Price: €1.50
Profit: €0.40

A light snack, Pretzels are only Ok, and like popcorn, they have only limited
profit potential.
______________________________________________________________________________
                              9-J3 - Restroom
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €225
Ideal Price: €0.10 - €0.30

Restrooms can be usful as money makers. I am usually content with break-even
toilets, but prefer to make money from them.
______________________________________________________________________________
                              9-K1 - Restroom 2
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €225
Ideal Price: €0.10 - €0.30

The log cabine style restrooms looks a sight better from the other
prefabricated restrooms. They suit particularly wooded areas. Again you can
try to make a small profit from them.
______________________________________________________________________________
                          9-K2 - Roast Sausage Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

OK, no complaints. Roast susages are simply put - different. €0.50 is an OK
profit margin.
______________________________________________________________________________
                            9-K3 - Seafood Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.10
Profit: €0.60

Cool stall! Profit margin is ok and as ever, this is just for variety. One or
two to a park is enough.
______________________________________________________________________________
                            9-L1 - Souvenir Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200
Stock cost: €2.50 & €2.50
Ideal Price: €3.00 & €3.00
Profit: €0.50

Great money spinner. Ideal location is at park exit or ride exits (for when
guests are happy and want to spend money.)
______________________________________________________________________________
                          9-L2 - Soybean Milk Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.90
Profit: €0.70

Chris Sawyer really wanted variety in this game. Well if your going to give
guests something different, you might as well charge over the odds for it!
Will suit nicely in themed areas.
______________________________________________________________________________
                        9-L3 - Star Fruit Drink Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.80
Profit: €0.60

More variety, adding to the endless choice the consumer has... nice profit
margin thought and nice stall.
______________________________________________________________________________
                         9-M1 - Sub Sandwich Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Great stall, makes me hungery just writing about it. Quite popular and really
filling for guests.
______________________________________________________________________________
                          9-M2 - Sujongkwa Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €250
Stock cost: €1.20
Ideal Price: €1.70
Profit: €0.50

What?
______________________________________________________________________________
                          9-M3 - Sunglasses Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

Obviously sunglasses sell best in sunny parks, so if you've a sunny park you
can charge over the odds.
______________________________________________________________________________
                           9-N1 - T-Shirt Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €200
Stock cost: €3.00
Ideal Price: €4.00
Profit: €1.00

Great profit maker. Build a few that are well spaced and offer different
colours in each.
______________________________________________________________________________
                           9-N2 - Wonton Soup Stall
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Cost: €300
Stock cost: €1.50
Ideal Price: €2.00
Profit: €0.50

More of the oriental flavor... just adds variety.

______________________________________________________________________________
                           10-A - Staff Organisation
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
________
Handymen
¯¯¯¯¯¯¯¯
o The best way to organise handymen is to firstly assign 75% of your handymen
 to specific places that tend to get dirty - ride exits, foodcourts etc. The
 other 25% should be let roam free doing odd jobs.

o It is pointless getting lawns mowed - never assign handymen to this task.
_________
Mechanics
¯¯¯¯¯¯¯¯¯
o Assign handymen to cover 4 or 5 rides that are close to one another. This
 means ride downtime is minimised.

o You can adjust the frequency of ride checkups in the ride control screen
 on rides that frequently breakdown - this improves mechanic efficency.
_______________
Security Gaurds
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
o Assign security gaurds to trouble spots like foodcourts.
______________________________________________________________________________
                                10-B - Queues
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Queues are very important, so here I'll explain the ground rules regarding
queues.
__________________________
Not to Long - Not to Short
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Queues should never be too long, no matter which ride they belong to. This is
because...

a) guests get fed up and your park rating suffers,
b) you have to pay extra entertainers to keep them happy,
c) everyone ends up in a queue for the popular rides and there is thus no one
  left to ride other less popular rides, so they lose money,
d) since there are fewer people walking around, less money is spent in shops
  and stalls,

Similerly queues should not be too short because...

a) trains/carriages will end up leaving half empty,
b) paths will suffer from crowding sooner,
____________
Ideal lenght
¯¯¯¯¯¯¯¯¯¯¯¯
The ideal lenght is approximatly 2 times the max train/carriage load - that is
about 24 people for most queues.
_______
Routing
¯¯¯¯¯¯¯
Queues should not just be wraped around one another such as...

Start
| |_________
|_________  |
|  _________|
|_________  |
       Finish

..instead they should becarefully routed around the ride, under the track and
around the theming. This increases the excitement of the ride.
__________
Other Tips
¯¯¯¯¯¯¯¯¯¯
o Use TV Moniters in queues to increase guests anticipation and thus their
 excitement levels. This also reduces complaints of bordem. 2 Moniters is
 enough for any queue.

o Themeing ride queues increases guests general happiess.

o You can choose from a variety of queue types, try various ones to make
 different rides more interesting.
______________________________________________________________________________
                         10-C - Adding Excitment to Rides
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
The best ways to increase your income is to boost your excitement rating,
heres how:

o Theme rides - theming boosts guests overall enjoyment of a ride - even trees
 and fences boost excitement ratings.

o Interlock track - if you have more than one track banking and curving around
 another - guests will find the ride much more exciteing.

o Build rides beside one another - riders will gain some excitement from the
 nearby rides.

o Build high, over water and underground - althought it is costly, it boosts
 the excitement rating by a considerable amount.
______________________________________________________________________________
                                  10-D - Q&A
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
The Q&A section is devided up into Technical questions and gereneral ones.
____________________
Technical Questions:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Q: On my computer when I insert the disc in, a message appears "Please insert
  disc into Drive "D", why?
A: RTC2 only works in Drive D, and never addational drives such as "E", this
  as far as I know cannot be changed.

Q: What are the system requirements?
A: OS: Windows 98/Me/XP/2K
  Processor: Intel Pentium II 300 MHz
  Memory: 64 MB (128 recommended)
  Hard Drive Space: 120 MB free drive space (200MB free recommended)
  CDROM drive: 8x Speed (16x recommended)
  Graphics card: DirectX 8.1 Compliant Video Card with 8 MB RAM
  Sound card: DirectX 8.1 Compliant Sound Card
  DirectX version: 8.1 (Included)

Q: While playing RCT2 crashs or sometimes appears poorly coloured, help!
A: If you do not have at least 120MB of free space while running RCT2, you
  can experience problems like these.
________
General:
¯¯¯¯¯¯¯¯
Q: When playing the scenario "Six Flags Great Adventure" after getting the
  3,000 required guests, the level does not immediatly finish, why?
A: In this level guest numbers are only checked at the end of each day, so it
  takes a little longer for the game to self terminate.
______________________________________________________________________________
                         10-E - Reader Contributions
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Anything worth saying? Well send it in!
______________________________________________________________________________
                            10-F - Websites/Links
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
http://www.rollercoastertycoon2.com - the offical website.
http://rct.ogresnet.com - major RCT site with news, downloads...
http://www.rct-2.com - RCT downloads
http://www.lott.co.uk/rct.htm - RCT downloads, cheats etc.
http://www.coasterforce.com/RCT/index.php - Tracks and Downloads.
______________________________________________________________________________
                           10-G - Rest in Series
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
The RCT series is constantly expanding across all areas. For more information
regarding these Roller Coaster Tycoon games check Gamefaqs, or some of the
websites/links mentioned earlier in this FAQ. The following are in order of
release. NB. Expansion packs require the original game to function.

Roller Coaster Tycoon................................PC
Roller Coaster Tycoon: Added Attractions Pack........PC.........Expansion Pack
Roller Coaster Tycoon: Corkscrew Follies Expansion...PC.........Expansion Pack
RollerCoaster Tycoon: Loopy Landscapes...............PC.........Expansion Pack
Roller Coaster Tycoon 2..............................PC
Roller Coaster Tycoon 2: Wackey Worlds...............PC.........Expansion Pack</pre><pre id="faqspan-4">
______________________________________________________________________________
                          10-H - Cheats/Easter Eggs
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Change the name of a guest...

Andy Hine...........Guest thinks "Nice ride but not as good as the Phoenix"
Brayshaw............Guest waves
Chris Sawyer........Guest takes photos of rides
Damon Hill..........Go-Karts go faster
David Ellis.........Guest thinks "and here we are on the [rollercoaster
                   name]"
Elissa White........Guest loves coasters such as the "Giga Coaster" and
                   "Impulse Coaster" which are designed by Intamin and
                   guest thinks "brilliant...it's an Intamin Ride"
Katie Brayshaw......Guest waves
Tony Day............Guest get hungry
John Wardley........Guest thinks "Wow!"
John Mace...........Guest pays double ride entrance fee
Melanie Warn........Guest is happy (park rating increases)
Michael Schumacher..Go-Karts go even faster
Mr Bean.............Go-Karts slow down
Simon Foster........Guest paints pictures of rides
(source: Cobbled together from various websites including Gamfaqs)

You can have more than one person with the same name by changing the
capitalization of various letters. For example Chris Sawyer can be used on
another person by making all letters lower or upper case...
chris sawyer => CHRIS SAWYER.  (source: Bostjan Cigan's FAQ)
______________________________________________________________________________
                             10-I - Park Awards
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
There are many awards available in RCT2, here is a list of them in order of +
awards and - awards.
_________
+ Awards:
¯¯¯¯¯¯¯¯¯
Best Bathroom Facilities Award
Best Custom-Designed Rides Award
Best Gentle Ride Award
Best Park Food Award
Best Park Restrooms Award
Best Staff Award
Best Value Park Award
Best Water Rides Award
Cleanest Footpaths in the Country Award
Most Beautiful Park Award
Most Dazzling Ride Color Schemes Award
Park With The Best Roller Coasters Award
Safest Park Award
Tidiest Park Award
_________
- Awards:
¯¯¯¯¯¯¯¯¯
Most Confusing Park Layout Award
Most Disappointing Park Award
Most Untidy Park Award
Worst Food in the Country Award
Worst Park Food Award
Worst Scenery in the Country Award
Worst Value Park Award
______________________________________________________________________________
                      10-J - Term Dictionary/Information
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
__
A:
¯¯
Air Time - air time is the amount of time guests feel weightlessness.
Altitude - is a Ride's height from sea level, it is measured in feet (ft) and
          meters (m).
Apex - the point where the chain-lift stops on a rollercoaster, and the track
      slopes downwards.
Average Speed - the average speed a ride travels.
__
B:
¯¯
Banking - where ride track starts going at an angle.
Borrow - money you can get from the bank, but must be repaid with interest.
__
C:
¯¯
Cain-lift - also called pull chain, lifts rollercoaster up upward sloping
           track.
Cash - money you have now and can spend.
Cash-Flow - the amount of money coming in every month after expenses.
Climate - type of weather a park experiences.
Company value - value of your company (park value + cash - loans).
Construction Rights - ability to build over/under land, but not on it.
__
D:
¯¯
Debt - money borrowed from the bank.
Down-Time - amount of time rides have not been operating.
__
E:
¯¯
Entertainers - staff who entertain guests, principaly in ride queues.
Entrance fee - The price to enter the park or a particular ride.
Excitement rating - the excitement rating of a ride is how much excitement
                   your average guest experiences from a ride.
Expenditure - money going out (money you spend).
__
F:
¯¯
Finances - your income and expenditure
__
G:
¯¯
Gentle Rides - Rides designed for people seeking a less intense ride.
Grapes - also called charts, display information visually rather than by word.
__
H:
¯¯
Handymen - staff who do general maintence work of park grounds.
__
I:
¯¯
Income - money coming in (money you make), also known as revenue.
In-line-twist - rollercoaster section that flings train 360 degrees.
Interest - additional money repaid to the bank for there services.
Intensity rating - the intensity rating of a ride is how much intensity
                  your average guest experiences from a ride.
Inversions - number of complex twists and turns such as in-line-twists were
            riders are flung upside down.
__
L:
¯¯
Landscaping - adjusting land heights, patterns, theming planting trees etc.
Loan interest - money you pay for the privilage of having a loan.
Loans - money you have borrowed to spend on your park.
__
M:
¯¯
Marketing - money you spend on advertising and promoting your park.
Maximum Speed - this is the top speed a ride can go.
Mechanics - staff members who are responsible for making sure rides run safely
           and smoothly.
Music - you can add music to various rides to make them more unique.
__
N:
¯¯
Nauesua Rating - the nauesua rating of a ride is how sick an average guest
                feels after riding a particular ride.
Negative Vertical G's - the negative gravitional force exerted on each guest.
__
O:
¯¯
On-Ride-Photos - rollercoaster section that takes photos of guests riding
                train - guests later have the option of buying the photo.
__
P:
¯¯
Patrol - this is a function that lets certain staff members look after
        particular parts of a park.
Park value - value of your parks land + rides + theming + shops + stalls.
Park rating - combined feeling of all guests towards your park.
Popularity - percentage of people who decide to ride a particular ride after
            thinking about it.
Positive Vertical G's - the gravitional force exerted on each guest
Profit - money you earn, income - expenenses.
__
Q:
¯¯
Queue lenght - lenght of queue at a particular ride.
Queues - a queue is a special type of path that guests use to enter rides.
Queue time - lenght of time a guest must queue to enter a ride.
__
R:
¯¯
Reliabilty - percentage of time a ride is operating.
Repay- giving money back that you have borrowed.
Research - money you spend on developing new rides, also know as R&D.
Ride lenght - the lenght in meters or feet of ride track.
Ride time - how long a ride lasts.
Running costs - cost of keeping a ride operational.
__
S:
¯¯
Sacking - this is were you fire a staff member
Satisfaction - how much people liked a ride after riding it.
Scenario - another word for an individual level.
Security gaurds - staff who stop people from damaging park property.
Station platform - the area guests board and exit ride trains/cars.
Stock - items each shop must buy for re-sale to guests.
__
T:
¯¯
Thrill rides - rides that deliver fairly high ratings - but not quite as high
              as rollercoasters.
Transport rides - rides whose primary aim is not to make money or deliver
                 excitement, but to move guests from a to b.
__
W:
¯¯
Water Rides - rides based principaly around water.

______________________________________________________________________________
                         11-A - Balancing your Budget
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Some tips for balancing your budget:

o If the interest rate is high, try to pay back your loan earlier - if it is
 low, don't worry about paying it back.

o Cut your research budget if your tight on money - you can do with what you
 already have.

o Fire entertainers and security gaurds - you still need handymen and
 mechanics.

o Check all ride ticket prices equal the excitement ratings
______________________________________________________________________________
                              11-B - Currencys
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
As I promised at the start, heres a currency conversion table.
_____________ ___ ___ ___ ___ ___ ___ ___ ___ ___ ___
|             | € | £ | $ | FF| DM| K | G | L | ¥ |Pts|
|-------------|---|---|---|---|---|---|---|---|---|---|
|Euro (€)     |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Pound (£)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Dollar ($)   |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Francs (FF)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|D. Marks (DM)|  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Krona (K)    |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Guilder (G)  |  1|  1|  1|  1|  1|  1|  1|100|100|100|
|Lira (L)     |100|100|100|100|100|100|100|  1|  1|  1|
|Yen (¥)      |100|100|100|100|100|100|100|  1|  1|  1|
|Pesatas (Pts)|100|100|100|100|100|100|100|  1|  1|  1|
|_____________|___|___|___|___|___|___|___|___|___|___|
______________________________________________________________________________
                            12-A Version History
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Version: 1.0
Completion: 35%
Date/Time: 4th Jan 2003

-  Started FAQ, but quite basic still.

Version: FINAL
Completion: 100%
Date/Time: 4th July 2004

- Pretty much finished - maybe there will be a few small updates later - but
  main content is finished.
______________________________________________________________________________
                            12-B Full Copyright
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
This FAQ is copyright CGorman (Ciarán Gorman) 2002, 2003, 2004. If you want
this FAQ, just steal it and I will sue you, because it is to be exclusively
hosted through the internet by Gamefaqs, and no other website or affliation,
except of course any website I may own. Use of this FAQ through other mediums
such as print, is available through nogotiation. WARNING: This guide may
contain traces of nuts!... I mean spoilers.
______________________________________________________________________________
                            12-C Contact Notice
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
If you want to contact me you can email me at [email protected] - but
please don't send questions, I get enough as it is and this or other FAQ's
cover pretty much all there is to ask.
______________________________________________________________________________
                               12-D Credits
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
CJayC for Gamefaqs,
Myself for writing this guide,
Bostjan Cigan for the cheat hint,
______________________________________________________________________________
                                12-E Outro
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Hope you found this guide useful, thanks for reading and good luck. You can
visit my Gamefaqs contributor page at...

http://www.gamefaqs.com/features/recognition/15853.html