* * * * *
Busy beaver II
Still busy with work. Now that the majority of the Charlotte build out has
been completed, we're now catching up on some loose ends that frayed during
our trip out there.
[Attempting to configure a long range wireless access point] [1] [2] [To get
inside only required removing a bazillion screws] [3] [4] [And my desk is
getting a bit … messy] [5] [6]
One of the big projects today was trying to configure some long range
wireless access points we have. I initially thought one of the units was
defective, but it turns out that the serial adaptor, even though it's keyed,
has to be plugged in very carefully, because the keying is worthless (and
it's way too easy to plug the cable in wrong).
It also required removing about a bazillion screws to get inside the thing.
And there were also a zillion other smaller [DELETED-projects-DELETED]
[DELETED-problems-DELETED] issues that kept cropping up today.
[1]
gopher://gopher.conman.org/IPhlog:2006/08/25/thumb.p1010001.jpg
[2]
gopher://gopher.conman.org/IPhlog:2006/08/25/p1010001.jpg
[3]
gopher://gopher.conman.org/IPhlog:2006/08/25/thumb.p1010003.jpg
[4]
gopher://gopher.conman.org/IPhlog:2006/08/25/p1010003.jpg
[5]
gopher://gopher.conman.org/IPhlog:2006/08/25/thumb.p1010004.jpg
[6]
gopher://gopher.conman.org/IPhlog:2006/08/25/p1010004.jpg
Email author at
[email protected]