Path Computation Element (pce)
------------------------------
Charter
Last Modified: 2006-03-24
Current Status: Active Working Group
Chair(s):
Adrian Farrel <
[email protected]>
JP Vasseur <
[email protected]>
Routing Area Director(s):
Ross Callon <
[email protected]>
Bill Fenner <
[email protected]>
Routing Area Advisor:
Ross Callon <
[email protected]>
Mailing Lists:
General Discussion:
[email protected]
To Subscribe:
[email protected]
In Body: subscribe pce
Archive:
http://www.ietf.org/mail-archive/web/pce/
Description of Working Group:
The PCE Working Group is chartered to specify a Path Computation
Element
(PCE) based architecture for the computation of paths for MPLS and
GMPLS
Traffic Engineering LSPs.
In this architecture path computation does not occur on the head-end
(ingress) LSR, but on some other path computation entity that may
physically not be located on the head-end LSR.
The PCE WG will work on application of this model within a single
domain
or within a small group of domains (where a domain is a layer, IGP area
or Autonomous System with limited visibility from the head-end LSR).
At this time, applying this model to large groups of domains such as
the
Internet is not thought to be possible, and the PCE WG will not spend
energy on that topic.
The WG will specify a protocol for communication between LSRs (termed
Path Computation Clients - PCCs) and PCEs, and between cooperating
PCEs.
This protocol will be capable of representing requests for path
computation including a full set of constraints, will be able to return
multiple paths, and will include security mechanisms such as
authentication and confidentiality.
The WG will determine requirements for extensions to existing routing
and signaling protocols in support of PCE discovery and signaling of
inter-domain paths. Candidate protocols for extensions are RSVP-TE,
OSPF-TE, ISIS-TE and BGP. Any necessary extensions will be produced in
collaboration with the Working Groups responsible for the protocols.
The Working Group will also work on the definition of metrics to
evaluate path quality, scalability, responsiveness and robustness of
path computation models.
Work Items:
- Functional specification of MPLS and GMPLS Traffic Engineered LSP
path
computation models involving Path Computation Element(s). This
includes the case of computing the paths of intra and inter-domain
TE LSPs. Such path computation includes the generation of primary,
protection and recovery paths, as well as computations for
(local/global) reoptimization and load balancing. The WG will address
the inter-area (single IGP domain) scenario first. WG progress will be
evaluated before inter-AS related work is started.
- Specification of the PCE-based architecture.
- Specification of requirements and protocol extensions related to
the policy, and security aspects of PCE-based path computation
involving
PCEs of multiple administrative entities.
- In cooperation with protocol specific Working Group (OSPF, ISIS, IDR,
MPLS, CCAMP), development of routing (OSPF, ISIS, BGP) and LSP
signaling (RSVP-TE) extensions required to support PCE-based path
computation models.
- Specification of techniques in support of PCE discovery within and
across domains. Where such techniques result in the extensions of
existing protocols (e.g., OSPF, ISIS or BGP), this work will be done in
conjunction with the appropriate WGs.
- Specification of a new communication protocol for use between a PCC
and a PCE, and between PCEs. A single protocol will be selected from
among candidates that include the existing protocols defined in other
WGs.
- Definition of objective metrics to evaluate various criteria such as
the measurement of path quality, response time, robustness and
scalability of path computation models.
Review of the document "Requirements for path computation element in
GMPLS inter-domain networks" produced by the CCAMP WG.
Goals and Milestones:
Done Submit first draft of PCE architecture document
Done Submit first draft of PCE discovery requirements and protocol
extensions documents
Done Submit first draft of the PCE communication protocol
requirements
May 2005 Submit first draft of the definition of objective metrics
Done Submit first draft of the PCE communication protocol
specification
Done Submit PCE architecture specification to the IESG to be
considered as Informational RFC
Nov 2005 Submit first draft of applicability statement (describing the
processes and procedures for the use of the PCE architecture,
protocols and protocol extensions for inter-area MPLS and GMPLS
Traffic Engineering)
Nov 2005 Submit first draft of the MIB module for the PCE protocol
Done Submit PCE communication protocol requirements to the IESG to
be considered as an Informational RFC
Dec 2005 Submit PCE discovery protocol extensions specifications to the
IESG to be considered as a Proposed Standard
Dec 2005 Submit PCE communication protocol specification to the IESG to
be considered as a Proposed Standard
Feb 2006 Submit the applicability and metrics documents to the
considered as Informational RFCIESG to be
Feb 2006 Evaluate WG progress, recharter or close
Internet-Drafts:
Posted Revised I-D Title <Filename>
------ ------- --------------------------------------------
Nov 2005 Feb 2007 <draft-ietf-pce-pcep-06.txt>
Path Computation Element (PCE) communication Protocol (PCEP)
Nov 2005 Oct 2006 <draft-ietf-pce-inter-layer-req-03.txt>
PCC-PCE Communication Requirements for Inter-Layer Traffic
Engineering
Dec 2005 Dec 2006 <draft-ietf-pce-pcecp-interarea-reqs-05.txt>
PCE Communication Protocol (PCECP) Specific Requirements for
Inter-Area Multi Protocol Label Switching (MPLS) and
Generalized MPLS (GMPLS) Traffic Engineering
Apr 2006 Oct 2006 <draft-ietf-pce-inter-layer-frwk-02.txt>
Framework for PCE-Based Inter-Layer MPLS and GMPLS Traffic
Engineering
Aug 2006 Oct 2006 <draft-ietf-pce-interas-pcecp-reqs-01.txt>
Inter-AS Requirements for the Path Computation Element
Communication Protocol (PCECP)
Aug 2006 Jan 2007 <draft-ietf-pce-brpc-03.txt>
A Backward Recursive PCE-based Computation (BRPC) procedure to
compute shortest inter-domain Traffic Engineering Label
Switched Paths
Sep 2006 Feb 2007 <draft-ietf-pce-disco-proto-isis-02.txt>
IS-IS protocol extensions for Path Computation Element (PCE)
Discovery
Sep 2006 Feb 2007 <draft-ietf-pce-disco-proto-ospf-02.txt>
OSPF protocol extensions for Path Computation Element (PCE)
Discovery
Dec 2006 Dec 2006 <draft-ietf-pce-tc-mib-00.txt>
Definitions of Textual Conventions for Path Computation Element
Dec 2006 Dec 2006 <draft-ietf-pce-disc-mib-00.txt>
Definitions of Managed Objects for Path Computation Element
Discovery
Jan 2007 Jan 2007 <draft-ietf-pce-manageability-requirements-00.txt>
Requirements for Manageability Sections in PCE Working Group
Drafts
Request For Comments:
RFC Stat Published Title
------- -- ----------- ------------------------------------
RFC4655 I Aug 2006 A Path Computation Element (PCE) Based Architecture
RFC4657 I Sep 2006 Path Computation Element (PCE) Communication Protocol
Generic Requirements
RFC4674 I Oct 2006 Requirements for Path Computation Element (PCE)
Discovery