Public-Key Infrastructure (X.509) WG (pkix)
MONDAY, November 10, 2003 1530-1730
=================================
CHAIRs: Stephen Kent <
[email protected]>
Tim Polk <
[email protected]>
AGENDA:
1. WG Status and Direction
1.1 Document Status Review [Tim Polk (NIST)]
The working group has a number of Internet-Drafts. Many
documents are with the ADs or in various stages of WG Last Call.
Several others are ready for Last Call. (10 min.)
1.2 Proposed WG Milestones [Tim Polk (NIST)]
The working group milestones are out of date. New milestones are
needed; these milestones need to satisfy IESG direction for an orderly
closeout of WG activities. (10 min.)
2. PKIX WG Specifications
2.1 Subject Identification Method [TBD]
http://www.ietf.org/internet-drafts/draft-ietf-pkix-sim-01.txt
The current SIM draft introduces a number of new parameters.
While these parameters add additional complexity, they were
required to satisfy the draft's security requirements. The
presentation will focus on the security requirements and
proposed solution. Open issues will also be identified. (10 min.)
2.2 LDAP Schemas, String Values, and more
- Peter Gietz
The WG has a suite of LDAP-PKIX drafts forming a comprehensive solution
for LDAP based PKI information distribution. New drafts will be
published soon after this meeting; the presenter will discuss changes
that will appear in the new drafts. (15 min.)
2.3 Qualified Certificates Stefan Santesson
http://www.ietf.org/internet-drafts/draft-ietf-pkix-sonof3039-02.txt
Work on the QC document has continued in both PKIX and ETSI.
At least one more draft is envisioned; this presentation will describe
planned updates and propose a path for completion of the QC document.
(10 min.)
2.4 Certification Path Building Peter Hesse (Gemini Security)
http://www.ietf.org/internet-drafts/draft-ietf-pkix-certpathbuild-
01.txt
This document was written to provide guidance and
recommendations to developers building X.509 public-key certification
paths within their applications. The next draft is aimed for WG Last
Call; the presenter will discuss changes since -00 and additional
changes projected for the forthcoming -02 draft. (10 min.)
2.5 OCSP Mike Myers (TraceRoute)
http://www.ietf.org/rfc/rfc2560.txt
A number of issues regarding OCSP have resurfaced on the mailing
list. The presenter will summarize the issues from the mailing
list and present a way forward. (5 min.)
3. Liaison/Related Projects
The following specifications will update the WG on related activities.
3.1 OASIS PKI survey Steve Hanna (Sun)
The OASIS Public Key Infrastructure Technical Committee
conducted a web-based survey to identify the key barriers to PKI
deployment and usage. The TC is currently developing an Action Plan
to address these barriers. The presentation will address the survey
results and preview the action plan. (15 min.)
3.2 Path Validation Protection Profiles Tim Polk (NIST)
NIST is currently performing the interoperability testing for RFC 3280.
One aspect of that effort is the RFC 3280 path validation test suite
developed jointly by NIST, DigitalNet, and NSA. To promote independnet
testing based on the test suite, NIST has submitted protection profiles
for path validation modules for NIAP validation. (10 min.)