Public-Key Infrastructure (X.509) WG (pkix)

MONDAY, November 10, 2003 1530-1730
=================================

CHAIRs: Stephen Kent <[email protected]>
       Tim Polk <[email protected]>

AGENDA:

1. WG Status and Direction


1.1 Document Status Review [Tim Polk (NIST)]


      The working group has a number of Internet-Drafts.  Many
      documents are with the ADs or in various stages of WG Last Call.
      Several others are ready for Last Call. (10 min.)


1.2 Proposed WG Milestones [Tim Polk (NIST)]


      The working group milestones are out of date.  New milestones are
      needed; these milestones need to satisfy IESG direction for an orderly
      closeout of WG activities. (10 min.)


2. PKIX WG Specifications


   2.1  Subject Identification Method  [TBD]


      http://www.ietf.org/internet-drafts/draft-ietf-pkix-sim-01.txt


      The current SIM draft introduces a number of new parameters.
      While these parameters add additional complexity, they were
      required to satisfy the draft's security requirements.  The
      presentation will focus on the security requirements and
      proposed solution. Open issues will also be identified.  (10 min.)


   2.2 LDAP Schemas, String Values, and more
                               - Peter Gietz


      The WG has a suite of LDAP-PKIX drafts forming a comprehensive solution
      for LDAP based PKI information distribution.  New drafts will be
      published soon after this meeting; the presenter will discuss changes
      that will appear in the new drafts.  (15 min.)



   2.3 Qualified Certificates             Stefan Santesson


      http://www.ietf.org/internet-drafts/draft-ietf-pkix-sonof3039-02.txt


      Work on the QC document has continued in both PKIX and ETSI.
      At least one more draft is envisioned; this presentation will describe
      planned updates and propose a path for completion of the QC document.
      (10 min.)


   2.4 Certification Path Building        Peter Hesse (Gemini Security)


      http://www.ietf.org/internet-drafts/draft-ietf-pkix-certpathbuild-
01.txt


      This document was written to provide guidance and
      recommendations to developers building X.509 public-key certification
      paths within their applications.  The next draft is aimed for WG Last
      Call; the presenter will discuss changes since -00 and additional
      changes projected for the forthcoming -02 draft. (10 min.)


   2.5  OCSP                               Mike Myers (TraceRoute)


      http://www.ietf.org/rfc/rfc2560.txt



      A number of issues regarding OCSP have resurfaced on the mailing
      list.  The presenter will summarize the issues from the mailing
      list and present a way forward.  (5 min.)


3. Liaison/Related Projects


   The following specifications will update the WG on related activities.



   3.1 OASIS PKI survey                        Steve Hanna (Sun)


      The OASIS Public Key Infrastructure Technical Committee
      conducted a web-based survey to identify the key barriers to PKI
      deployment and usage.  The TC is currently developing an Action Plan
      to address these barriers.  The presentation will address the survey
      results and preview the action plan. (15 min.)


   3.2 Path Validation Protection Profiles     Tim Polk (NIST)


      NIST is currently performing the interoperability testing for RFC 3280.
      One aspect of that effort is the RFC 3280 path validation test suite
      developed jointly by NIST, DigitalNet, and NSA.  To promote independnet
      testing based on the test suite, NIST has submitted protection profiles
      for path validation modules for NIAP validation. (10 min.)