Common Control and Measurement Plane WG (ccamp)
Monday, November 10 at 0900-1130
================================
CHAIRS: Adrian Farrel <
[email protected]>
Kireeti Kompella <
[email protected]>
AGENDA:
Time available 150 minutes
Agenda bashing - chairs (5 mins)
Minute takers and blue sheets - chairs (5 mins)
Old charter, new RFCs - chairs (5 mins)
New charter - chairs (5 mins)
Summary of draft statuses - chairs (5 mins)
Summary of interactions with other WGs - chairs (5 mins)
ITU-T Liaison - Wesam (10 mins)
(40 minutes used)
Charter Work
*** Please include a statement of your charter ***
*** milestones and how you will meet them. ***
GMPLS MIBs
Tom (10 mins)
- draft-ccamp-ietf-gmpls-tc-mib-01.txt
- draft-ccamp-ietf-gmpls-lsr-mib-01.txt
- draft-ccamp-ietf-gmpls-te-mib-01.txt
Protection and Restoration
Dimitri (15 mins)
- draft-ietf-ccamp-gmpls-recovery-terminology-02.txt
- draft-ietf-ccamp-gmpls-recovery-analysis-02.txt
- draft-ietf-ccamp-gmpls-recovery-functional-01.txt
- draft-lang-ccamp-gmpls-recovery-e2e-signaling-02.txt
ASON Signaling Requirements
Jerry (10 mins)
- draft-ietf-ccamp-gmpls-ason-reqts-03.txt
Lyndon (10 mins)
- draft-ong-ccamp-3473-3474-iw-00.txt
Jerry (5 mins)
- draft-dimitri-ccamp-gmpls-rsvp-te-ason-00.txt
Adrian (2 mins)
- draft-iwata-mpls-crankback-07.txt
ASON Routing Requirements
Deborah (10 mins)
- draft-alanqar-ccamp-gmpls-ason-routing-reqts-00.txt
- Liaison statement to ITU-T
Tunneling Protocol
Ron (10 mins)
- draft-bonica-tunproto-05.txt
Multi-Area/AS/Region
Arthi (5 mins)
- draft-ayyangar-inter-region-te-01.txt
JP (5 mins)
- draft-vasseur-inter-as-te-01.txt
(122 minutes used)
Other drafts according to time available
*** Please be quick to allow others a chance. ***
*** If you don't have time, you should discuss ***
*** your draft on the mailing list. ***
Communication of Alarms
Lou (10 mins)
- draft-berger-ccamp-gmpls-alarm-spec-00.txt
Generalized MPLS Signaling for Layer-2 LSPs
Dimitri (10 mins)
- draft-papadimitriou-ccamp-gmpls-l2sc-lsp-00.txt
Component Link Recording and Resource Control for GMPLS
Link Bundles
Zafar (10 mins)
- draft-zamfir-explicit-resource-control-bundle-02.txt
(likely to run out of time)
Requirements for time-bounded notification of faults
Richard (5 mins)
- draft-rabbat-expedited-flooding-00.txt
Potential solutions for time-bounded notification of
faults
Vishal (5 mins)
- draft-rabbat-fault-notification-protocol-04.txt
- draft-rabbat-fnp-applicability-00.txt
Control plane architecture in GMPLS networks
Kohei (5 mins)
- draft-shiomoto-ccamp-cplane-architecture-00.txt
Extra class LSP service using protecting resources in
GMPLS networks
Kohei (5 mins)
- draft-pil-ccamp-extra-lsp-01.txt
Control plane resilience
Y. Kim (5 mins)
- draft-kim-ccamp-cc-protection-04.txt
Interaction between GMPLS RSVP-TE and LCAS
Y. Kim (5 mins)
- draft-kim-ccamp-interaction-grsvpte-lcas-00.txt
Multi-Granularity Optical Cross-Connect
Dae-Gun Kim (5 mins)
- draft-kim-ccamp-gmpls-mgoxc-01.txt
Resource Mapping for GMPLS with Heterogeneous Interfaces
Gyu Myoung Lee (5 mins)
- draft-choi-gmpls-resource-mapping-01.txt
Requirements of Burst-Level Control in Optical Networks
Jung Yul Choi (5 mins)
- draft-choi-burst-control-01.txt
Signaling Extension for the End-to-End restoration with SRLG
Jung Yul Choi (5 mins)
- draft-choi-ccamp-e2e-restoration-srlg-01.txt