--------------{PING}---------------
REPLY FROM 15 hosts
FILTER sane_defaults
REPLY FROM 1 host
TUNNEL -R
--------------{QED}---------------
CONNECTION ESTABLISHED
PARSING LOGS
----------{SHIP STATUS}-----------


       ` _ .
     _~      ´
    /       ° \
   /________|_|
  .        /D\
        /… | | …\       .
 .      \… |_|NV/
           \K/        ·
 ·          |        .
          \ °       /
  .        "… . . "


    Crew:
         *K-Pashar   Active,Rear
          D-Operator Active,Point
          V-Operator Sleeping
          N-Pashar   Sleeping

    Ship: Shields 33%:33%, Controlled Spin 1G (day 2/41)

K Reports: Simulating 1G as of yesterday. 29 days added to ETA.

K Remarks: Back-and-forth gravity discussions with N. Lost on a 2-1
          vote. D abstained. V did not. Now testing ship's spin
          functions. Hope those two are happy.